ML11227A134: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 08/15/2011
| issue date = 08/15/2011
| title = Nineteenth Update to Disclosures Pursuant to 10 CFR Section 2.336; Tennessee Valley Authority
| title = Nineteenth Update to Disclosures Pursuant to 10 CFR Section 2.336; Tennessee Valley Authority
| author name = Chandler C C
| author name = Chandler C
| author affiliation = Tennessee Valley Authority
| author affiliation = Tennessee Valley Authority
| addressee name = Curran D, Roth D E
| addressee name = Curran D, Roth D
| addressee affiliation = Harmon, Curran, Spielberg & Eisenberg, LLP, NRC/OGC
| addressee affiliation = Harmon, Curran, Spielberg & Eisenberg, LLP, NRC/OGC
| docket = 05000391
| docket = 05000391
Line 17: Line 17:
=Text=
=Text=
{{#Wiki_filter:August 15, 2011 Ms. Diane Curran Harmon, Curran, Spielberg & Eisenberg, L.L.P.
{{#Wiki_filter:August 15, 2011 Ms. Diane Curran Harmon, Curran, Spielberg & Eisenberg, L.L.P.
1726 M Street NW, Suite 600  
1726 M Street NW, Suite 600 Washington, DC 20036 Mr. David Roth Office of the General Counsel U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 RE:    Nineteenth Update to Disclosures Pursuant to 10 CFR § 2.336; Tennessee Valley Authority (Watts Bar Nuclear Plant, Unit 2), Docket No. 50-391-OL Pursuant to 10 CFR § 2.336 and the agreement among the parties regarding mandatory discovery disclosures dated December 1, 2009, the Tennessee Valley Authority (TVA) is providing the nineteenth update to its mandatory disclosures with respect to Intervenors Contention 7, as admitted by the Board on November 19, 2009 (LBP-09-26).
In order to compile the indices in Enclosures 2, 3, and 4, a search was conducted of documents in TVAs possession, custody, or control since the eighteenth update to disclosures dated July 15, 2011. Attached is a supporting affidavit. TVAs nineteenth disclosure update consists of the following:
* Enclosure 1 provides the names, addresses, and telephone numbers of the persons upon whose opinion TVA will base its positions on the contention and upon whom TVA may rely as a witness, and a copy of the analyses and authorities upon which they base their opinions.
* Enclosure 2 provides a description, by category and location, of non-privileged documents, data compilations, and tangible things in the possession, custody, or control of TVA that are relevant to the admitted contentions in this proceeding. If you determine that you would like a copy of any of these documents, please inform me of which documents you would like, and I will provide a copy to you.
* Enclosure 3 provides an index of documents, data compilations, or tangible things that may be relevant to the contentions but that contain proprietary information, Sensitive Unclassified Non-Safeguards Information (SUNSI), or otherwise protected information. Upon request by the NRC staff, TVA will provide a copy of any such material using the procedure in 10 CFR
    § 2.390. TVA will provide any requested proprietary documents to the Intervenors after the Board has entered a Protective Order and the Intervenors have signed and returned to TVA the Non-Disclosure Agreement.
* Enclosure 4 provides an index of relevant documents that are otherwise publicly available.


Washington, DC 20036
Ms. Diane Curran Mr. David Roth Page 2 August 15, 2011 In the event that TVA identifies additional relevant documents or the witnesses for any hearing on the contentions, TVA will update these disclosures periodically on the fifteenth day of each month as required by the December 1, 2009 mandatory disclosure agreement.
In order to compile these enclosures, TVA made a reasonable search of its records. We are attaching an affidavit which attests that all relevant materials identified by this search have been disclosed, and that the disclosures are accurate and complete as of August 15, 2011. Also, we have highlighted the additions to the logs since the last disclosures.
TVA has been conservative in identifying documents for inclusion in Enclosures 2, 3, and 4. By identifying documents on those Enclosures, TVA does not necessarily concede that the documents are in fact relevant or material to the admitted contentions. Also, in order to facilitate your review of these disclosures, we have made a good faith effort to identify the contention number(s) to which each record is responsive. These determinations, however, do not constitute an admission that each and every record is necessarily responsive to that contention(s), and documents may be responsive to additional contentions not identified.
Sincerely, Signed (electronically) by
/s/ Christopher C. Chandler Christopher C. Chandler Office of the General Counsel Tennessee Valley Authority 400 W. Summit Hill Drive, WT 6A-K Knoxville, TN 37902-1401 Phone: (865) 632-7317 Fax: (865) 632-6147 E-mail: ccchandler0@tva.gov Counsel for TVA Attachments cc:    Service List


Mr. David Roth
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD
                                                )
In the Matter of                                )
                                                )  Docket No. 50-391 TENNESSEE VALLEY AUTHORITY                      )
                                                )  August 15, 2011 (Watts Bar Nuclear Plant, Unit 2)              )
                                                )
                                                )
AFFIDAVIT
: 1. My name is William Crouch. My title is Manager, Nuclear Licensing and Industry Affairs, Nuclear Generation Development & Construction, at Unit 2 of the Tennessee Valley Authoritys (TVA) Watts Bar Nuclear Plant. Working with the attorneys for TVA, I have been responsible for managing the searches, collection, and compilation of documents, data compilations, and tangible things to comply with the mandatory disclosure requirements in 10 CFR § 2.336.
: 2. This Affidavit relates to the nineteenth update to disclosures that TVA is providing on August 15, 2011, in the above-captioned proceeding pursuant to 10 CFR § 2.336 and the parties joint agreement on mandatory disclosures, dated December 1, 2009.
: 3. A search was conducted of documents, data compilations, and tangible things under the custody and control of TVA since it filed its eighteenth update to the disclosures for the types of information specified in 10 CFR § 2.336(a). As provided in 10 CFR § 2.336(c),
this search was conducted based on information and documents reasonably available to TVA:
: a.      The searches encompassed both electronic and paper documents.
: b.      The searches encompassed both Watts Bar 2 project-related files and documents in the possession and control of individuals who have worked on the Watts Bar 2 project.
: c.      Searches did not encompass documents in the possession of individuals who did not work on the Watts Bar 2 project or files unrelated to the Watts Bar 2 project.
: 4. Enclosure 2 provides the index of relevant non-privileged, non-protected documents, data compilations, and tangible things that were located as a result of this search.
: 5. Enclosure 3 provides the index of relevant documents, data compilations, and tangible things containing proprietary-related information.
: 6. Enclosure 4 provides the index of relevant documents, data compilations, and tangible things that are publicly available.
: 7. TVA has been conservative in identifying documents for inclusion in Enclosures 2, 3, and 4. By identifying documents on those Enclosures, TVA does not necessarily concede that the documents are in fact relevant or material to the admitted contentions.
: 8. These disclosures are accurate and complete as of August 15, 2011.
The statements made above are true to the best of my knowledge, information, and belief.
I declare under penalty of perjury that the foregoing is true and correct.
Executed in Accord with 10 CFR § 2.304(d)
                                            /s/ William Crouch_________
William Crouch Manager, Nuclear Licensing and Industry Affairs Watts Bar Nuclear Plant, Unit 2 Tennessee Valley Authority Spring City, TN 37381 Phone: 423-365-2004 E-mail: wdcrouch@tva.gov Executed this 15th day of August 2011


Office of the General Counsel
ENCLOSURE 1 TVA WITNESSES The name and, if known, the address and telephone number of any person, including any expert, upon whose opinion the party bases its claims and contentions and may rely upon as a witness:


U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
===Response===
TVA may rely on the following witnesses in support of its position:
Dr. Charles C. Coutant 120 Miramar Circle Oak Ridge, Tennessee 37830 Dennis S. Baxter Tennessee Valley Authority 400 W. Summit Hill Drive, WT 11C-K Knoxville, Tennessee 37904 (865) 632-6404 John T. Baxter Tennessee Valley Authority 400 W. Summit Hill Drive, WT 11B-K Knoxville, Tennessee 37904 (865) 632-3360 Dr. Paul N. Hopping Tennessee Valley Authority 400 W. Summit Hill Drive, WT 10B-K Knoxville, Tennessee 37904 (865) 632-2881 A copy of the analysis or other authority upon which that person bases his or her opinion:


RE: Nineteenth Update to Disclosures Pursuant to 10 CFR § 2.336; Tennessee Valley  Authority (Watts Bar Nuclear Plant, Unit 2), Docket No. 50-391-OL 
===Response===
Currently, TVA bases its position on the following sections of the Watts Bar FSEIS and the references cited therein:
* Contention 7 (Aquatic Impacts) - - FSEIS chs. 2.2, 2.4, 3.1, 3.2, tbls. 1-1, 2-1, and references cited therein.
The Watts Bar Unit 2 FSEIS is publicly available at http://www.nrc.gov/reactors/plant-specific-items/watts-bar/key-correspondence.html.


Pursuant to 10 CFR § 2.336 and the agreement among the parties regarding mandatory discovery disclosures dated December 1, 2009, the Tennessee Valley Authority (TVA) is providing the nineteenth update to its mandatory disclosures with respect to Intervenors' Contention 7, as admitted by the Board on November 19, 2009 (LBP-09-26).  
TVA will update this disclosure when it has identified the persons that it may use as witnesses and the analyses and authorities upon which they base their opinions.


In order to compile the indices in Enclosures 2, 3, and 4, a search was conducted of documents in TVA's possession, custody, or control since the eighteenth update to disclosures dated July 15, 2011. Attached is a supporting affidavit. TVA's nineteenth disclosure update consists of the following:
Page 1 of 11 ENCLOSURE 2 Mandatory Disclosure Log DOC                                  AUTHOR/
DATE      LOCATION*                                TO          SUBJECT/DESCRIPTION            CONTENTION
  #                                  CUSTODIAN Watts Bar Nuclear Plant Supplemental Condenser 1      Jan 2001      TVA            TVA                  N/A            Cooling Water System            7 Fish Monitoring Program Final Report Biological Monitoring of the Tennessee River Near 2     May 2009        TVA            TVA                  N/A                                              7 Watts Bar Nuclear Plant Discharge, 2008 Biological Monitoring of the Tennessee River Near 3     May 2008        TVA            TVA                  N/A                                              7 Watts Bar Nuclear Plant Discharge, 2007 Biological Monitoring of the Tennessee River Near 4     May 2007        TVA            TVA                  N/A                                              7 Watts Bar Nuclear Plant Discharge, 2006 Biological Monitoring of the Tennessee River Near 5      May 2006        TVA            TVA                  N/A                                              7 Watts Bar Nuclear Plant Discharge, 2005 Biological Monitoring of the Tennessee River Near 6      June 2005      TVA            TVA                  N/A                                              7 Watts Bar Nuclear Plant Discharge, 2004 Biological Monitoring of the Tennessee River Near 7      June 2004      TVA            TVA                  N/A                                              7 Watts Bar Nuclear Plant Discharge, 2003 Biological Monitoring of the Tennessee River Near 8      June 2003      TVA            TVA                  N/A                                              7 Watts Bar Nuclear Plant Discharge, 2002 Summary of Preoperational Monitoring of the Mussel Fauna in 9      Sept 1994      TVA             TVA                  N/A              Upper Chickamauga              7 Reservoir in the Vicinity of the Watts Bar Nuclear Plant, 1983-1993 The Effects of Aquatic Macrophytes on Fish 10      Sept 1993      TVA            TVA                  N/A                Populations of              7 Chickamauga Reservoir Coves, 1970-90 Update of the Watts Bar Nuclear Plant Preoperational Monitoring 11      May 1989        TVA            TVA                  N/A                                              7 of the Mussel Fauna in Upper Chickamauga Reservoir Watts Bar Nuclear Plant Preoperational Aquatic 12      Apr 1980      TVA            TVA                  N/A                                              7 Monitoring Report, 1973-1977
* TVA is located at 400 W. Summit Hill Drive, Knoxville, TN 37902.
** This document was originally disclosed in TVAs fifth disclosure update (June 15, 2010) as document number 103. TVA has discovered that the document was inadvertently omitted from subsequent disclosure filings, and is reinserting it as document number 103a.


Enclosure 1 provides the names, addresses, and telephone numbers of the persons upon whose opinion TVA will base its positions on the contention and upon whom TVA may rely as a witness, and a copy of the analyses and authorities upon which they base their opinions. Enclosure 2 provides a descri ption, by category and location, of non-privileged documents, data compilations, and tangible things in the possession, custody, or control of TVA that are relevant to the admitted contentions in this proceeding. If you determine that you would like a copy of any of these documents, please inform me of which documents you would like, and I will provide a copy to you. Enclosure 3 provides an index of documents, data compilations, or tangible things that may be relevant to the contentions but that contain proprietary information, Sensitive Unclassified Non-Safeguards Information (SUNSI), or otherwise protected information. Upon request by the NRC staff, TVA will provide a copy of any such material using the procedure in 10 CFR § 2.390. TVA will provide any requested proprietary documents to the Intervenors after the Board has entered a Protective Order and the Intervenors have signed and returned to TVA the Non-Disclosure Agreement. Enclosure 4 provides an index of relevant documents that are otherwise publicly available.  
Page 2 of 11 DOC                                    AUTHOR/
DATE      LOCATION*                                TO          SUBJECT/DESCRIPTION          CONTENTION
  #                                  CUSTODIAN Watts Bar Nuclear Plant Preoperational Aquatic 13      Mar 1980        TVA                TVA                N/A                                            7 Monitoring Report, 1977-1979 Watts Bar Nuclear Plant Supplemental Condenser 14      Dec 1997        TVA                TVA                N/A                                            7 Cooling Water Project Thermal Plume Modeling Tennessee Technological Watts Bar Tailwater University Center for Fishery Creel Survey, 15      Apr 1997      TVA        the Management,           N/A                                            7 April 1996 through March Utilization and 1997, Interim Report Protection of Water Resources Biological Monitoring of the Tennessee River Near 16      June 2002      TVA               TVA               N/A                                            7 Watts Bar Nuclear Plant Discharge, 2001 Status of the White Crappie Population in 17      Oct 1990      TVA                TVA                N/A                                            7 Chickamauga Reservoir Final Project Report Status of the Channel Catfish Population in 18      Aug 1991        TVA                TVA                N/A            Chickamauga Reservoir          7 First Year Progress Report Recommendation and Implementation of Special Seasonal Flow Releases 19      May 1992        TVA               TVA                N/A                                            7 to Enhance Sauger Spawning in Watts Bar Tailwater Preoperational Assessment of Water Quality and Biological 20      Dec 1986        TVA                TVA                N/A                  Resources of             7 Chickamauga Reservoir, Watts Bar Nuclear Plant, 1973-1985 Preoperational Assessment of Water Quality and Biological 21      Dec 1986        TVA                TVA                N/A                  Resources of             7 Chickamauga Reservoir, Watts Bar Nuclear Plant, 1973-1985, Appendices Population Survey of 22      Aug 1991        TVA                TVA                N/A            Sauger in Chickamauga          7 Reservoir, 1990-1991 Population Survey of Sauger (Stizostedion 23      Aug 1990        TVA                TVA                N/A                  canadense) in            7 Chickamauga Reservoir, 1989 Fish Community Assessment of Selected 24      Apr 1992      TVA                TVA                N/A                                            7 Chickamauga Reservoir Embayments
* TVA is located at 400 W. Summit Hill Drive, Knoxville, TN 37902.
** This document was originally disclosed in TVAs fifth disclosure update (June 15, 2010) as document number 103. TVA has discovered that the document was inadvertently omitted from subsequent disclosure filings, and is reinserting it as document number 103a.


