ML18024B086: Difference between revisions

From kanterella
Jump to navigation Jump to search
Created page by program invented by StriderTol
 
StriderTol Bot change
 
(One intermediate revision by the same user not shown)
Line 6: Line 6:
| number = ML18024B088
| number = ML18024B088
| issue date = 11/07/1979
| issue date = 11/07/1979
| title = Forwards LER 79-010/03L-1
| title = LER 79-010/03L-1:on 790723,setpoint for Pressure Switch 68-96,switch 1,reactor Low Pressure,Found Set Above Tech Spec Limit.Caused by Instrument Drift.Switch Readjusted to Proper Setpoint
| author name =  
| author name =  
| author affiliation = TENNESSEE VALLEY AUTHORITY
| author affiliation = TENNESSEE VALLEY AUTHORITY
Line 22: Line 22:
| issue date = 11/07/1979
| issue date = 11/07/1979
| title = Forwards LER 79-010/03L-1
| title = Forwards LER 79-010/03L-1
| author name = CALHOUN J R
| author name = Calhoun J
| author affiliation = TENNESSEE VALLEY AUTHORITY
| author affiliation = TENNESSEE VALLEY AUTHORITY
| addressee name = OREILLY J P
| addressee name = OREILLY J P

Latest revision as of 11:56, 6 March 2020

Forwards LER 79-010/03L-1
Date released: 09/27/2018 Download: ML18024B086


LER 79-010/03L-1:on 790723,setpoint for Pressure Switch 68-96,switch 1,reactor Low Pressure,Found Set Above Tech Spec Limit.Caused by Instrument Drift.Switch Readjusted to Proper Setpoint
ML18024B088
Person / Time
Site: Browns Ferry 
Issue date: 11/07/1979
From:
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML18024B088 (2)
Forwards LER 79-010/03L-1
ML18024B085
Person / Time
Site: Browns Ferry 
Issue date: 11/07/1979
From: Calhoun J
TENNESSEE VALLEY AUTHORITY
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML18024B085 (2)