ML18043A317: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
Line 6: | Line 6: | ||
| number = ML18043A318 | | number = ML18043A318 | ||
| issue date = 12/06/1978 | | issue date = 12/06/1978 | ||
| title = | | title = LER#78-038/03L-0 on 781106:during Constr activities,2 Elec Penetration Fire Barriers Opened to Permit Cable Routing W/O Fire Tour Being Established.Caused by Failure of Contractor Personnel to Comply W/Plant Procedures | ||
| author name = | | author name = | ||
| author affiliation = CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.), | | author affiliation = CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.), |
Latest revision as of 04:56, 6 March 2020
Date released: 10/31/2018 | Download: ML18043A317 |
---|---|
ML18043A318 | |
Person / Time | |
---|---|
Site: | Palisades |
Issue date: | 12/06/1978 |
From: | CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
References | |
Download: ML18043A318 (1) | |
ML18043A316 | |
Person / Time | |
---|---|
Site: | Palisades |
Issue date: | 12/06/1978 |
From: | Hoffman D CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
To: | KEPPLER J G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
References | |
Download: ML18043A316 (2) | |