Ms. Diane Curran Mr. David Roth
Page 3 of 11 DOC                                  AUTHOR/
DATE      LOCATION*                                TO          SUBJECT/DESCRIPTION            CONTENTION
  #                                  CUSTODIAN Estimates of Entrainment of Fish Eggs and Larvae By Watts Bar Steam Plant, 1975, and 25      Sept 1976      TVA            TVA                  N/A                                            7 Assessment of the Impact of the Fisheries Resources of Watts Bar Reservoir Environmental Information, Watts Bar 26      Nov 1976        TVA            TVA                  N/A                                            7 Nuclear Plant Units 1 and 2 Chickamauga Reservoir Sauger Investigation, 27        1996          TVA            TVA                  N/A                                            7 1993-1995, Final Project Report Chickamauga White Bass 28      Sept 1994      TVA            TVA                  N/A            Study, 1990-1992, Final          7 Project Report Chickamauga Reservoir 29      Feb 2000        TVA            TVA                  N/A          Fisheries Monitoring, 1999        7 Cove Rotenone Results Chickamauga Reservoir 30      June 2000      TVA            TVA                  N/A          Fisheries Monitoring, 1999        7 Cove Rotenone Results Chickamauga Reservoir 31      May 1996        TVA            TVA                  N/A          1995 Fisheries Monitoring        7 Cove Rotenone Results Chickamauga Reservoir 32      June 1992      TVA            TVA                  N/A          1991 Fisheries Monitoring        7 Cove Rotenone Results Chickamauga Reservoir 33      June 1991      TVA            TVA                  N/A          1990 Fisheries Monitoring        7 Cove Rotenone Results Chickamauga Reservoir 34      June 1990      TVA            TVA.                 N/A          1989 Fisheries Monitoring        7 Cove Rotenone Results Chickamauga Reservoir 35      June 1989      TVA            TVA                  N/A          1988 Fisheries Monitoring        7 Cove Rotenone Results Aquatic Environmental Conditions in the Vicinity 36      June 1997      TVA            TVA                  N/A          of Watts Bar Nuclear Plant        7 During the First Year of Operation, 1996 Aquatic Environmental Conditions in the Vicinity 37      June 1998      TVA            TVA                  N/A          of Watts Bar Nuclear Plant        7 During Two Years of Operation, 1996-1997 Aquatic Ecological Health 38      Aug 1999        TVA            TVA                  N/A            Determinations for TVA          7 Reservoirs - 1998 Aquatic Ecological Health 39      Sept 2001      TVA            TVA                  N/A            Determinations for TVA          7 Reservoirs - 2000 Aquatic Ecological Health 40      Apr 1995      TVA            TVA                  N/A            Determinations for TVA          7 Reservoirs - 1994
* TVA is located at 400 W. Summit Hill Drive, Knoxville, TN 37902.
** This document was originally disclosed in TVAs fifth disclosure update (June 15, 2010) as document number 103. TVA has discovered that the document was inadvertently omitted from subsequent disclosure filings, and is reinserting it as document number 103a.


Page 2 August 15, 2011
Page 4 of 11 DOC                                  AUTHOR/
DATE      LOCATION*                                TO          SUBJECT/DESCRIPTION            CONTENTION
  #                                  CUSTODIAN 1990 Preoperational Monitoring of the Mussel Fauna in Upper 41      Mar 1991        TVA            TVA                  N/A                                            7 Chickamauga Reservoir in the Vicinity of the Watts Bar Nuclear Plant Watts Bar Native Mussel Enhancement Project:
Preliminary Evaluation of an Artificial Boulder Field 42      Feb 2002        TVA            TVA                  N/A              for Enhancing Native          7 Mussel Habitat in the Watts Bar Tailwater, Tennessee River Mile 528.5 Reservoir Monitoring-1991 Summary of Vital Signs 43      July 1992      TVA            TVA                  N/A              and Use Impairment            7 Monitoring on Tennessee Valley Reservoirs Final Environmental Impact Statement: Watts 44      July 1981      TVA            TVA                  N/A            Bar Waste Heat Park,            7 Rhea County, Tennessee, Volume I Final Environmental Impact Statement: Watts 45      July 1981      TVA            TVA                  N/A            Bar Waste Heat Park,            7 Rhea County, Tennessee, Volume II Effects of Watts Bar Nuclear Plant and Watts Bar Steam Plant 46      Feb 1977        TVA            TVA                  N/A                                            7 Discharges on Chickamauga Lake Water Temperatures Results of Hydrothermal Model Tests of the 47      May 1977        TVA            TVA                  N/A                                            7 Multiport Diffuser System Watts Bar Nuclear Plant Discharge Temperature 48      Dec 1993        TVA            TVA                  N/A          Limit Evaluation for Watts        7 Bar Nuclear Plant Tennessee Valley Reservoir and Stream Quality - 1993 49      May 1994        TVA            TVA                  N/A            Summary of Vital Signs          7 and Use Suitability Monitoring Volume I Tennessee Valley Reservoir and Stream Quality - 1993 50      May 1994        TVA            TVA                  N/A            Summary of Vital Signs          7 and Use Suitability Monitoring Volume II Hydrodynamics and Water Temperature Modeling at 51      Nov 1998        TVA            TVA                  N/A                                            7 Watts Bar SCCW Discharge Structure
* TVA is located at 400 W. Summit Hill Drive, Knoxville, TN 37902.
** This document was originally disclosed in TVAs fifth disclosure update (June 15, 2010) as document number 103. TVA has discovered that the document was inadvertently omitted from subsequent disclosure filings, and is reinserting it as document number 103a.


In the event that TVA identifies additional relevant documents or the witnesses for any hearing on the contentions, TVA will update these disclosures periodically on the fifteenth day of each month as required by the December 1, 2009 mandatory disclosure agreement.  
Page 5 of 11 DOC                                    AUTHOR/
DATE      LOCATION*                                TO          SUBJECT/DESCRIPTION          CONTENTION
  #                                  CUSTODIAN Proposed Modifications to Water Temperature 52      Oct 2004      TVA              TVA                  N/A          Effluent Requirements for      7 Watts Bar Nuclear Plant Outfall 113 Threadfin Shad Oak Ridge National 53      May 1980      TVA                                  NRC            Impingement: Effect of        7 Laboratory (ORNL)
Cold Stress GE Water & Process                        Water Analysis Report for 54      11/12/2008      TVA                                  TVA                                            7 Technologies/TVA                                  30 Oct 2008 1997 Verification Studies 55      May 2004      TVA              TVA                 N/A          of Thermal Discharge for       7 Watts Bar Nuclear Plant RFP 103006 Report Rev1 Dynamic Solutions, 56      2/9/2007      TVA                                  N/A          Watts Bar Unit 2 Thermal        7 LLC/TVA Effluent Study Hydrothermal Data for 57      Sept 2001      TVA              TVA                  N/A            Watts Bar Nuclear Plant        7 SCCW Outfall July 1999 Verification Study of Thermal Discharge for Watts Bar 58      Nov 1999      TVA              TVA                 N/A                                          7 Nuclear Plant Supplemental Condenser Cooling Water System Summer 2005 Compliance Survey for 59      Feb 2006      TVA              TVA                  N/A            Watts Bar Nuclear Plant        7 Outfall 113 Passive Mixing Zone Summer 2006 Compliance Survey for 60      Jan 2007      TVA              TVA                  N/A            Watts Bar Nuclear Plant        7 Outfall 113 Passive Mixing Zone Winter 2005 Compliance Survey for Watts Bar 61      Oct 2005      TVA              TVA                  N/A                                          7 Nuclear Plant Outfall 113 Passive Mixing Zone Winter 2006 Compliance Survey for Watts Bar 62      Jan 2007      TVA              TVA                  N/A                                          7 Nuclear Plant Outfall 113 Passive Mixing Zone Aquatic Ecological Health 63      Sept 2000      TVA              TVA                  N/A            Determinations for TVA        7 Reservoirs - 1999 Aquatic Ecological Health Determinations for TVA 64      Sept 2000      TVA              TVA                  N/A                                          7 Reservoirs - 1999 Appendices Aquatic Ecological Health Determinations for TVA 65      April 1998      TVA              TVA                  N/A                                          7 Reservoirs - 1997 Sections 1 through 3 Aquatic Ecological Health Determinations for TVA 66      April 1998      TVA              TVA                  N/A                                          7 Reservoirs - 1997 Sections 4 through 6 Aquatic Ecological Health Determinations for TVA 67      April 1998      TVA              TVA                  N/A                                          7 Reservoirs - 1997 Appendices
* TVA is located at 400 W. Summit Hill Drive, Knoxville, TN 37902.
** This document was originally disclosed in TVAs fifth disclosure update (June 15, 2010) as document number 103. TVA has discovered that the document was inadvertently omitted from subsequent disclosure filings, and is reinserting it as document number 103a.


In order to compile these enclosures, TVA made a reasonable search of its records. We are attaching an affidavit which attests that all relevant materials identified by this search have been disclosed, and that the disclosures are accurate and complete as of August 15, 2011. Also, we have highlighted the additions to the logs since the last disclosures.  
Page 6 of 11 DOC                                    AUTHOR/
DATE      LOCATION*                                  TO        SUBJECT/DESCRIPTION            CONTENTION
  #                                  CUSTODIAN Results of Plankton Studies Conducted in 1986 and 1987 as Part of 68      Jan 1988      TVA            TVA                    N/A            the Operational Aquatic          7 Monitoring Program at Sequoyah Nuclear Plant, Chickamauga Reservoir Reservoir Monitoring 69        1991        TVA            TVA                    N/A                Fiscal Year 1991            7 Workplan Email discussing follow-up 70      11/15/2006      TVA         TVA/R. Horton          J. Chardos                                          7 mussel habitat survey Email addressing status of 71      10/12/2006      TVA        TVA/S. Chance            R. Horton      mussels and potential for          7 follow-up mussel survey Email discussing R. Sherrad, J.
72      6/1/2007      TVA        TVA/D. Wade                                ammonia toxicity and          7 Wright, H, Rucker mussel studies Notes on Permitting Meeting with Tennessee 73      6/1/2007      TVA        TVA/R. Horton              N/A                  Department of              7 Environment and Conservation (TDEC)
Diagram depicting summer and winter mode 74      Jan 2007      TVA        TVA/P. Hopping              N/A                                            7 operating of Watts Bar SCCW Email discussing potential J. Chardos, B.
75      5/25/2007      TVA        TVA/ S. Chance                              endangered species            7 Yeager, R. Horton mitigation measures List of possible 76      May 2007      TVA            TVA                    N/A              endangered species            7 mitigation measures Email discussing compilation of required 77      1/19/2007      TVA        TVA/R. Horton          J. Phillips                                        1 permits list for Watts Bar Unit 2 Email forwarding draft Bellefonte permit table to D. Pittman, J.
78      12/20/2006      TVA        TVA/R. Horton                          serve as a guide for use in        1 Phillips preparing updated Watts Bar application Draft table of permits Enercon/D.
79      Nov 2006      TVA                                    N/A            required for Bellefonte        1 Luchsinger COL application Email discussion concerning inclusion of Watts Bar construction 80      1/23/2007      TVA        TVA/R. Horton          J. Phillips                                        1 permit and operating license in list of required permits Email discussing design 81      5/31/2007      TVA        TVA/P. Hopping          R. Horton      bases for Outfall 101 and          7 113 discharges Watts Bar Nuclear Plant NPDES Water Withdrawal Registration Form for 82      2/13/2008      TVA      TVA/D. Hutchison            TDEC          Calendar Year 2007 and            7 Revised Registration Form for Calendar Year 2006
* TVA is located at 400 W. Summit Hill Drive, Knoxville, TN 37902.
** This document was originally disclosed in TVAs fifth disclosure update (June 15, 2010) as document number 103. TVA has discovered that the document was inadvertently omitted from subsequent disclosure filings, and is reinserting it as document number 103a.


TVA has been conservative in identifying documents for inclusion in Enclosures 2, 3, and 4. By identifying documents on those Enclosures, TVA does not necessarily concede that the documents are in fact relevant or material to the admitted contentions. Also, in order to facilitate your review of these disclosures, we have made a good faith effort to identify the contention number(s) to which each record is responsive. These determinations, however, do not constitute an admission that each and every record is necessarily responsive to that contention(s), and documents may be responsive to additional contentions not identified.  
Page 7 of 11 DOC                                    AUTHOR/
DATE      LOCATION*                                TO          SUBJECT/DESCRIPTION          CONTENTION
  #                                  CUSTODIAN Comparison of Fish Species Occurrence and Trends in Reservoir Fish Assemblage Index 83      Sept 2009      TVA             TVA                  N/A                                          7 Results in Chickamauga Reservoir before and after Watts Bar Nuclear Plant Unit 1 Operation Effects of Thermal Effluent From Sequoyah Nuclear 84      Dec 1995      TVA              TVA                  N/A                                          7 Plant on Fish Populations in Chickamauga Reservoir Figures showing sampling 85      Dec 2009      TVA              TVA                  N/A          locations in Watts Bar and      7 Chickamauga Reservoirs Intake Temperature 86      Nov 2003      TVA              TVA                  N/A            Prediction at Kingston        7 Fossil Power Plant Email summarizing meeting between TVA and TDEC to discuss B. Eiford-Lee, D.
87      4/25/2007      TVA        TVA/R. Horton                                Biocide/Corrosion          7 Pittman, et al.
Treatment Plant modifications and NPDES permit renewal Categorical Exclusion Checklist, Increase in 88      2/20/2004      TVA              TVA                  N/A                                          7 Allowable UHS Temperature to 88°F Chapter 20: Reservoir Fish Assemblage Index Development: A Tool for Assessing Ecological Health in Tennessee T.A. McDonough,                               Valley Authority 89        1999        TVA                                   N/A                                          7 G.D. Hickman                                Impoundments, in Assessing the Sustainability and Biological Integrity of Water Resources Using Fish Communities Watts Bar Nuclear Plant Unit 2 - Additional 90      12/23/2009      TVA              TVA                  NRC            Information Regarding          7 Environmental Review (TAC No. MD8203)
Watts Bar Nuclear Plant Unit 2 - Response to U.S.
Nuclear Regulatory Commission (NRC) 91      4/9/2010      TVA              TVA                  NRC                                          1, 7 Request for Additional Information Regarding Environmental Review (TAC No. MD8203)
Attachment 2 to April 9, 92      4/9/2010      TVA              TVA                  NRC            2010 RAI response: G-5          1 Permit Table Attachment 17 to April 9, 2010 RAI response: TVA 93        1976        TVA              TVA                  N/A                                          7 1976, Impingement at Watts Bar Steam Plant
* TVA is located at 400 W. Summit Hill Drive, Knoxville, TN 37902.
** This document was originally disclosed in TVAs fifth disclosure update (June 15, 2010) as document number 103. TVA has discovered that the document was inadvertently omitted from subsequent disclosure filings, and is reinserting it as document number 103a.


