ML17285A158: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
Line 6: | Line 6: | ||
| number = ML17285A160 | | number = ML17285A160 | ||
| issue date = 12/21/1988 | | issue date = 12/21/1988 | ||
| title = | | title = Proposed Tech Spec Tables 3.3.3-1,3.3.3-2 & 4.3.3.1-1 Re ECCS Actuation Instrumentation,Clarifying Testing Requirements & Capabilities of Divs 1,2 & 3 Loss of Power Trip Functions,Per Approved Design | ||
| author name = | | author name = | ||
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM | | author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
Latest revision as of 20:35, 7 March 2020
Date released: 06/27/2018 | Download: ML17285A158 |
---|---|
ML17285A160 | |
Person / Time | |
---|---|
Site: | Columbia ![]() |
Issue date: | 12/21/1988 |
From: | WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
To: | |
References | |
Download: ML17285A160 (5) | |
ML17285A156 | |
Person / Time | |
---|---|
Site: | Columbia ![]() |
Issue date: | 12/21/1988 |
From: | Sorensen G WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
References | |
Download: ML17285A156 (20) | |