ML18064A503: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 6: Line 6:
| number = ML18064A504
| number = ML18064A504
| issue date = 12/07/1994
| issue date = 12/07/1994
| title = Forwards LER 94-019,Failure to Test Redundant Equipment Per TS 3.3.2.f Prior to Removal of Electrical Breakers from Svc for Planned Preventive Maintenance. LER Contains Four New Listed Commitments
| title = LER 94-019-00:on 941109,identified Failure to Test Redundant Equipment Per TS 3.3.2.f Prior Ro Removal of Electrical Breakers from Svc for Planned PM Due to Personnel Error. Administrative Procedure 5.14 Revised
| author name = Gire P
| author name = Gire P
| author affiliation = CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.),
| author affiliation = CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.),

Latest revision as of 21:49, 5 March 2020

Forwards LER 94-019,Failure to Test Redundant Equipment Per TS 3.3.2.f Prior to Removal of Electrical Breakers from Svc for Planned Preventive Maintenance. LER Contains Four New Listed Commitments
Date released: 10/31/2018 Download: ML18064A503


LER 94-019-00:on 941109,identified Failure to Test Redundant Equipment Per TS 3.3.2.f Prior Ro Removal of Electrical Breakers from Svc for Planned PM Due to Personnel Error. Administrative Procedure 5.14 Revised
ML18064A504
Person / Time
Site: Palisades Entergy icon.png
Issue date: 12/07/1994
From: Gire P
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
References
Download: ML18064A504 (5)
Forwards LER 94-019,Failure to Test Redundant Equipment Per TS 3.3.2.f Prior to Removal of Electrical Breakers from Svc for Planned Preventive Maintenance. LER Contains Four New Listed Commitments
ML18064A502
Person / Time
Site: Palisades Entergy icon.png
Issue date: 12/07/1994
From: Haas K
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
Download: ML18064A502 (2)