Sincerely,  
Page 8 of 11 DOC                                    AUTHOR/
DATE      LOCATION*                                TO          SUBJECT/DESCRIPTION            CONTENTION
  #                                  CUSTODIAN Sport Fishing Index (SFI):
A method to quantify sport 94        2000        TVA        G.D. Hickman              N/A                fishing quality, in        7 Environmental Science &
Policy 3, S177-S125.
TVA/R.W. Schneider                        Kingston Steam Plant 316 95        1980        TVA                                  N/A                                            7 and J.D. Tuberville                        Permit Renewal Report Fish Impingement at Watts Bar Nuclear Plant Supplemental Condenser 96        2007        TVA              TVA                  N/A                                            7 Cooling Water Intake Structure During 2005 Through 2007 WBN Summary Work Plan 97        2010        TVA              TVA                  N/A            for Preoperational and          7 Operational Monitoring Watts Bar Nuclear Plant Unit 2 - Response to U.S.
Nuclear Regulatory Commission (NRC) 98      5/12/2010      TVA              TVA                  NRC                                            7 Request for Additional Information Regarding Environmental Review (TAC No. MD8203)
Summary of Hydrothermal 99      May 2010        TVA              TVA                  N/A          Sampling for WBN SCCW            7 Field Tests Aquatic Environmental Conditions in the Vicinity of Watts Bar Nuclear Plant 100      6/7/2010      TVA              TVA                  N/A                                            7 During Two Years of Operation, 1996-1997, Revised 6/7/2010 Watts Bar Nuclear Plant Process Sampling for 101    4/26/2010      TVA              TVA                  N/A              NPDES Permit Unit 2            7 Modification Request (Permit No. TN 0020168)
Email summarizing observation of 102    5/24/2010      TVA        TVA/J. Phillips        S. Howard                                          7 hydrothermal sampling at Watts Bar Nuclear Plant Comparison of Fish Species Occurrence and Trends in Reservoir Fish Assemblage Index 103    June 2010      TVA              TVA                  N/A            Results in Chickamauga          7 Reservoir before and after Watts Bar Nuclear Plant Unit 1 Operation Revised June 2010 NPDES Permit No. TN 103a**      6/4/10        TVA            TDEC                  TVA            0020168 for Watts Bar          7 Nuclear Plant (Unit 1)
WBN Unit 2 Condenser 104    2/16/2010      TVA              TVA                TDEC            Cooling Water System            7 Test Flush WBN Unit 2 Flushes and 105    6/14/2010      TVA              TVA                TDEC              Hydrostatic Testing          7 Schedule WBN General Permit for Discharges of Hydrostatic 106      6/29/10        TVA              TVA                TDEC                                            7 Test Water - Notice of Intent
* TVA is located at 400 W. Summit Hill Drive, Knoxville, TN 37902.
** This document was originally disclosed in TVAs fifth disclosure update (June 15, 2010) as document number 103. TVA has discovered that the document was inadvertently omitted from subsequent disclosure filings, and is reinserting it as document number 103a.


Signed (electronically) by /s/ Christopher C. Chandler Christopher C. Chandler Office of the General Counsel Tennessee Valley Authority 400 W. Summit Hill Drive, WT 6A-K Knoxville, TN 37902-1401
Page 9 of 11 DOC                                  AUTHOR/
DATE      LOCATION*                                TO          SUBJECT/DESCRIPTION          CONTENTION
  #                                  CUSTODIAN Summary of Hydrothermal August 107                    TVA            TVA                  N/A          Sampling for WBN SCCW            7 2010 Field Tests Tennessee Valley Authority (TVA) - Watts Bar Nuclear Plant (WBN) -
NPDES Permit No.
108    8/17/2010      TVA            TVA                  TDEC                                            7 TN0020168 - Permit Modification Request -
Addition of Unit 2 Operation Email notifying TDEC of collection of pink mucket 109    9/30/2010      TVA        TVA/J. Baxter            TDEC                                            7 and sheepnose in Watts Bar tailwater Winter 2010 Compliance August                                                              Survey for Watts Bar 110                    TVA            TVA                  N/A                                            7 2010                                                            Nuclear Plant Outfall 113 Passive Mixing Zone Mollusk and Habitat Survey of Four Sites in the Tennessee River Near 111    9/14/2010      TVA            TVA                  N/A                                            7 TVAs Watts Bar Nuclear Plant (Rhea and Meigs Counties, TN)
TVA New Generation Development and Construction Newsletter -
112    7/21/2010      TVA            TVA                  N/A                                            7 Excerpts from January and July 2010 Describing Aquatic Reports Analysis of Fish Species Occurrences in October                                                            Chickamauga Reservoir -
113                    TVA            TVA                  N/A                                            7 2010                                                                  A Comparison of Historical and Recent Data Mollusk Survey of the Tennessee River Near 114    11/24/2010      TVA            TVA                  N/A            Watts Bar Nuclear Plant        7 (Rhea County, Tennessee)
NPG Calculation Number 115    12/10/2010      TVA            TVA                  N/A          EPMRCP052992, Sizing            7 of Traveling Water Screen Tennessee Valley Authority (TVA) - Watts Bar Nuclear Plant (WBN) -
116      1/6/2011      TVA        TVA/L. Johnson            TDEC              NPDES Permit No.            7 TN0020168 - Permit Modification Request -
Antidegradation Review Hydrothermal Effects on the Ichthyoplankton from the Watts Bar Nuclear February 117                    TVA            TVA                  N/A              Plant Supplemental          7 2011 Condenser Cooling Water Outfall in Upper Chickamauga Reservoir
* TVA is located at 400 W. Summit Hill Drive, Knoxville, TN 37902.
** This document was originally disclosed in TVAs fifth disclosure update (June 15, 2010) as document number 103. TVA has discovered that the document was inadvertently omitted from subsequent disclosure filings, and is reinserting it as document number 103a.


Phone: (865) 632-7317
Page 10 of 11 DOC                                    AUTHOR/
DATE      LOCATION*                                TO          SUBJECT/DESCRIPTION            CONTENTION
  #                                  CUSTODIAN Hydrothermal Effects on the Ichthyoplankton from the Watts Bar Nuclear February                                                                Plant Supplemental 118                    TVA              TVA                  N/A                                              7 2011                                                              Condenser Cooling Water Outfall in Upper Chickamauga Reservoir -
Appendix A Discussion of the results of the 2010 Mollusk March                                                            Survey of the Tennessee 119                    TVA              TVA                  N/A                                              7 2011                                                                  River Near Watts Bar Nuclear Plant (Rhea County, Tennessee)
Comparison of 2010 Peak Spawning Seasonal Densities of Ichthyoplankton at Watts 120    April 2011      TVA              TVA                  N/A                    Bar Nuclear              7 Plant at Tennessee River Mile 528 with Historical Densities during 1996 and 1997 Fish Impingement at Watts Bar Nuclear Plant March                                                              Intake Pumping Station 121                    TVA              TVA                  N/A                                              7 2011                                                                  Cooling Water Intake Structure during March 2010 through March 2011 Revised Figures for Discussion of the results of the 2010 Mollusk March 122                    TVA              TVA                  N/A          Survey of the Tennessee            7 2011 River Near Watts Bar Nuclear Plant (Rhea County, Tennessee)
Summer 2010 Compliance Survey for February 123                    TVA              TVA                  N/A            Watts Bar Nuclear Plant          7 2011 Outfall 113 Passive Mixing Zone Biological Monitoring of the Tennessee River Near 124    May 2010        TVA              TVA                  N/A                                              7 Watts Bar Nuclear Plant Discharge, Autumn 2009 Assessing the Reservoir Fish Assemblage Index: A potential measure of reservoir quality, in Reservoir symposium-G.D. Hickman, 125      1996          TVA                                  N/A                  Multidimensional            7 T.A. McDonough approaches to reservoir fisheries management American Fisheries Society Symposium 16:85-97 Tennessee Valley Reservoir and Stream 126    April 1994      TVA              TVA                  N/A          Quality - 1993 - Summary          7 of Reservoir Fish Assemblage Results
* TVA is located at 400 W. Summit Hill Drive, Knoxville, TN 37902.
** This document was originally disclosed in TVAs fifth disclosure update (June 15, 2010) as document number 103. TVA has discovered that the document was inadvertently omitted from subsequent disclosure filings, and is reinserting it as document number 103a.


Fax: (865) 632-6147 E-mail: ccchandler0@tva.gov Counsel for TVA Attachments cc: Service List UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD
Page 11 of 11 DOC                                    AUTHOR/
           )
DATE      LOCATION*                                TO           SUBJECT/DESCRIPTION          CONTENTION
In the Matter of      )
  #                                  CUSTODIAN Aquatic Ecological Health August 127                    TVA              TVA                N/A            Determinations for TVA          7 1996 Reservoirs - 1995 Aquatic Ecological Health August 128                    TVA              TVA                N/A            Determinations for TVA          7 1997 Reservoirs - 1996 Fish Impingement at Watts Bar Nuclear Plant Intake Pumping Station 129    April 2011      TVA              TVA                N/A              Cooling Water Intake          7 Structure during March 2010 through March 2011, Revised April 2011 NPG Calculation Number EPMRCP052992, Sizing 130    4/11/2011      TVA              TVA                N/A                                            7 of Traveling Water Screen, Revision 2 TVA; Tennessee Wildlife Resources Agency; U.S. Dept                            Memorandum of of the Interior; U.S.                       Understanding for a 131      5/16/11        TVA                                  N/A                                            7 Army Corps of                            Cooperative Mollusk Engineers; TDEC;                            Management Strategy The Nature Conservency Biological Monitoring of the Tennessee River Near 132    June 2011      TVA              TVA                 N/A                                            7 Watts Bar Nuclear Plant Discharge, Autumn 2010 NPDES Permit No. TN 133    July 2011      TVA              TDEC                TVA             0020168 for Watts Bar          7 Nuclear Plant
      ) Docket No. 50-391 TENNESSEE VALLEY AUTHORITY  )
* TVA is located at 400 W. Summit Hill Drive, Knoxville, TN 37902.
      ) August 15, 2011 (Watts Bar Nuclear Plant, Unit 2)    )
** This document was originally disclosed in TVAs fifth disclosure update (June 15, 2010) as document number 103. TVA has discovered that the document was inadvertently omitted from subsequent disclosure filings, and is reinserting it as document number 103a.
      )
      )
AFFIDAVIT  1. My name is William Crouch. My title is Manager, Nuclear Licensing and Industry Affairs, Nuclear Generation Development & Construction, at Unit 2 of the Tennessee Valley Authority's (TVA) Watts Bar Nuclear Plant. Working with the attorneys for TVA, I have been responsible for managing the searches, collection, and compilation of documents, data compilations, and tangible things to comply with the mandatory disclosure requirements in 10 CFR § 2.336.
: 2. This Affidavit relates to the nineteenth update to disclosures that TVA is providing on August 15, 2011, in the above-captioned proceeding pursuant to 10 CFR § 2.336 and the parties' joint agreement on mandatory disclosures, dated December 1, 2009.  
: 3. A search was conducted of documents, data compilations, and tangible things under the custody and control of TVA since it filed its eighteenth update to the disclosures for the types of information specified in 10 CFR § 2.336(a). As provided in 10 CFR § 2.336(c), this search was conducted based on information and documents reasonably available to TVA: 
: a. The searches encompassed both electronic and paper documents. 
: b. The searches encompassed both Watts Bar 2 project-related files and documents in the possession and control of individuals who have worked on the Watts Bar 2


project. c. Searches did not encompass documents in the possession of individuals who did not work on the Watts Bar 2 project or files unrelated to the Wa tts Bar 2 project.
Page 1 of 1 ENCLOSURE 3 Proprietary Log BASIS FOR AUTHOR/                        SUBJECT/
: 4. Enclosure 2 provides the index of relevant non-privileged, non-protected documents, data compilations, and tangible things that were located as a result of this search.
DOC #  DATE    LOCATION*                            TO                          CONTENTION  PROPRIETARY CUSTODIAN                      DESCRIPTION STATUS The Role of Electric Power                  Temperature and EPRI Proprietary -
: 5. Enclosure 3 provides the index of relevant documents, data compilations, and tangible things containing proprietary-related information. 
1   Mar 2008      TVA     Research Institute,   N/A    Nutritional Status in     7 Impingement Study ORNL                        Impingement of Clupeid Fish Species An Assessment of Kenneth P. Cannon, the Archaeological University of                                                 16 USC § 470hh; 2  Oct 1986      TVA                            N/A      Resources of the       7 Tennessee-                                                    18 CFR § 1312.18 Watts Bar Reservoir, Knoxville/TVA East Tennessee
: 6. Enclosure 4 provides the index of relevant documents, data compilations, and tangible things that are publicly available.    
* TVA is located at 400 W. Summit Hill Drive, Knoxville, TN 37902.
: 7. TVA has been conservative in identifying documents for inclusion in Enclosures 2, 3, and 4. By identifying documents on those En closures, TVA does not necessarily concede that the documents are in fact relevant or material to the admitted contentions. 
: 8. These disclosures are accurate and complete as of August 15, 2011. The statements made above are true to the best of my knowledge, information, and belief. I declare under penalty of perjury that the foregoi ng is true and correct. Executed in Accord with 10 CFR § 2.304(d) 
      /s/ William Crouch
_________      William Crouch  Manager, Nuclear Licensing and Industry Affairs Watts Bar Nuclear Plant, Unit 2      Tennessee Valley Authority Spring City, TN 37381      Phone: 423-365-2004 E-mail: wdcrouch@tva.gov
 
Executed this 15th day of August 2011 ENCLOSURE 1 TVA WITNESSES The name and, if known, the address and telephone num ber of any person, including any expert, upon whose opinion the party bases its claims and contentions and may rely upon as a witness:
Response:
TVA may rely on the following witnesses in support of its position:
 
Dr. Charles C. Coutant 120 Miramar Circle Oak Ridge, Tennessee 37830 
 
Dennis S. Baxter Tennessee Valley Authority 400 W. Summit Hill Drive, WT 11C-K Knoxville, Tennessee 37904


(865) 632-6404
Page 1 of 1 ENCLOSURE 4 Publicly Available Log DOC                                              AUTHOR/                SUBJECT/
DATE              LOCATION                                TO                      CONTENTION
#                                            CUSTODIAN              DESCRIPTION Available at                                    Environmental http://www.tva.gov/environme                            Statement, Watts 1  Nov 1972                                      TVA          N/A                        1, 7 nt/reports/wattsbar2/related/n                          Bar Nuclear Plant ov_1972.pdf                                      Units 1 and 2 Environmental Available at Impact Statement http://www.tva.gov/environme 2  Aug 1993                                      TVA          N/A    (EIS) Review        7 nt/reports/wattsbar2/related/a Watts Bar Nuclear ug_1993.pdf Plant Energy Vision 2020 Available at Integrated http://www.tva.gov/environme 3  Feb 1995                                      TVA          N/A      Resource          7 nt/reports/energyvision2020/i Plan/Environmental ndex.htm Impact Statement Available at FSEIS Appendix D:
http://www.tva.gov/environme 4  June 2007                                      TVA          N/A    Response to        7 nt/reports/wattsbar2/appendix Comments
_d.pdf Final Environmental Available at                                    Assessment http://www.tva.gov/environme                              Related to the 5  Aug 1998  nt/reports/wattsbar2/related/a      TVA          N/A  Watts Bar Nuclear      7 ug_1998.pdf                                  Plant Supplemental Condenser Cooling Water Project Reservoir Available at                                  Operations Study 6  May 2004  http://www.tva.gov/environme        TVA          N/A Final Programmatic      7 nt/reports/ros_eis/index.htm                            Environmental Impact Statement


