ML18051B459: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) Created page by program invented by StriderTol |
StriderTol (talk | contribs) StriderTol Bot change |
||
| (One intermediate revision by the same user not shown) | |||
| Line 6: | Line 6: | ||
| number = ML18051B460 | | number = ML18051B460 | ||
| issue date = 07/01/1985 | | issue date = 07/01/1985 | ||
| title = | | title = Rev 0 to Administrative Procedure 4.08, Post-Trip Review Requirements. | ||
| author name = | | author name = | ||
| author affiliation = CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.), | | author affiliation = CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.), | ||
| Line 22: | Line 22: | ||
| issue date = 07/01/1985 | | issue date = 07/01/1985 | ||
| title = Suppls 850219 Response to Generic Ltr 83-28,Issues 1.1 & 1.2 Re post-trip Review & Issue 4.5 Re Reactor Trip Sys Reliability | | title = Suppls 850219 Response to Generic Ltr 83-28,Issues 1.1 & 1.2 Re post-trip Review & Issue 4.5 Re Reactor Trip Sys Reliability | ||
| author name = | | author name = Kuemin J | ||
| author affiliation = CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.), | | author affiliation = CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.), | ||
| addressee name = | | addressee name = | ||
Latest revision as of 00:12, 6 March 2020
| Date released: 10/31/2018 | Download: ML18051B459 |
|---|---|
| ML18051B460 | |
| Person / Time | |
|---|---|
| Site: | Palisades |
| Issue date: | 07/01/1985 |
| From: | CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| To: | |
| References | |
| Download: ML18051B460 (51) | |
| ML18051B458 | |
| Person / Time | |
|---|---|
| Site: | Palisades |
| Issue date: | 07/01/1985 |
| From: | Kuemin J CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| To: | Office of Nuclear Reactor Regulation |
| References | |
| Download: ML18051B458 (6) | |