ML18058B743: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 6: Line 6:
| number = ML18058B744
| number = ML18058B744
| issue date = 03/29/1993
| issue date = 03/29/1993
| title = Application for Amend to License DPR-20,changing TS to Required Frequency for Surveillance Test Which Requires Moving Each Control Rod to Once Each 92 Days Instead of Once Every 2 Wks
| title = Proposed TS 4.2.2 Re Min Frequencies for Surveillance Test Which Requires Moving Each Control Rod
| author name =  
| author name =  
| author affiliation = CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.),
| author affiliation = CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.),

Latest revision as of 22:37, 5 March 2020

Application for Amend to License DPR-20,changing TS to Required Frequency for Surveillance Test Which Requires Moving Each Control Rod to Once Each 92 Days Instead of Once Every 2 Wks
Date released: 10/31/2018 Download: ML18058B743


Proposed TS 4.2.2 Re Min Frequencies for Surveillance Test Which Requires Moving Each Control Rod
ML18058B744
Person / Time
Site: Palisades Entergy icon.png
Issue date: 03/29/1993
From:
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
References
Download: ML18058B744 (13)
Application for Amend to License DPR-20,changing TS to Required Frequency for Surveillance Test Which Requires Moving Each Control Rod to Once Each 92 Days Instead of Once Every 2 Wks
ML18058B742
Person / Time
Site: Palisades Entergy icon.png
Issue date: 03/29/1993
From: Slade G
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
Download: ML18058B742 (11)