John T. Baxter Tennessee Valley Authority 400 W. Summit Hill Drive, WT 11B-K Knoxville, Tennessee 37904
(865) 632-3360 Dr. Paul N. Hopping Tennessee Valley Authority 400 W. Summit Hill Drive, WT 10B-K Knoxville, Tennessee 37904
(865) 632-2881
A copy of the analysis or other authority upon which that person bases his or her opinion:
Response:
Currently, TVA bases its position on the following sections of the Watts Bar FSEIS and the references cited therein:
Contention 7 (Aquatic Impacts) - - FSE IS chs. 2.2, 2.4, 3.1, 3.2, tbls. 1-1, 2-1, and references cited therein.
The Watts Bar Unit 2 FSEIS is publicly ava ilable at http://www.nrc.gov/reactors/plant-specific-items/watts-bar/key-correspondence.html.
TVA will update this disclosure when it has identified the persons that it may use as witnesses and the analyses and authorit ies upon which they base their opinions.
Page 1 of 11
* TVA is located at 400 W. Summit Hill Drive, Knoxville, TN 37902.
  ** This document was originally disclosed in TVA's fifth disclosure update (June 15, 2010) as document number 103. TVA has discovered that the document was inadvertently omitted from subsequent disclosure filings, and is reinserting it as document number 103a.
ENCLOSURE 2 Mandatory Disclosure Log DOC # DATE LOCATION* AUTHOR/ CUSTODIAN TO SUBJECT/DESCRIPTION CONTENTION 1 Jan 2001 TVA TVA N/A Watts Bar Nuclear Plant Supplemental Condenser Cooling Water System Fish Monitoring Program Final Report 7 2 May 2009 TVA TVA N/A Biological Monitoring of the Tennessee River Near Watts Bar Nuclear Plant Discharge, 2008 7 3 May 2008 TVA  TVA N/A Biological Monitoring of the Tennessee River Near Watts Bar Nuclear Plant Discharge, 2007 7 4 May 2007 TVA TVA N/A Biological Monitoring of the Tennessee River Near Watts Bar Nuclear Plant Discharge, 2006 7 5 May 2006 TVA TVA N/A Biological Monitoring of the Tennessee River Near Watts Bar Nuclear Plant Discharge, 2005 7 6 June 2005 TVA TVA N/A Biological Monitoring of the Tennessee River Near Watts Bar Nuclear Plant Discharge, 2004 7 7 June 2004 TVA TVA N/A Biological Monitoring of the Tennessee River Near Watts Bar Nuclear Plant Discharge, 2003 7 8 June 2003 TVA TVA N/A Biological Monitoring of the Tennessee River Near Watts Bar Nuclear Plant Discharge, 2002 7 9 Sept 1994 TVA TVA N/A Summary of Preoperational Monitoring of the Mussel Fauna in Upper Chickamauga Reservoir in the Vicinity of the Watts Bar Nuclear Plant, 1983-1993 7 10 Sept 1993 TVA TVA N/A The Effects of Aquatic Macrophytes on Fish Populations of Chickamauga Reservoir Coves, 1970-90 7 11 May 1989 TVA TVA N/A Update of the Watts Bar Nuclear Plant Preoperational Monitoring of the Mussel Fauna in Upper Chickamauga Reservoir 7 12 Apr 1980 TVA TVA N/A Watts Bar Nuclear Plant Preoperational Aquatic Monitoring Report, 1973-1977 7 Page 2 of 11
* TVA is located at 400 W. Summit Hill Drive, Knoxville, TN 37902.
  ** This document was originally disclosed in TVA's fifth disclosure update (June 15, 2010) as document number 103. TVA has discovered that the document was inadvertently omitted from subsequent disclosure filings, and is reinserting it as document number 103a.
DOC # DATE LOCATION* AUTHOR/ CUSTODIAN TO SUBJECT/DESCRIPTION CONTENTION 13 Mar 1980 TVA TVA N/A Watts Bar Nuclear Plant Preoperational Aquatic Monitoring Report, 1977-1979 7 14 Dec 1997 TVA TVA N/A Watts Bar Nuclear Plant Supplemental Condenser Cooling Water Project Thermal Plume Modeling 7 15 Apr 1997 TVA Tennessee Technological University Center for the Management, Utilization and Protection of Water Resources N/A Watts Bar Tailwater Fishery Creel Survey, April 1996 through March 1997, Interim Report 7 16 June 2002 TVA TVA N/A Biological Monitoring of the Tennessee River Near Watts Bar Nuclear Plant Discharge, 2001 7 17 Oct 1990 TVA TVA N/A Status of the White Crappie Population in Chickamauga Reservoir Final Project Report 7 18 Aug 1991 TVA TVA N/A Status of the Channel Catfish Population in Chickamauga Reservoir First Year Progress Report 7 19 May 1992 TVA TVA N/A Recommendation and Implementation of Special Seasonal Flow Releases to Enhance Sauger Spawning in Watts Bar Tailwater 7 20 Dec 1986 TVA TVA N/A Preoperational Assessment of Water Quality and Biological Resources of Chickamauga Reservoir, Watts Bar Nuclear Plant, 1973-1985 7 21 Dec 1986 TVA TVA N/A Preoperational Assessment of Water Quality and Biological Resources of Chickamauga Reservoir, Watts Bar Nuclear Plant, 1973-1985, Appendices 7 22 Aug 1991 TVA TVA N/A Population Survey of Sauger in Chickamauga Reservoir, 1990-1991 7 23 Aug 1990 TVA TVA N/A Population Survey of Sauger (Stizostedion canadense) in Chickamauga Reservoir, 1989 7 24 Apr 1992 TVA TVA N/A Fish Community Assessment of Selected Chickamauga Reservoir Embayments 7
Page 3 of 11
* TVA is located at 400 W. Summit Hill Drive, Knoxville, TN 37902.
  ** This document was originally disclosed in TVA's fifth disclosure update (June 15, 2010) as document number 103. TVA has discovered that the document was inadvertently omitted from subsequent disclosure filings, and is reinserting it as document number 103a.
DOC # DATE LOCATION* AUTHOR/ CUSTODIAN TO SUBJECT/DESCRIPTION CONTENTION 25 Sept 1976 TVA TVA N/A Estimates of Entrainment of Fish Eggs and Larvae By Watts Bar Steam Plant, 1975, and Assessment of the Impact of the Fisheries Resources of Watts Bar Reservoir 7 26 Nov 1976 TVA TVA N/A Environmental Information, Watts Bar Nuclear Plant  Units 1 and 2 7 27 1996 TVA TVA N/A Chickamauga Reservoir Sauger Investigation, 1993-1995, Final Project Report 7 28 Sept 1994 TVA TVA N/A Chickamauga White Bass Study, 1990-1992, Final Project Report 7 29 Feb 2000 TVA TVA N/A Chickamauga Reservoir Fisheries Monitoring, 1999 Cove Rotenone Results 7 30 June 2000 TVA TVA N/A Chickamauga Reservoir Fisheries Monitoring, 1999 Cove Rotenone Results 7 31 May 1996 TVA TVA N/A Chickamauga Reservoir 1995 Fisheries Monitoring Cove Rotenone Results 7 32 June 1992 TVA TVA N/A Chickamauga Reservoir 1991 Fisheries Monitoring Cove Rotenone Results 7 33 June 1991 TVA TVA N/A Chickamauga Reservoir 1990 Fisheries Monitoring Cove Rotenone Results 7 34 June 1990 TVA TVA. N/A Chickamauga Reservoir 1989 Fisheries Monitoring Cove Rotenone Results 7 35 June 1989 TVA TVA N/A Chickamauga Reservoir 1988 Fisheries Monitoring Cove Rotenone Results 7 36 June 1997 TVA TVA N/A Aquatic Environmental Conditions in the Vicinity of Watts Bar Nuclear Plant During the First Year of Operation, 1996 7 37 June 1998 TVA TVA N/A Aquatic Environmental Conditions in the Vicinity of Watts Bar Nuclear Plant During Two Years of Operation, 1996-1997 7 38 Aug 1999 TVA TVA N/A Aquatic Ecological Health Determinations for TVA Reservoirs - 1998 7 39 Sept 2001 TVA TVA N/A Aquatic Ecological Health Determinations for TVA Reservoirs - 2000 7 40 Apr 1995 TVA TVA N/A Aquatic Ecological Health Determinations for TVA Reservoirs - 1994 7
Page 4 of 11
* TVA is located at 400 W. Summit Hill Drive, Knoxville, TN 37902.
  ** This document was originally disclosed in TVA's fifth disclosure update (June 15, 2010) as document number 103. TVA has discovered that the document was inadvertently omitted from subsequent disclosure filings, and is reinserting it as document number 103a.
DOC # DATE LOCATION* AUTHOR/ CUSTODIAN TO SUBJECT/DESCRIPTION CONTENTION 41 Mar 1991 TVA TVA N/A 1990 Preoperational Monitoring of the Mussel Fauna in Upper Chickamauga Reservoir in the Vicinity of the Watts Bar Nuclear Plant 7 42 Feb 2002 TVA TVA N/A Watts Bar Native Mussel Enhancement Project: Preliminary Evaluation of an Artificial Boulder Field for Enhancing Native Mussel Habitat in the Watts Bar Tailwater, Tennessee River Mile 528.5 7 43 July 1992 TVA TVA N/A Reservoir Monitoring-1991 Summary of Vital Signs and Use Impairment Monitoring on Tennessee Valley Reservoirs 7 44 July 1981 TVA TVA N/A Final Environmental Impact Statement: Watts Bar Waste Heat Park, Rhea County, Tennessee, Volume I 7 45 July 1981 TVA TVA N/A Final Environmental Impact Statement: Watts Bar Waste Heat Park, Rhea County, Tennessee, Volume II 7 46 Feb 1977 TVA TVA N/A Effects of Watts Bar Nuclear Plant and Watts Bar Steam Plant Discharges on Chickamauga Lake Water Temperatures 7 47 May 1977 TVA TVA N/A Results of Hydrothermal Model Tests of the Multiport Diffuser System Watts Bar Nuclear Plant 7 48 Dec 1993 TVA TVA N/A Discharge Temperature Limit Evaluation for Watts Bar Nuclear Plant 7 49 May 1994 TVA TVA N/A Tennessee Valley Reservoir and Stream Quality - 1993 Summary of Vital Signs and Use Suitability Monitoring Volume I 7 50 May 1994 TVA TVA N/A Tennessee Valley Reservoir and Stream Quality - 1993 Summary of Vital Signs and Use Suitability Monitoring Volume II 7 51 Nov 1998 TVA TVA N/A Hydrodynamics and Water Temperature Modeling at Watts Bar SCCW Discharge Structure 7
Page 5 of 11
* TVA is located at 400 W. Summit Hill Drive, Knoxville, TN 37902.
  ** This document was originally disclosed in TVA's fifth disclosure update (June 15, 2010) as document number 103. TVA has discovered that the document was inadvertently omitted from subsequent disclosure filings, and is reinserting it as document number 103a.
DOC # DATE LOCATION* AUTHOR/ CUSTODIAN TO SUBJECT/DESCRIPTION CONTENTION 52 Oct 2004 TVA TVA N/A Proposed Modifications to Water Temperature Effluent Requirements for Watts Bar Nuclear Plant Outfall 113 7 53 May 1980 TVA Oak Ridge National Laboratory (ORNL) NRC Threadfin Shad Impingement: Effect of Cold Stress 7 54 11/12/2008 TVA GE Water & Process Technologies/TVA TVA Water Analysis Report for 30 Oct 2008 7 55 May 2004 TVA TVA N/A 1997 Verification Studies of Thermal Discharge for Watts Bar Nuclear Plant 7 56 2/9/2007 TVA Dynamic Solutions, LLC/TVA N/A RFP 103006 Report Rev1 Watts Bar Unit 2 Thermal Effluent Study 7 57 Sept 2001 TVA TVA N/A Hydrothermal Data for Watts Bar Nuclear Plant SCCW Outfall 7 58 Nov 1999 TVA TVA N/A July 1999 Verification Study of Thermal Discharge for Watts Bar Nuclear Plant Supplemental Condenser Cooling Water System 7 59 Feb 2006 TVA TVA N/A Summer 2005 Compliance Survey for Watts Bar Nuclear Plant Outfall 113 Passive Mixing Zone 7 60 Jan 2007 TVA TVA N/A Summer 2006 Compliance Survey for Watts Bar Nuclear Plant Outfall 113 Passive Mixing Zone 7 61 Oct 2005 TVA TVA N/A Winter 2005 Compliance Survey for Watts Bar Nuclear Plant Outfall 113 Passive Mixing Zone 7 62 Jan 2007 TVA TVA N/A Winter 2006 Compliance Survey for Watts Bar Nuclear Plant Outfall 113 Passive Mixing Zone 7 63 Sept 2000 TVA  TVA N/A Aquatic Ecological Health Determinations for TVA Reservoirs - 1999 7 64 Sept 2000 TVA TVA N/A Aquatic Ecological Health Determinations for TVA Reservoirs - 1999 Appendices 7 65 April 1998 TVA TVA N/A Aquatic Ecological Health Determinations for TVA Reservoirs - 1997 Sections 1 through 3 7 66 April 1998 TVA TVA N/A Aquatic Ecological Health Determinations for TVA Reservoirs - 1997 Sections 4 through 6 7 67 April 1998 TVA TVA N/A Aquatic Ecological Health Determinations for TVA Reservoirs - 1997 Appendices 7
Page 6 of 11
* TVA is located at 400 W. Summit Hill Drive, Knoxville, TN 37902.
  ** This document was originally disclosed in TVA's fifth disclosure update (June 15, 2010) as document number 103. TVA has discovered that the document was inadvertently omitted from subsequent disclosure filings, and is reinserting it as document number 103a.
DOC # DATE LOCATION* AUTHOR/ CUSTODIAN TO SUBJECT/DESCRIPTION CONTENTION 68 Jan 1988 TVA TVA N/A Results of Plankton Studies Conducted in 1986 and 1987 as Part of the Operational Aquatic Monitoring Program at Sequoyah Nuclear Plant, Chickamauga Reservoir 7 69 1991 TVA TVA N/A Reservoir Monitoring Fiscal Year 1991 Workplan 7 70 11/15/2006 TVA TVA/R. Horton J. Chardos Email discussing follow-up mussel habitat survey 7 71 10/12/2006 TVA TVA/S. Chance R. Horton Email addressing status of mussels and potential for follow-up mussel survey 7 72 6/1/2007 TVA TVA/D. Wade R. Sherrad, J. Wright, H, Rucker Email discussing ammonia toxicity and mussel studies 7 73 6/1/2007 TVA TVA/R. Horton N/A Notes on Permitting Meeting with Tennessee Department of Environment and Conservation (TDEC) 7 74 Jan 2007 TVA TVA/P. Hopping N/A Diagram depicting summer and winter mode operating of Watts Bar SCCW 7 75 5/25/2007 TVA TVA/ S. Chance J. Chardos, B. Yeager, R. Horton Email discussing potential endangered species mitigation measures 7 76 May 2007 TVA TVA N/A List of possible endangered species mitigation measures 7 77 1/19/2007 TVA TVA/R. Horton J. Phillips Email discussing compilation of required permits list for Watts Bar Unit 2 1 78 12/20/2006 TVA TVA/R. Horton D. Pittman, J. Phillips Email forwarding draft Bellefonte permit table to serve as a guide for use in preparing updated Watts Bar application 1 79 Nov 2006 TVA Enercon/D.
Luchsinger N/A Draft table of permits required for Bellefonte COL application 1 80 1/23/2007 TVA TVA/R. Horton J. Phillips Email discussion concerning inclusion of Watts Bar construction permit and operating license in list of required permits 1 81 5/31/2007 TVA TVA/P. Hopping R. Horton Email discussing design bases for Outfall 101 and 113 discharges 7 82 2/13/2008 TVA TVA/D. Hutchison TDEC Watts Bar Nuclear Plant NPDES Water Withdrawal Registration Form for Calendar Year 2007 and Revised Registration Form for Calendar Year 2006 7 Page 7 of 11
* TVA is located at 400 W. Summit Hill Drive, Knoxville, TN 37902.
  ** This document was originally disclosed in TVA's fifth disclosure update (June 15, 2010) as document number 103. TVA has discovered that the document was inadvertently omitted from subsequent disclosure filings, and is reinserting it as document number 103a.
DOC # DATE LOCATION* AUTHOR/ CUSTODIAN TO SUBJECT/DESCRIPTION CONTENTION 83 Sept 2009 TVA TVA N/A Comparison of Fish Species Occurrence and Trends in Reservoir Fish Assemblage Index Results in Chickamauga Reservoir before and after Watts Bar Nuclear Plant Unit 1 Operation 7 84 Dec 1995 TVA TVA N/A Effects of Thermal Effluent From Sequoyah Nuclear Plant on Fish Populations in Chickamauga Reservoir 7 85 Dec 2009 TVA TVA N/A Figures showing sampling locations in Watts Bar and Chickamauga Reservoirs 7 86 Nov 2003 TVA TVA N/A Intake Temperature Prediction at Kingston Fossil Power Plant 7 87 4/25/2007 TVA TVA/R. Horton B. Eiford-Lee, D.
Pittman, et al. Email summarizing meeting between TVA and TDEC to discuss Biocide/Corrosion Treatment Plant modifications and NPDES permit renewal 7 88 2/20/2004 TVA TVA N/A Categorical Exclusion Checklist, Increase in Allowable UHS Temperature to 88°F 7 89 1999 TVA T.A. McDonough, G.D. Hickman N/A Chapter 20: Reservoir Fish Assemblage Index Development: A Tool for Assessing Ecological Health in Tennessee Valley Authority Impoundments, in Assessing the Sustainability and Biological Integrity of Water Resources Using Fish Communities 7 90 12/23/2009 TVA TVA NRC Watts Bar Nuclear Plant Unit 2 - Additional Information Regarding Environmental Review (TAC No. MD8203) 7 91 4/9/2010 TVA TVA NRC Watts Bar Nuclear Plant Unit 2 - Response to U.S. Nuclear Regulatory Commission (NRC) Request for Additional Information Regarding Environmental Review (TAC No. MD8203) 1, 7 92 4/9/2010 TVA TVA NRC Attachment 2 to April 9, 2010 RAI response: G-5 Permit Table 1 93 1976 TVA TVA N/A Attachment 17 to April 9, 2010 RAI response: TVA 1976, Impingement at Watts Bar Steam Plant 7
Page 8 of 11
* TVA is located at 400 W. Summit Hill Drive, Knoxville, TN 37902.
  ** This document was originally disclosed in TVA's fifth disclosure update (June 15, 2010) as document number 103. TVA has discovered that the document was inadvertently omitted from subsequent disclosure filings, and is reinserting it as document number 103a.
DOC # DATE LOCATION* AUTHOR/ CUSTODIAN TO SUBJECT/DESCRIPTION CONTENTION 94 2000 TVA G.D. Hickman N/A Sport Fishing Index (SFI): A method to quantify sport fishing quality , in Environmental Science & Policy 3, S177-S125.
7 95 1980 TVA TVA/R.W. Schneider and J.D. Tuberville N/A Kingston Steam Plant 316 Permit Renewal Report 7 96 2007 TVA TVA N/A Fish Impingement at Watts Bar Nuclear Plant Supplemental Condenser Cooling Water Intake Structure During 2005 Through 2007 7 97 2010 TVA TVA N/A WBN Summary Work Plan for Preoperational and Operational Monitoring 7 98 5/12/2010 TVA TVA NRC Watts Bar Nuclear Plant Unit 2 - Response to U.S. Nuclear Regulatory Commission (NRC) Request for Additional Information Regarding Environmental Review (TAC No. MD8203) 7 99 May 2010 TVA TVA N/A Summary of Hydrothermal Sampling for WBN SCCW Field Tests 7 100 6/7/2010 TVA TVA N/A Aquatic Environmental Conditions in the Vicinity of Watts Bar Nuclear Plant During Two Years of Operation, 1996-1997, Revised 6/7/2010 7 101 4/26/2010 TVA TVA N/A Watts Bar Nuclear Plant Process Sampling for NPDES Permit Unit 2 Modification Request (Permit No. TN 0020168) 7 102 5/24/2010 TVA TVA/J. Phillips S. Howard Email summarizing observation of hydrothermal sampling at Watts Bar Nuclear Plant 7 103 June 2010 TVA TVA N/A Comparison of Fish Species Occurrence and Trends in Reservoir Fish Assemblage Index Results in Chickamauga Reservoir before and after Watts Bar Nuclear Plant Unit 1 Operation Revised June 2010 7 103a** 6/4/10 TVA TDEC TVA NPDES Permit No. TN 0020168 for Watts Bar Nuclear Plant (Unit 1) 7 104 2/16/2010 TVA TVA TDEC WBN Unit 2 Condenser Cooling Water System Test Flush 7 105 6/14/2010 TVA TVA TDEC WBN Unit 2 Flushes and Hydrostatic Testing Schedule 7 106 6/29/10 TVA TVA TDEC WBN General Permit for Discharges of Hydrostatic Test Water - Notice of Intent 7 Page 9 of 11
* TVA is located at 400 W. Summit Hill Drive, Knoxville, TN 37902.
  ** This document was originally disclosed in TVA's fifth disclosure update (June 15, 2010) as document number 103. TVA has discovered that the document was inadvertently omitted from subsequent disclosure filings, and is reinserting it as document number 103a.
DOC # DATE LOCATION* AUTHOR/ CUSTODIAN TO SUBJECT/DESCRIPTION CONTENTION 107 August 2010 TVA TVA N/A Summary of Hydrothermal Sampling for WBN SCCW Field Tests 7 108 8/17/2010 TVA TVA TDEC Tennessee Valley Authority (TVA) - Watts Bar Nuclear Plant (WBN) -
NPDES Permit No. TN0020168 - Permit Modification Request -
Addition of Unit 2 Operation 7 109 9/30/2010 TVA TVA/J. Baxter TDEC Email notifying TDEC of collection of pink mucket and sheepnose in Watts Bar tailwater 7 110 August 2010 TVA TVA N/A Winter 2010 Compliance Survey for Watts Bar Nuclear Plant Outfall 113 Passive Mixing Zone 7 111 9/14/2010 TVA TVA N/A Mollusk and Habitat Survey of Four Sites in the Tennessee River Near TVA's Watts Bar Nuclear Plant (Rhea and Meigs Counties, TN) 7  112 7/21/2010 TVA TVA N/A TVA New Generation Development and Construction Newsletter - Excerpts from January and July 2010 Describing Aquatic Reports 7 113 October 2010 TVA TVA N/A Analysis of Fish Species Occurrences in Chickamauga Reservoir - A Comparison of Historical and Recent Data 7 114 11/24/2010 TVA TVA N/A Mollusk Survey of the Tennessee River Near Watts Bar Nuclear Plant (Rhea County, Tennessee) 7 115 12/10/2010 TVA TVA N/A NPG Calculation Number EPMRCP052992, Sizing of Traveling Water Screen 7 116 1/6/2011 TVA TVA/L. Johnson TDEC Tennessee Valley Authority (TVA) - Watts Bar Nuclear Plant (WBN) -
NPDES Permit No. TN0020168 - Permit Modification Request -
Antidegradation Review 7 117 February 2011 TVA TVA N/A Hydrothermal Effects on the Ichthyoplankton from the Watts Bar Nuclear Plant Supplemental Condenser Cooling Water Outfall in Upper Chickamauga Reservoir 7
Page 10 of 11
* TVA is located at 400 W. Summit Hill Drive, Knoxville, TN 37902.
  ** This document was originally disclosed in TVA's fifth disclosure update (June 15, 2010) as document number 103. TVA has discovered that the document was inadvertently omitted from subsequent disclosure filings, and is reinserting it as document number 103a.
DOC # DATE LOCATION* AUTHOR/ CUSTODIAN TO SUBJECT/DESCRIPTION CONTENTION 118 February 2011 TVA TVA N/A Hydrothermal Effects on the Ichthyoplankton from the Watts Bar Nuclear Plant Supplemental Condenser Cooling Water Outfall in Upper Chickamauga Reservoir - Appendix A 7 119 March 2011 TVA TVA N/A Discussion of the results of the 2010 Mollusk Survey of the Tennessee River Near Watts Bar Nuclear Plant (Rhea County, Tennessee) 7 120 April 2011 TVA TVA N/A Comparison of 2010 Peak Spawning Seasonal Densities of Ichthyoplankton at Watts Bar Nuclear Plant at Tennessee River Mile 528 with Historical Densities during 1996 and 1997 7 121 March 2011 TVA TVA N/A Fish Impingement at Watts Bar Nuclear Plant Intake Pumping Station Cooling Water Intake Structure during March 2010 through March 2011 7 122 March 2011 TVA TVA N/A Revised Figures for Discussion of the results of the 2010 Mollusk Survey of the Tennessee River Near Watts Bar Nuclear Plant (Rhea County, Tennessee) 7 123 February 2011 TVA TVA N/A Summer 2010 Compliance Survey for Watts Bar Nuclear Plant Outfall 113 Passive Mixing Zone 7 124 May 2010 TVA TVA N/A Biological Monitoring of the Tennessee River Near Watts Bar Nuclear Plant Discharge, Autumn 2009 7 125 1996 TVA G.D. Hickman,  T.A. McDonough N/A Assessing the Reservoir Fish Assemblage Index: A potential measure of reservoir quality, in Reservoir symposium-Multidimensional approaches to reservoir fisheries management American Fisheries Society Symposium 16:85-97 7 126 April 1994 TVA TVA N/A Tennessee Valley Reservoir and Stream Quality - 1993 - Summary of Reservoir Fish Assemblage Results 7
Page 11 of 11
* TVA is located at 400 W. Summit Hill Drive, Knoxville, TN 37902.
  ** This document was originally disclosed in TVA's fifth disclosure update (June 15, 2010) as document number 103. TVA has discovered that the document was inadvertently omitted from subsequent disclosure filings, and is reinserting it as document number 103a.
DOC # DATE LOCATION* AUTHOR/ CUSTODIAN TO SUBJECT/DESCRIPTION CONTENTION 127 August 1996 TVA TVA N/A Aquatic Ecological Health Determinations for TVA Reservoirs - 1995 7 128 August 1997 TVA TVA N/A Aquatic Ecological Health Determinations for TVA Reservoirs - 1996 7 129 April 2011 TVA TVA N/A Fish Impingement at Watts Bar Nuclear Plant Intake Pumping Station Cooling Water Intake Structure during March 2010 through March 2011, Revised April 2011 7 130 4/11/2011 TVA TVA N/A NPG Calculation Number EPMRCP052992, Sizing of Traveling Water Screen, Revision 2 7 131 5/16/11 TVA TVA; Tennessee Wildlife Resources Agency; U.S. Dep't of the Interior; U.S. Army Corps of Engineers; TDEC; The Nature Conservency N/A Memorandum of Understanding for a Cooperative Mollusk Management Strategy 7 132 June 2011 TVA TVA N/A Biological Monitoring of the Tennessee River Near Watts Bar Nuclear Plant Discharge, Autumn 2010 7 133 July 2011 TVA TDEC TVA NPDES Permit No. TN 0020168 for Watts Bar Nuclear Plant 7
Page 1 of 1
* TVA is located at 400 W. Summit Hill Drive, Knoxville, TN 37902.
ENCLOSURE 3 Proprietary Log DOC # DATE LOCATION* AUTHOR/ CUSTODIAN TO SUBJECT/ DESCRIPTION CONTENTION BASIS FOR PROPRIETARY STATUS 1 Mar 2008 TVA Electric Power Research Institute, ORNL N/A The Role of Temperature and Nutritional Status in Impingement of Clupeid Fish Species 7 EPRI Proprietary - Impingement Study 2 Oct 1986 TVA Kenneth P. Cannon, University of Tennessee-Knoxville/TVA N/A An Assessment of the Archaeological Resources of the Watts Bar Reservoir, East Tennessee 7 16 USC § 470hh; 18 CFR § 1312.18
Page 1 of 1 ENCLOSURE 4 Publicly Available Log DOC # DATE LOCATION AUTHOR/ CUSTODIAN TO SUBJECT/ DESCRIPTION CONTENTION 1 Nov 1972 Available at http://www.tva.gov/environment/reports/wattsbar2/related/nov_1972.pdf TVA N/A Environmental Statement, Watts Bar Nuclear Plant Units 1 and 2 1, 7 2 Aug 1993 Available at http://www.tva.gov/environment/reports/wattsbar2/related/aug_1993.pdf TVA N/A Environmental Impact Statement (EIS) Review Watts Bar Nuclear Plant 7 3 Feb 1995 Available at http://www.tva.gov/environment/reports/energyvision2020/index.htm TVA N/A Energy Vision 2020 Integrated Resource Plan/Environmental Impact Statement 7 4 June 2007 Available at http://www.tva.gov/environment/reports/wattsbar2/appendix_d.pdf TVA N/A FSEIS Appendix D:
Response to Comments 7 5 Aug 1998 Available at http://www.tva.gov/environment/reports/wattsbar2/related/aug_1998.pdf TVA N/A Final Environmental Assessment Related to the Watts Bar Nuclear Plant Supplemental Condenser Cooling Water Project 7 6 May 2004 Available at http://www.tva.gov/environment/reports/ros_eis/index.htm TVA N/A Reservoir Operations Study Final Programmatic Environmental Impact Statement 7
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD
__________________________________________ ) In the Matter of     ) )   TENNESSEE VALLEY AUTHORITY   ) Docket No. 50-391 ) (Watts Bar Nuclear Plant, Unit 2)   ) August 15, 2011  
                                                    )
 
