ML17317A928: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 6: Line 6:
| number = ML17317A930
| number = ML17317A930
| issue date = 02/09/1979
| issue date = 02/09/1979
| title = Forwards LER 79-001/03L-0
| title = LER 79-001/03L-0 on 790122:during Mode 1,position of Rod F-6 Showed Deviation of Greater than 12 Steps from Demand Position.Caused by Drift in Signal Conditioning Module
| author name = Beilman T
| author name = Beilman T
| author affiliation = INDIANA MICHIGAN POWER CO.
| author affiliation = INDIANA MICHIGAN POWER CO.

Latest revision as of 10:05, 7 March 2020

Forwards LER 79-001/03L-0
Date released: 05/31/2018 Download: ML17317A928


LER 79-001/03L-0 on 790122:during Mode 1,position of Rod F-6 Showed Deviation of Greater than 12 Steps from Demand Position.Caused by Drift in Signal Conditioning Module
ML17317A930
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 02/09/1979
From: Beilman T
INDIANA MICHIGAN POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML17317A930 (2)
Forwards LER 79-001/03L-0
ML17317A927
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 02/09/1979
From: Shaller D
INDIANA MICHIGAN POWER CO.
To: KEPPLER J G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML17317A927 (2)