ML17207A831: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 6: Line 6:
| number = ML17266A141
| number = ML17266A141
| issue date = 02/05/1980
| issue date = 02/05/1980
| title = Forwards LER 80-003/03L-0
| title = LER 80-003/03L-0:on 800106,during Normal Operations,Control Element Assembly 30 Reed Switch Indication Channel Failed, Eight Days After Repair for Same Problem.Cause Unknown;Will Be Investigated During Refueling Outage
| author name = Schoppman M
| author name = Schoppman M
| author affiliation = FLORIDA POWER & LIGHT CO.
| author affiliation = FLORIDA POWER & LIGHT CO.

Latest revision as of 11:34, 8 March 2020

Forwards LER 80-003/03L-0
Date released: 01/25/2018 Download: ML17207A831


LER 80-003/03L-0:on 800106,during Normal Operations,Control Element Assembly 30 Reed Switch Indication Channel Failed, Eight Days After Repair for Same Problem.Cause Unknown;Will Be Investigated During Refueling Outage
ML17266A141
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 02/05/1980
From: Schoppman M
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML17266A141 (3)
Forwards LER 80-003/03L-0
ML17207A830
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 02/05/1980
From: Schmidt A
FLORIDA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML17207A830 (2)