In the Matter of                                     )
__________________________________________)  
                                                    )
 
TENNESSEE VALLEY AUTHORITY                           )       Docket No. 50-391
CERTIFICATE OF SERVICE I hereby certify that copies of the "Nineteenth Update to Disclosures Pursuant to 10 CFR
                                                    )
§ 2.336; Tennessee Valley Authority (Watts Bar Nuclear Plant, Unit 2), Docket No. 50-391-OL" and the "Affidavit of William Crouch" have been served on the following persons this 15th day of August, 2011, by Electronic Information Exchange:  
(Watts Bar Nuclear Plant, Unit 2)                   )       August 15, 2011
 
__________________________________________)
Atomic Safety and Licensing Board Panel  
CERTIFICATE OF SERVICE I hereby certify that copies of the Nineteenth Update to Disclosures Pursuant to 10 CFR
 
§ 2.336; Tennessee Valley Authority (Watts Bar Nuclear Plant, Unit 2), Docket No. 50-391-OL and the Affidavit of William Crouch have been served on the following persons this 15th day of August, 2011, by Electronic Information Exchange:
U.S. Nuclear Regulatory Commission Mail Stop: T-3F23  
Atomic Safety and Licensing Board Panel U.S. Nuclear Regulatory Commission                   Office of the Secretary Mail Stop: T-3F23                                   Rulemaking and Adjudications Staff Washington, DC 20555-0001                           U.S. Nuclear Regulatory Commission Lawrence G. McDade, Chair                           Mail Stop: O-16C1 Administrative Judge                                 Washington, DC 20555-0001 E-mail: lgm1@nrc.gov                                 Hearing Docket Paul B. Abramson                                     E-mail: hearingdocket@nrc.gov Administrative Judge E-mail: pba@nrc.gov                                 Office of the General Counsel Gary S. Arnold                                      U.S. Nuclear Regulatory Commission Administrative Judge                                Mail Stop: O-15D21 E-mail: gxa1@nrc.gov                                 Washington, DC 20555-0001 Wen Bu, Law Clerk                                    Edward Williamson, Esq.
 
