ML103190631: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML103190631
| number = ML103190631
| issue date = 10/29/2010
| issue date = 10/29/2010
| title = Watts Bar Nuclear Plant, Unit 2 - Amendment 101 to Final Safety Analysis Report (Fsar), Figure 2.5-589
| title = Amendment 101 to Final Safety Analysis Report (Fsar), Figure 2.5-589
| author name =  
| author name =  
| author affiliation = Tennessee Valley Authority
| author affiliation = Tennessee Valley Authority
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:,- I MOVEMENT 0 MOVEMENT 0 MOVEMENT 0 7 MOVEMENT 0 \ H FINAL SAFETY NOTEE: A: COMPLETION DATE IS THE FINISH DATE OF THE MAJOR STRUCTURAL CONCRETE. Added by Amendment 50 _. FIGURE 2.5-5119}}
{{#Wiki_filter:,-
I MOVEMENT 0 MOVEMENT 0 MOVEMENT 0 7
MOVEMENT 0
\
NOTEE: A: COMPLETION DATE IS THE FINISH DATE OF THE MAJOR Added b y Amendment 50 FINAL SAFETY H
STRUCTURAL CONCRETE.
FIGURE 2.5-5119}}

Latest revision as of 11:11, 11 March 2020

Amendment 101 to Final Safety Analysis Report (Fsar), Figure 2.5-589
ML103190631
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 10/29/2010
From:
Tennessee Valley Authority
To:
Office of Nuclear Reactor Regulation
References
Download: ML103190631 (1)


Text

,-

I MOVEMENT 0 MOVEMENT 0 MOVEMENT 0 7

MOVEMENT 0

\

NOTEE: A: COMPLETION DATE IS THE FINISH DATE OF THE MAJOR Added b y Amendment 50 FINAL SAFETY H

STRUCTURAL CONCRETE.

FIGURE 2.5-5119