ML17285A158: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 6: Line 6:
| number = ML17285A160
| number = ML17285A160
| issue date = 12/21/1988
| issue date = 12/21/1988
| title = Application for Amend to License NPF-21,revising Tech Spec 3/4.3.3, ECCS Actuation..., Tables 3.3.3-1,3.3.3-2 & 4.3.3.1-1 to Clarify Testing Requirements & Capabilities Not Inherent in Approved Design.Affidavit Encl.Fee Paid
| title = Proposed Tech Spec Tables 3.3.3-1,3.3.3-2 & 4.3.3.1-1 Re ECCS Actuation Instrumentation,Clarifying Testing Requirements & Capabilities of Divs 1,2 & 3 Loss of Power Trip Functions,Per Approved Design
| author name =  
| author name =  
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Line 22: Line 22:
| issue date = 12/21/1988
| issue date = 12/21/1988
| title = Application for Amend to License NPF-21,revising Tech Spec 3/4.3.3, ECCS Actuation..., Tables 3.3.3-1,3.3.3-2 & 4.3.3.1-1 to Clarify Testing Requirements & Capabilities Not Inherent in Approved Design.Affidavit Encl.Fee Paid
| title = Application for Amend to License NPF-21,revising Tech Spec 3/4.3.3, ECCS Actuation..., Tables 3.3.3-1,3.3.3-2 & 4.3.3.1-1 to Clarify Testing Requirements & Capabilities Not Inherent in Approved Design.Affidavit Encl.Fee Paid
| author name = SORENSEN G C
| author name = Sorensen G
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
| addressee name =  
| addressee name =  

Latest revision as of 20:35, 7 March 2020

Application for Amend to License NPF-21,revising Tech Spec 3/4.3.3, ECCS Actuation..., Tables 3.3.3-1,3.3.3-2 & 4.3.3.1-1 to Clarify Testing Requirements & Capabilities Not Inherent in Approved Design.Affidavit Encl.Fee Paid
Date released: 06/27/2018 Download: ML17285A158


Proposed Tech Spec Tables 3.3.3-1,3.3.3-2 & 4.3.3.1-1 Re ECCS Actuation Instrumentation,Clarifying Testing Requirements & Capabilities of Divs 1,2 & 3 Loss of Power Trip Functions,Per Approved Design
ML17285A160
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 12/21/1988
From:
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
References
Download: ML17285A160 (5)
Application for Amend to License NPF-21,revising Tech Spec 3/4.3.3, ECCS Actuation..., Tables 3.3.3-1,3.3.3-2 & 4.3.3.1-1 to Clarify Testing Requirements & Capabilities Not Inherent in Approved Design.Affidavit Encl.Fee Paid
ML17285A156
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 12/21/1988
From: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
Download: ML17285A156 (20)