E-mail: wxb3@nrc.gov                                 E-mail: elw2@nrc.gov David Roth, Esq.
Washington, DC 20555-0001  
Office of Commission Appellate                      E-mail: david.roth@nrc.gov Adjudication                                        Andrea Jones, Esq.
 
U.S. Nuclear Regulatory Commission                  E-mail: andrea.jones@nrc.gov Mail Stop: O-16C1                                    Brian Newell, Paralegal Washington, DC 20555-0001                            E-mail: bpn1@nrc.gov OCAA Mail Center                                    OGC Mail Center E-mail: ocaamail@nrc.gov                             E-mail: OGCMailCenter@nrc.gov
Lawrence G. McDade, Chair Administrative Judge E-mail: lgm1@nrc.gov Paul B. Abramson Administrative Judge E-mail: pba@nrc.gov Gary S. Arnold Administrative Judge E-mail: gxa1@nrc.gov Wen Bu, Law Clerk E-mail: wxb3@nrc.gov
 
Office of Commission Appellate
 
Adjudication
 
U.S. Nuclear Regulatory Commission Mail Stop: O-16C1
 
Washington, DC 20555-0001
 
OCAA Mail Center E-mail: ocaamail@nrc.gov
 
Office of the Secretary Rulemaking and Adjudications Staff
 
U.S. Nuclear Regulatory Commission Mail Stop: O-16C1
 
Washington, DC 20555-0001  
 
Hearing Docket E-mail: hearingdocket@nrc.gov
 
Office of the General Counsel
 
U.S. Nuclear Regulatory Commission Mail Stop: O-15D21
 
Washington, DC 20555-0001 Edward Williamson, Esq.
E-mail: elw2@nrc.gov David Roth, Esq.
E-mail: david.roth@nrc.gov Andrea Jones, Esq.
E-mail: andrea.jones@nrc.gov Brian Newell, Paralegal E-mail: bpn1@nrc.gov OGC Mail Center E-mail: OGCMailCenter@nrc.gov
 
Diane Curran, Esq.
 
Representatives of Southern Alliance for Clean Energy (SACE)
Harmon, Curran, Spielberg &
Eisenberg, L.L.P.
1726 M Street NW, Suite 600
 
Washington, DC 20036 E-mail: dcurran@harmoncurran.com
 
Morgan, Lewis & Bockius LLP 1111 Pennsylvania Avenue, N.W.
 
Washington, D.C. 20004 Co-counsel for Tennessee Valley Authority
 
Paul M. Bessette, Esq.
E-mail: pbessette@morganlewis.com Kathryn M. Sutton, Esq.
E-mail: ksutton@morganlewis.com
 
Signed (electronically) by
/s/ Christopher C. Chandler Christopher C. Chandler Office of the General Counsel Tennessee Valley Authority 400 W. Summit Hill Drive, WT 6A-K Knoxville, TN 37902-1401
 
Phone: (865) 632-7317


Fax: (865) 632-6147 E-mail: ccchandler0@tva.gov Counsel for TVA}}
Morgan, Lewis & Bockius LLP Diane Curran, Esq.                      1111 Pennsylvania Avenue, N.W.
Representatives of Southern Alliance for Washington, D.C. 20004 Clean Energy (SACE)                      Co-counsel for Tennessee Valley Authority Harmon, Curran, Spielberg &              Paul M. Bessette, Esq.
Eisenberg, L.L.P.                        E-mail: pbessette@morganlewis.com 1726 M Street NW, Suite 600              Kathryn M. Sutton, Esq.
Washington, DC 20036                    E-mail: ksutton@morganlewis.com E-mail: dcurran@harmoncurran.com Signed (electronically) by
                                        /s/ Christopher C. Chandler Christopher C. Chandler Office of the General Counsel Tennessee Valley Authority 400 W. Summit Hill Drive, WT 6A-K Knoxville, TN 37902-1401 Phone: (865) 632-7317 Fax: (865) 632-6147 E-mail: ccchandler0@tva.gov Counsel for TVA}}

Latest revision as of 18:12, 10 March 2020

Nineteenth Update to Disclosures Pursuant to 10 CFR Section 2.336; Tennessee Valley Authority
ML11227A134
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 08/15/2011
From: Chandler C
Tennessee Valley Authority
To: Curran D, Roth D
Harmon, Curran, Harmon, Curran, Spielberg & Eisenberg, LLP, NRC/OGC
SECY RAS
References
RAS 20765, 50-391-OL, ASLBP 09-893-01-OL-BD01
Download: ML11227A134 (21)


Text

August 15, 2011 Ms. Diane Curran Harmon, Curran, Spielberg & Eisenberg, L.L.P.

1726 M Street NW, Suite 600 Washington, DC 20036 Mr. David Roth Office of the General Counsel U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 RE: Nineteenth Update to Disclosures Pursuant to 10 CFR § 2.336; Tennessee Valley Authority (Watts Bar Nuclear Plant, Unit 2), Docket No. 50-391-OL Pursuant to 10 CFR § 2.336 and the agreement among the parties regarding mandatory discovery disclosures dated December 1, 2009, the Tennessee Valley Authority (TVA) is providing the nineteenth update to its mandatory disclosures with respect to Intervenors Contention 7, as admitted by the Board on November 19, 2009 (LBP-09-26).

In order to compile the indices in Enclosures 2, 3, and 4, a search was conducted of documents in TVAs possession, custody, or control since the eighteenth update to disclosures dated July 15, 2011. Attached is a supporting affidavit. TVAs nineteenth disclosure update consists of the following:

  • Enclosure 1 provides the names, addresses, and telephone numbers of the persons upon whose opinion TVA will base its positions on the contention and upon whom TVA may rely as a witness, and a copy of the analyses and authorities upon which they base their opinions.
  • Enclosure 2 provides a description, by category and location, of non-privileged documents, data compilations, and tangible things in the possession, custody, or control of TVA that are relevant to the admitted contentions in this proceeding. If you determine that you would like a copy of any of these documents, please inform me of which documents you would like, and I will provide a copy to you.
  • Enclosure 3 provides an index of documents, data compilations, or tangible things that may be relevant to the contentions but that contain proprietary information, Sensitive Unclassified Non-Safeguards Information (SUNSI), or otherwise protected information. Upon request by the NRC staff, TVA will provide a copy of any such material using the procedure in 10 CFR

§ 2.390. TVA will provide any requested proprietary documents to the Intervenors after the Board has entered a Protective Order and the Intervenors have signed and returned to TVA the Non-Disclosure Agreement.

  • Enclosure 4 provides an index of relevant documents that are otherwise publicly available.

Ms. Diane Curran Mr. David Roth Page 2 August 15, 2011 In the event that TVA identifies additional relevant documents or the witnesses for any hearing on the contentions, TVA will update these disclosures periodically on the fifteenth day of each month as required by the December 1, 2009 mandatory disclosure agreement.

In order to compile these enclosures, TVA made a reasonable search of its records. We are attaching an affidavit which attests that all relevant materials identified by this search have been disclosed, and that the disclosures are accurate and complete as of August 15, 2011. Also, we have highlighted the additions to the logs since the last disclosures.

TVA has been conservative in identifying documents for inclusion in Enclosures 2, 3, and 4. By identifying documents on those Enclosures, TVA does not necessarily concede that the documents are in fact relevant or material to the admitted contentions. Also, in order to facilitate your review of these disclosures, we have made a good faith effort to identify the contention number(s) to which each record is responsive. These determinations, however, do not constitute an admission that each and every record is necessarily responsive to that contention(s), and documents may be responsive to additional contentions not identified.

Sincerely, Signed (electronically) by

/s/ Christopher C. Chandler Christopher C. Chandler Office of the General Counsel Tennessee Valley Authority 400 W. Summit Hill Drive, WT 6A-K Knoxville, TN 37902-1401 Phone: (865) 632-7317 Fax: (865) 632-6147 E-mail: ccchandler0@tva.gov Counsel for TVA Attachments cc: Service List

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD

)

In the Matter of )

) Docket No. 50-391 TENNESSEE VALLEY AUTHORITY )

) August 15, 2011 (Watts Bar Nuclear Plant, Unit 2) )

)

)

AFFIDAVIT

1. My name is William Crouch. My title is Manager, Nuclear Licensing and Industry Affairs, Nuclear Generation Development & Construction, at Unit 2 of the Tennessee Valley Authoritys (TVA) Watts Bar Nuclear Plant. Working with the attorneys for TVA, I have been responsible for managing the searches, collection, and compilation of documents, data compilations, and tangible things to comply with the mandatory disclosure requirements in 10 CFR § 2.336.
2. This Affidavit relates to the nineteenth update to disclosures that TVA is providing on August 15, 2011, in the above-captioned proceeding pursuant to 10 CFR § 2.336 and the parties joint agreement on mandatory disclosures, dated December 1, 2009.
3. A search was conducted of documents, data compilations, and tangible things under the custody and control of TVA since it filed its eighteenth update to the disclosures for the types of information specified in 10 CFR § 2.336(a). As provided in 10 CFR § 2.336(c),

this search was conducted based on information and documents reasonably available to TVA:

a. The searches encompassed both electronic and paper documents.
b. The searches encompassed both Watts Bar 2 project-related files and documents in the possession and control of individuals who have worked on the Watts Bar 2 project.
c. Searches did not encompass documents in the possession of individuals who did not work on the Watts Bar 2 project or files unrelated to the Watts Bar 2 project.
4. Enclosure 2 provides the index of relevant non-privileged, non-protected documents, data compilations, and tangible things that were located as a result of this search.
5. Enclosure 3 provides the index of relevant documents, data compilations, and tangible things containing proprietary-related information.
6. Enclosure 4 provides the index of relevant documents, data compilations, and tangible things that are publicly available.
7. TVA has been conservative in identifying documents for inclusion in Enclosures 2, 3, and 4. By identifying documents on those Enclosures, TVA does not necessarily concede that the documents are in fact relevant or material to the admitted contentions.
8. These disclosures are accurate and complete as of August 15, 2011.

The statements made above are true to the best of my knowledge, information, and belief.

I declare under penalty of perjury that the foregoing is true and correct.

Executed in Accord with 10 CFR § 2.304(d)

/s/ William Crouch_________

William Crouch Manager, Nuclear Licensing and Industry Affairs Watts Bar Nuclear Plant, Unit 2 Tennessee Valley Authority Spring City, TN 37381 Phone: 423-365-2004 E-mail: wdcrouch@tva.gov Executed this 15th day of August 2011

ENCLOSURE 1 TVA WITNESSES The name and, if known, the address and telephone number of any person, including any expert, upon whose opinion the party bases its claims and contentions and may rely upon as a witness:

Response

TVA may rely on the following witnesses in support of its position:

Dr. Charles C. Coutant 120 Miramar Circle Oak Ridge, Tennessee 37830 Dennis S. Baxter Tennessee Valley Authority 400 W. Summit Hill Drive, WT 11C-K Knoxville, Tennessee 37904 (865) 632-6404 John T. Baxter Tennessee Valley Authority 400 W. Summit Hill Drive, WT 11B-K Knoxville, Tennessee 37904 (865) 632-3360 Dr. Paul N. Hopping Tennessee Valley Authority 400 W. Summit Hill Drive, WT 10B-K Knoxville, Tennessee 37904 (865) 632-2881 A copy of the analysis or other authority upon which that person bases his or her opinion:

Response

Currently, TVA bases its position on the following sections of the Watts Bar FSEIS and the references cited therein:

  • Contention 7 (Aquatic Impacts) - - FSEIS chs. 2.2, 2.4, 3.1, 3.2, tbls. 1-1, 2-1, and references cited therein.

The Watts Bar Unit 2 FSEIS is publicly available at http://www.nrc.gov/reactors/plant-specific-items/watts-bar/key-correspondence.html.

TVA will update this disclosure when it has identified the persons that it may use as witnesses and the analyses and authorities upon which they base their opinions.

Page 1 of 11 ENCLOSURE 2 Mandatory Disclosure Log DOC AUTHOR/

DATE LOCATION* TO SUBJECT/DESCRIPTION CONTENTION

  1. CUSTODIAN Watts Bar Nuclear Plant Supplemental Condenser 1 Jan 2001 TVA TVA N/A Cooling Water System 7 Fish Monitoring Program Final Report Biological Monitoring of the Tennessee River Near 2 May 2009 TVA TVA N/A 7 Watts Bar Nuclear Plant Discharge, 2008 Biological Monitoring of the Tennessee River Near 3 May 2008 TVA TVA N/A 7 Watts Bar Nuclear Plant Discharge, 2007 Biological Monitoring of the Tennessee River Near 4 May 2007 TVA TVA N/A 7 Watts Bar Nuclear Plant Discharge, 2006 Biological Monitoring of the Tennessee River Near 5 May 2006 TVA TVA N/A 7 Watts Bar Nuclear Plant Discharge, 2005 Biological Monitoring of the Tennessee River Near 6 June 2005 TVA TVA N/A 7 Watts Bar Nuclear Plant Discharge, 2004 Biological Monitoring of the Tennessee River Near 7 June 2004 TVA TVA N/A 7 Watts Bar Nuclear Plant Discharge, 2003 Biological Monitoring of the Tennessee River Near 8 June 2003 TVA TVA N/A 7 Watts Bar Nuclear Plant Discharge, 2002 Summary of Preoperational Monitoring of the Mussel Fauna in 9 Sept 1994 TVA TVA N/A Upper Chickamauga 7 Reservoir in the Vicinity of the Watts Bar Nuclear Plant, 1983-1993 The Effects of Aquatic Macrophytes on Fish 10 Sept 1993 TVA TVA N/A Populations of 7 Chickamauga Reservoir Coves, 1970-90 Update of the Watts Bar Nuclear Plant Preoperational Monitoring 11 May 1989 TVA TVA N/A 7 of the Mussel Fauna in Upper Chickamauga Reservoir Watts Bar Nuclear Plant Preoperational Aquatic 12 Apr 1980 TVA TVA N/A 7 Monitoring Report, 1973-1977
  • TVA is located at 400 W. Summit Hill Drive, Knoxville, TN 37902.
    • This document was originally disclosed in TVAs fifth disclosure update (June 15, 2010) as document number 103. TVA has discovered that the document was inadvertently omitted from subsequent disclosure filings, and is reinserting it as document number 103a.

Page 2 of 11 DOC AUTHOR/

DATE LOCATION* TO SUBJECT/DESCRIPTION CONTENTION

  1. CUSTODIAN Watts Bar Nuclear Plant Preoperational Aquatic 13 Mar 1980 TVA TVA N/A 7 Monitoring Report, 1977-1979 Watts Bar Nuclear Plant Supplemental Condenser 14 Dec 1997 TVA TVA N/A 7 Cooling Water Project Thermal Plume Modeling Tennessee Technological Watts Bar Tailwater University Center for Fishery Creel Survey, 15 Apr 1997 TVA the Management, N/A 7 April 1996 through March Utilization and 1997, Interim Report Protection of Water Resources Biological Monitoring of the Tennessee River Near 16 June 2002 TVA TVA N/A 7 Watts Bar Nuclear Plant Discharge, 2001 Status of the White Crappie Population in 17 Oct 1990 TVA TVA N/A 7 Chickamauga Reservoir Final Project Report Status of the Channel Catfish Population in 18 Aug 1991 TVA TVA N/A Chickamauga Reservoir 7 First Year Progress Report Recommendation and Implementation of Special Seasonal Flow Releases 19 May 1992 TVA TVA N/A 7 to Enhance Sauger Spawning in Watts Bar Tailwater Preoperational Assessment of Water Quality and Biological 20 Dec 1986 TVA TVA N/A Resources of 7 Chickamauga Reservoir, Watts Bar Nuclear Plant, 1973-1985 Preoperational Assessment of Water Quality and Biological 21 Dec 1986 TVA TVA N/A Resources of 7 Chickamauga Reservoir, Watts Bar Nuclear Plant, 1973-1985, Appendices Population Survey of 22 Aug 1991 TVA TVA N/A Sauger in Chickamauga 7 Reservoir, 1990-1991 Population Survey of Sauger (Stizostedion 23 Aug 1990 TVA TVA N/A canadense) in 7 Chickamauga Reservoir, 1989 Fish Community Assessment of Selected 24 Apr 1992 TVA TVA N/A 7 Chickamauga Reservoir Embayments
  • TVA is located at 400 W. Summit Hill Drive, Knoxville, TN 37902.
    • This document was originally disclosed in TVAs fifth disclosure update (June 15, 2010) as document number 103. TVA has discovered that the document was inadvertently omitted from subsequent disclosure filings, and is reinserting it as document number 103a.

Page 3 of 11 DOC AUTHOR/

DATE LOCATION* TO SUBJECT/DESCRIPTION CONTENTION

  1. CUSTODIAN Estimates of Entrainment of Fish Eggs and Larvae By Watts Bar Steam Plant, 1975, and 25 Sept 1976 TVA TVA N/A 7 Assessment of the Impact of the Fisheries Resources of Watts Bar Reservoir Environmental Information, Watts Bar 26 Nov 1976 TVA TVA N/A 7 Nuclear Plant Units 1 and 2 Chickamauga Reservoir Sauger Investigation, 27 1996 TVA TVA N/A 7 1993-1995, Final Project Report Chickamauga White Bass 28 Sept 1994 TVA TVA N/A Study, 1990-1992, Final 7 Project Report Chickamauga Reservoir 29 Feb 2000 TVA TVA N/A Fisheries Monitoring, 1999 7 Cove Rotenone Results Chickamauga Reservoir 30 June 2000 TVA TVA N/A Fisheries Monitoring, 1999 7 Cove Rotenone Results Chickamauga Reservoir 31 May 1996 TVA TVA N/A 1995 Fisheries Monitoring 7 Cove Rotenone Results Chickamauga Reservoir 32 June 1992 TVA TVA N/A 1991 Fisheries Monitoring 7 Cove Rotenone Results Chickamauga Reservoir 33 June 1991 TVA TVA N/A 1990 Fisheries Monitoring 7 Cove Rotenone Results Chickamauga Reservoir 34 June 1990 TVA TVA. N/A 1989 Fisheries Monitoring 7 Cove Rotenone Results Chickamauga Reservoir 35 June 1989 TVA TVA N/A 1988 Fisheries Monitoring 7 Cove Rotenone Results Aquatic Environmental Conditions in the Vicinity 36 June 1997 TVA TVA N/A of Watts Bar Nuclear Plant 7 During the First Year of Operation, 1996 Aquatic Environmental Conditions in the Vicinity 37 June 1998 TVA TVA N/A of Watts Bar Nuclear Plant 7 During Two Years of Operation, 1996-1997 Aquatic Ecological Health 38 Aug 1999 TVA TVA N/A Determinations for TVA 7 Reservoirs - 1998 Aquatic Ecological Health 39 Sept 2001 TVA TVA N/A Determinations for TVA 7 Reservoirs - 2000 Aquatic Ecological Health 40 Apr 1995 TVA TVA N/A Determinations for TVA 7 Reservoirs - 1994
  • TVA is located at 400 W. Summit Hill Drive, Knoxville, TN 37902.
    • This document was originally disclosed in TVAs fifth disclosure update (June 15, 2010) as document number 103. TVA has discovered that the document was inadvertently omitted from subsequent disclosure filings, and is reinserting it as document number 103a.

Page 4 of 11 DOC AUTHOR/

DATE LOCATION* TO SUBJECT/DESCRIPTION CONTENTION

  1. CUSTODIAN 1990 Preoperational Monitoring of the Mussel Fauna in Upper 41 Mar 1991 TVA TVA N/A 7 Chickamauga Reservoir in the Vicinity of the Watts Bar Nuclear Plant Watts Bar Native Mussel Enhancement Project:

Preliminary Evaluation of an Artificial Boulder Field 42 Feb 2002 TVA TVA N/A for Enhancing Native 7 Mussel Habitat in the Watts Bar Tailwater, Tennessee River Mile 528.5 Reservoir Monitoring-1991 Summary of Vital Signs 43 July 1992 TVA TVA N/A and Use Impairment 7 Monitoring on Tennessee Valley Reservoirs Final Environmental Impact Statement: Watts 44 July 1981 TVA TVA N/A Bar Waste Heat Park, 7 Rhea County, Tennessee, Volume I Final Environmental Impact Statement: Watts 45 July 1981 TVA TVA N/A Bar Waste Heat Park, 7 Rhea County, Tennessee, Volume II Effects of Watts Bar Nuclear Plant and Watts Bar Steam Plant 46 Feb 1977 TVA TVA N/A 7 Discharges on Chickamauga Lake Water Temperatures Results of Hydrothermal Model Tests of the 47 May 1977 TVA TVA N/A 7 Multiport Diffuser System Watts Bar Nuclear Plant Discharge Temperature 48 Dec 1993 TVA TVA N/A Limit Evaluation for Watts 7 Bar Nuclear Plant Tennessee Valley Reservoir and Stream Quality - 1993 49 May 1994 TVA TVA N/A Summary of Vital Signs 7 and Use Suitability Monitoring Volume I Tennessee Valley Reservoir and Stream Quality - 1993 50 May 1994 TVA TVA N/A Summary of Vital Signs 7 and Use Suitability Monitoring Volume II Hydrodynamics and Water Temperature Modeling at 51 Nov 1998 TVA TVA N/A 7 Watts Bar SCCW Discharge Structure

  • TVA is located at 400 W. Summit Hill Drive, Knoxville, TN 37902.
    • This document was originally disclosed in TVAs fifth disclosure update (June 15, 2010) as document number 103. TVA has discovered that the document was inadvertently omitted from subsequent disclosure filings, and is reinserting it as document number 103a.

Page 5 of 11 DOC AUTHOR/

DATE LOCATION* TO SUBJECT/DESCRIPTION CONTENTION

  1. CUSTODIAN Proposed Modifications to Water Temperature 52 Oct 2004 TVA TVA N/A Effluent Requirements for 7 Watts Bar Nuclear Plant Outfall 113 Threadfin Shad Oak Ridge National 53 May 1980 TVA NRC Impingement: Effect of 7 Laboratory (ORNL)

Cold Stress GE Water & Process Water Analysis Report for 54 11/12/2008 TVA TVA 7 Technologies/TVA 30 Oct 2008 1997 Verification Studies 55 May 2004 TVA TVA N/A of Thermal Discharge for 7 Watts Bar Nuclear Plant RFP 103006 Report Rev1 Dynamic Solutions, 56 2/9/2007 TVA N/A Watts Bar Unit 2 Thermal 7 LLC/TVA Effluent Study Hydrothermal Data for 57 Sept 2001 TVA TVA N/A Watts Bar Nuclear Plant 7 SCCW Outfall July 1999 Verification Study of Thermal Discharge for Watts Bar 58 Nov 1999 TVA TVA N/A 7 Nuclear Plant Supplemental Condenser Cooling Water System Summer 2005 Compliance Survey for 59 Feb 2006 TVA TVA N/A Watts Bar Nuclear Plant 7 Outfall 113 Passive Mixing Zone Summer 2006 Compliance Survey for 60 Jan 2007 TVA TVA N/A Watts Bar Nuclear Plant 7 Outfall 113 Passive Mixing Zone Winter 2005 Compliance Survey for Watts Bar 61 Oct 2005 TVA TVA N/A 7 Nuclear Plant Outfall 113 Passive Mixing Zone Winter 2006 Compliance Survey for Watts Bar 62 Jan 2007 TVA TVA N/A 7 Nuclear Plant Outfall 113 Passive Mixing Zone Aquatic Ecological Health 63 Sept 2000 TVA TVA N/A Determinations for TVA 7 Reservoirs - 1999 Aquatic Ecological Health Determinations for TVA 64 Sept 2000 TVA TVA N/A 7 Reservoirs - 1999 Appendices Aquatic Ecological Health Determinations for TVA 65 April 1998 TVA TVA N/A 7 Reservoirs - 1997 Sections 1 through 3 Aquatic Ecological Health Determinations for TVA 66 April 1998 TVA TVA N/A 7 Reservoirs - 1997 Sections 4 through 6 Aquatic Ecological Health Determinations for TVA 67 April 1998 TVA TVA N/A 7 Reservoirs - 1997 Appendices

  • TVA is located at 400 W. Summit Hill Drive, Knoxville, TN 37902.
    • This document was originally disclosed in TVAs fifth disclosure update (June 15, 2010) as document number 103. TVA has discovered that the document was inadvertently omitted from subsequent disclosure filings, and is reinserting it as document number 103a.

Page 6 of 11 DOC AUTHOR/

DATE LOCATION* TO SUBJECT/DESCRIPTION CONTENTION

  1. CUSTODIAN Results of Plankton Studies Conducted in 1986 and 1987 as Part of 68 Jan 1988 TVA TVA N/A the Operational Aquatic 7 Monitoring Program at Sequoyah Nuclear Plant, Chickamauga Reservoir Reservoir Monitoring 69 1991 TVA TVA N/A Fiscal Year 1991 7 Workplan Email discussing follow-up 70 11/15/2006 TVA TVA/R. Horton J. Chardos 7 mussel habitat survey Email addressing status of 71 10/12/2006 TVA TVA/S. Chance R. Horton mussels and potential for 7 follow-up mussel survey Email discussing R. Sherrad, J.

72 6/1/2007 TVA TVA/D. Wade ammonia toxicity and 7 Wright, H, Rucker mussel studies Notes on Permitting Meeting with Tennessee 73 6/1/2007 TVA TVA/R. Horton N/A Department of 7 Environment and Conservation (TDEC)

Diagram depicting summer and winter mode 74 Jan 2007 TVA TVA/P. Hopping N/A 7 operating of Watts Bar SCCW Email discussing potential J. Chardos, B.

75 5/25/2007 TVA TVA/ S. Chance endangered species 7 Yeager, R. Horton mitigation measures List of possible 76 May 2007 TVA TVA N/A endangered species 7 mitigation measures Email discussing compilation of required 77 1/19/2007 TVA TVA/R. Horton J. Phillips 1 permits list for Watts Bar Unit 2 Email forwarding draft Bellefonte permit table to D. Pittman, J.

78 12/20/2006 TVA TVA/R. Horton serve as a guide for use in 1 Phillips preparing updated Watts Bar application Draft table of permits Enercon/D.

79 Nov 2006 TVA N/A required for Bellefonte 1 Luchsinger COL application Email discussion concerning inclusion of Watts Bar construction 80 1/23/2007 TVA TVA/R. Horton J. Phillips 1 permit and operating license in list of required permits Email discussing design 81 5/31/2007 TVA TVA/P. Hopping R. Horton bases for Outfall 101 and 7 113 discharges Watts Bar Nuclear Plant NPDES Water Withdrawal Registration Form for 82 2/13/2008 TVA TVA/D. Hutchison TDEC Calendar Year 2007 and 7 Revised Registration Form for Calendar Year 2006

  • TVA is located at 400 W. Summit Hill Drive, Knoxville, TN 37902.
    • This document was originally disclosed in TVAs fifth disclosure update (June 15, 2010) as document number 103. TVA has discovered that the document was inadvertently omitted from subsequent disclosure filings, and is reinserting it as document number 103a.

Page 7 of 11 DOC AUTHOR/

DATE LOCATION* TO SUBJECT/DESCRIPTION CONTENTION

  1. CUSTODIAN Comparison of Fish Species Occurrence and Trends in Reservoir Fish Assemblage Index 83 Sept 2009 TVA TVA N/A 7 Results in Chickamauga Reservoir before and after Watts Bar Nuclear Plant Unit 1 Operation Effects of Thermal Effluent From Sequoyah Nuclear 84 Dec 1995 TVA TVA N/A 7 Plant on Fish Populations in Chickamauga Reservoir Figures showing sampling 85 Dec 2009 TVA TVA N/A locations in Watts Bar and 7 Chickamauga Reservoirs Intake Temperature 86 Nov 2003 TVA TVA N/A Prediction at Kingston 7 Fossil Power Plant Email summarizing meeting between TVA and TDEC to discuss B. Eiford-Lee, D.

87 4/25/2007 TVA TVA/R. Horton Biocide/Corrosion 7 Pittman, et al.

Treatment Plant modifications and NPDES permit renewal Categorical Exclusion Checklist, Increase in 88 2/20/2004 TVA TVA N/A 7 Allowable UHS Temperature to 88°F Chapter 20: Reservoir Fish Assemblage Index Development: A Tool for Assessing Ecological Health in Tennessee T.A. McDonough, Valley Authority 89 1999 TVA N/A 7 G.D. Hickman Impoundments, in Assessing the Sustainability and Biological Integrity of Water Resources Using Fish Communities Watts Bar Nuclear Plant Unit 2 - Additional 90 12/23/2009 TVA TVA NRC Information Regarding 7 Environmental Review (TAC No. MD8203)

Watts Bar Nuclear Plant Unit 2 - Response to U.S.

Nuclear Regulatory Commission (NRC) 91 4/9/2010 TVA TVA NRC 1, 7 Request for Additional Information Regarding Environmental Review (TAC No. MD8203)

Attachment 2 to April 9, 92 4/9/2010 TVA TVA NRC 2010 RAI response: G-5 1 Permit Table Attachment 17 to April 9, 2010 RAI response: TVA 93 1976 TVA TVA N/A 7 1976, Impingement at Watts Bar Steam Plant

  • TVA is located at 400 W. Summit Hill Drive, Knoxville, TN 37902.
    • This document was originally disclosed in TVAs fifth disclosure update (June 15, 2010) as document number 103. TVA has discovered that the document was inadvertently omitted from subsequent disclosure filings, and is reinserting it as document number 103a.

Page 8 of 11 DOC AUTHOR/

DATE LOCATION* TO SUBJECT/DESCRIPTION CONTENTION

  1. CUSTODIAN Sport Fishing Index (SFI):

A method to quantify sport 94 2000 TVA G.D. Hickman N/A fishing quality, in 7 Environmental Science &

Policy 3, S177-S125.

TVA/R.W. Schneider Kingston Steam Plant 316 95 1980 TVA N/A 7 and J.D. Tuberville Permit Renewal Report Fish Impingement at Watts Bar Nuclear Plant Supplemental Condenser 96 2007 TVA TVA N/A 7 Cooling Water Intake Structure During 2005 Through 2007 WBN Summary Work Plan 97 2010 TVA TVA N/A for Preoperational and 7 Operational Monitoring Watts Bar Nuclear Plant Unit 2 - Response to U.S.

Nuclear Regulatory Commission (NRC) 98 5/12/2010 TVA TVA NRC 7 Request for Additional Information Regarding Environmental Review (TAC No. MD8203)

Summary of Hydrothermal 99 May 2010 TVA TVA N/A Sampling for WBN SCCW 7 Field Tests Aquatic Environmental Conditions in the Vicinity of Watts Bar Nuclear Plant 100 6/7/2010 TVA TVA N/A 7 During Two Years of Operation, 1996-1997, Revised 6/7/2010 Watts Bar Nuclear Plant Process Sampling for 101 4/26/2010 TVA TVA N/A NPDES Permit Unit 2 7 Modification Request (Permit No. TN 0020168)

Email summarizing observation of 102 5/24/2010 TVA TVA/J. Phillips S. Howard 7 hydrothermal sampling at Watts Bar Nuclear Plant Comparison of Fish Species Occurrence and Trends in Reservoir Fish Assemblage Index 103 June 2010 TVA TVA N/A Results in Chickamauga 7 Reservoir before and after Watts Bar Nuclear Plant Unit 1 Operation Revised June 2010 NPDES Permit No. TN 103a** 6/4/10 TVA TDEC TVA 0020168 for Watts Bar 7 Nuclear Plant (Unit 1)

WBN Unit 2 Condenser 104 2/16/2010 TVA TVA TDEC Cooling Water System 7 Test Flush WBN Unit 2 Flushes and 105 6/14/2010 TVA TVA TDEC Hydrostatic Testing 7 Schedule WBN General Permit for Discharges of Hydrostatic 106 6/29/10 TVA TVA TDEC 7 Test Water - Notice of Intent

  • TVA is located at 400 W. Summit Hill Drive, Knoxville, TN 37902.
    • This document was originally disclosed in TVAs fifth disclosure update (June 15, 2010) as document number 103. TVA has discovered that the document was inadvertently omitted from subsequent disclosure filings, and is reinserting it as document number 103a.

Page 9 of 11 DOC AUTHOR/

DATE LOCATION* TO SUBJECT/DESCRIPTION CONTENTION

  1. CUSTODIAN Summary of Hydrothermal August 107 TVA TVA N/A Sampling for WBN SCCW 7 2010 Field Tests Tennessee Valley Authority (TVA) - Watts Bar Nuclear Plant (WBN) -

NPDES Permit No.

108 8/17/2010 TVA TVA TDEC 7 TN0020168 - Permit Modification Request -

Addition of Unit 2 Operation Email notifying TDEC of collection of pink mucket 109 9/30/2010 TVA TVA/J. Baxter TDEC 7 and sheepnose in Watts Bar tailwater Winter 2010 Compliance August Survey for Watts Bar 110 TVA TVA N/A 7 2010 Nuclear Plant Outfall 113 Passive Mixing Zone Mollusk and Habitat Survey of Four Sites in the Tennessee River Near 111 9/14/2010 TVA TVA N/A 7 TVAs Watts Bar Nuclear Plant (Rhea and Meigs Counties, TN)

TVA New Generation Development and Construction Newsletter -

112 7/21/2010 TVA TVA N/A 7 Excerpts from January and July 2010 Describing Aquatic Reports Analysis of Fish Species Occurrences in October Chickamauga Reservoir -

113 TVA TVA N/A 7 2010 A Comparison of Historical and Recent Data Mollusk Survey of the Tennessee River Near 114 11/24/2010 TVA TVA N/A Watts Bar Nuclear Plant 7 (Rhea County, Tennessee)

NPG Calculation Number 115 12/10/2010 TVA TVA N/A EPMRCP052992, Sizing 7 of Traveling Water Screen Tennessee Valley Authority (TVA) - Watts Bar Nuclear Plant (WBN) -

116 1/6/2011 TVA TVA/L. Johnson TDEC NPDES Permit No. 7 TN0020168 - Permit Modification Request -

Antidegradation Review Hydrothermal Effects on the Ichthyoplankton from the Watts Bar Nuclear February 117 TVA TVA N/A Plant Supplemental 7 2011 Condenser Cooling Water Outfall in Upper Chickamauga Reservoir

  • TVA is located at 400 W. Summit Hill Drive, Knoxville, TN 37902.
    • This document was originally disclosed in TVAs fifth disclosure update (June 15, 2010) as document number 103. TVA has discovered that the document was inadvertently omitted from subsequent disclosure filings, and is reinserting it as document number 103a.

Page 10 of 11 DOC AUTHOR/

DATE LOCATION* TO SUBJECT/DESCRIPTION CONTENTION

  1. CUSTODIAN Hydrothermal Effects on the Ichthyoplankton from the Watts Bar Nuclear February Plant Supplemental 118 TVA TVA N/A 7 2011 Condenser Cooling Water Outfall in Upper Chickamauga Reservoir -

Appendix A Discussion of the results of the 2010 Mollusk March Survey of the Tennessee 119 TVA TVA N/A 7 2011 River Near Watts Bar Nuclear Plant (Rhea County, Tennessee)

Comparison of 2010 Peak Spawning Seasonal Densities of Ichthyoplankton at Watts 120 April 2011 TVA TVA N/A Bar Nuclear 7 Plant at Tennessee River Mile 528 with Historical Densities during 1996 and 1997 Fish Impingement at Watts Bar Nuclear Plant March Intake Pumping Station 121 TVA TVA N/A 7 2011 Cooling Water Intake Structure during March 2010 through March 2011 Revised Figures for Discussion of the results of the 2010 Mollusk March 122 TVA TVA N/A Survey of the Tennessee 7 2011 River Near Watts Bar Nuclear Plant (Rhea County, Tennessee)

Summer 2010 Compliance Survey for February 123 TVA TVA N/A Watts Bar Nuclear Plant 7 2011 Outfall 113 Passive Mixing Zone Biological Monitoring of the Tennessee River Near 124 May 2010 TVA TVA N/A 7 Watts Bar Nuclear Plant Discharge, Autumn 2009 Assessing the Reservoir Fish Assemblage Index: A potential measure of reservoir quality, in Reservoir symposium-G.D. Hickman, 125 1996 TVA N/A Multidimensional 7 T.A. McDonough approaches to reservoir fisheries management American Fisheries Society Symposium 16:85-97 Tennessee Valley Reservoir and Stream 126 April 1994 TVA TVA N/A Quality - 1993 - Summary 7 of Reservoir Fish Assemblage Results

  • TVA is located at 400 W. Summit Hill Drive, Knoxville, TN 37902.
    • This document was originally disclosed in TVAs fifth disclosure update (June 15, 2010) as document number 103. TVA has discovered that the document was inadvertently omitted from subsequent disclosure filings, and is reinserting it as document number 103a.

Page 11 of 11 DOC AUTHOR/

DATE LOCATION* TO SUBJECT/DESCRIPTION CONTENTION

  1. CUSTODIAN Aquatic Ecological Health August 127 TVA TVA N/A Determinations for TVA 7 1996 Reservoirs - 1995 Aquatic Ecological Health August 128 TVA TVA N/A Determinations for TVA 7 1997 Reservoirs - 1996 Fish Impingement at Watts Bar Nuclear Plant Intake Pumping Station 129 April 2011 TVA TVA N/A Cooling Water Intake 7 Structure during March 2010 through March 2011, Revised April 2011 NPG Calculation Number EPMRCP052992, Sizing 130 4/11/2011 TVA TVA N/A 7 of Traveling Water Screen, Revision 2 TVA; Tennessee Wildlife Resources Agency; U.S. Dept Memorandum of of the Interior; U.S. Understanding for a 131 5/16/11 TVA N/A 7 Army Corps of Cooperative Mollusk Engineers; TDEC; Management Strategy The Nature Conservency Biological Monitoring of the Tennessee River Near 132 June 2011 TVA TVA N/A 7 Watts Bar Nuclear Plant Discharge, Autumn 2010 NPDES Permit No. TN 133 July 2011 TVA TDEC TVA 0020168 for Watts Bar 7 Nuclear Plant
  • TVA is located at 400 W. Summit Hill Drive, Knoxville, TN 37902.
    • This document was originally disclosed in TVAs fifth disclosure update (June 15, 2010) as document number 103. TVA has discovered that the document was inadvertently omitted from subsequent disclosure filings, and is reinserting it as document number 103a.

Page 1 of 1 ENCLOSURE 3 Proprietary Log BASIS FOR AUTHOR/ SUBJECT/

DOC # DATE LOCATION* TO CONTENTION PROPRIETARY CUSTODIAN DESCRIPTION STATUS The Role of Electric Power Temperature and EPRI Proprietary -

1 Mar 2008 TVA Research Institute, N/A Nutritional Status in 7 Impingement Study ORNL Impingement of Clupeid Fish Species An Assessment of Kenneth P. Cannon, the Archaeological University of 16 USC § 470hh; 2 Oct 1986 TVA N/A Resources of the 7 Tennessee- 18 CFR § 1312.18 Watts Bar Reservoir, Knoxville/TVA East Tennessee

  • TVA is located at 400 W. Summit Hill Drive, Knoxville, TN 37902.

Page 1 of 1 ENCLOSURE 4 Publicly Available Log DOC AUTHOR/ SUBJECT/

DATE LOCATION TO CONTENTION

  1. CUSTODIAN DESCRIPTION Available at Environmental http://www.tva.gov/environme Statement, Watts 1 Nov 1972 TVA N/A 1, 7 nt/reports/wattsbar2/related/n Bar Nuclear Plant ov_1972.pdf Units 1 and 2 Environmental Available at Impact Statement http://www.tva.gov/environme 2 Aug 1993 TVA N/A (EIS) Review 7 nt/reports/wattsbar2/related/a Watts Bar Nuclear ug_1993.pdf Plant Energy Vision 2020 Available at Integrated http://www.tva.gov/environme 3 Feb 1995 TVA N/A Resource 7 nt/reports/energyvision2020/i Plan/Environmental ndex.htm Impact Statement Available at FSEIS Appendix D:

http://www.tva.gov/environme 4 June 2007 TVA N/A Response to 7 nt/reports/wattsbar2/appendix Comments

_d.pdf Final Environmental Available at Assessment http://www.tva.gov/environme Related to the 5 Aug 1998 nt/reports/wattsbar2/related/a TVA N/A Watts Bar Nuclear 7 ug_1998.pdf Plant Supplemental Condenser Cooling Water Project Reservoir Available at Operations Study 6 May 2004 http://www.tva.gov/environme TVA N/A Final Programmatic 7 nt/reports/ros_eis/index.htm Environmental Impact Statement

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD

)

In the Matter of )

)

TENNESSEE VALLEY AUTHORITY ) Docket No. 50-391

)

(Watts Bar Nuclear Plant, Unit 2) ) August 15, 2011

__________________________________________)

CERTIFICATE OF SERVICE I hereby certify that copies of the Nineteenth Update to Disclosures Pursuant to 10 CFR

§ 2.336; Tennessee Valley Authority (Watts Bar Nuclear Plant, Unit 2), Docket No. 50-391-OL and the Affidavit of William Crouch have been served on the following persons this 15th day of August, 2011, by Electronic Information Exchange:

Atomic Safety and Licensing Board Panel U.S. Nuclear Regulatory Commission Office of the Secretary Mail Stop: T-3F23 Rulemaking and Adjudications Staff Washington, DC 20555-0001 U.S. Nuclear Regulatory Commission Lawrence G. McDade, Chair Mail Stop: O-16C1 Administrative Judge Washington, DC 20555-0001 E-mail: lgm1@nrc.gov Hearing Docket Paul B. Abramson E-mail: hearingdocket@nrc.gov Administrative Judge E-mail: pba@nrc.gov Office of the General Counsel Gary S. Arnold U.S. Nuclear Regulatory Commission Administrative Judge Mail Stop: O-15D21 E-mail: gxa1@nrc.gov Washington, DC 20555-0001 Wen Bu, Law Clerk Edward Williamson, Esq.

E-mail: wxb3@nrc.gov E-mail: elw2@nrc.gov David Roth, Esq.

Office of Commission Appellate E-mail: david.roth@nrc.gov Adjudication Andrea Jones, Esq.

U.S. Nuclear Regulatory Commission E-mail: andrea.jones@nrc.gov Mail Stop: O-16C1 Brian Newell, Paralegal Washington, DC 20555-0001 E-mail: bpn1@nrc.gov OCAA Mail Center OGC Mail Center E-mail: ocaamail@nrc.gov E-mail: OGCMailCenter@nrc.gov

Morgan, Lewis & Bockius LLP Diane Curran, Esq. 1111 Pennsylvania Avenue, N.W.

Representatives of Southern Alliance for Washington, D.C. 20004 Clean Energy (SACE) Co-counsel for Tennessee Valley Authority Harmon, Curran, Spielberg & Paul M. Bessette, Esq.

Eisenberg, L.L.P. E-mail: pbessette@morganlewis.com 1726 M Street NW, Suite 600 Kathryn M. Sutton, Esq.

Washington, DC 20036 E-mail: ksutton@morganlewis.com E-mail: dcurran@harmoncurran.com Signed (electronically) by

/s/ Christopher C. Chandler Christopher C. Chandler Office of the General Counsel Tennessee Valley Authority 400 W. Summit Hill Drive, WT 6A-K Knoxville, TN 37902-1401 Phone: (865) 632-7317 Fax: (865) 632-6147 E-mail: ccchandler0@tva.gov Counsel for TVA