ML18064A503: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 6: Line 6:
| number = ML18064A504
| number = ML18064A504
| issue date = 12/07/1994
| issue date = 12/07/1994
| title = Forwards LER 94-019,Failure to Test Redundant Equipment Per TS 3.3.2.f Prior to Removal of Electrical Breakers from Svc for Planned Preventive Maintenance. LER Contains Four New Listed Commitments
| title = LER 94-019-00:on 941109,identified Failure to Test Redundant Equipment Per TS 3.3.2.f Prior Ro Removal of Electrical Breakers from Svc for Planned PM Due to Personnel Error. Administrative Procedure 5.14 Revised
| author name = GIRE P J
| author name = Gire P
| author affiliation = CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.),
| author affiliation = CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.),
| addressee name =  
| addressee name =  
Line 22: Line 22:
| issue date = 12/07/1994
| issue date = 12/07/1994
| title = Forwards LER 94-019,Failure to Test Redundant Equipment Per TS 3.3.2.f Prior to Removal of Electrical Breakers from Svc for Planned Preventive Maintenance. LER Contains Four New Listed Commitments
| title = Forwards LER 94-019,Failure to Test Redundant Equipment Per TS 3.3.2.f Prior to Removal of Electrical Breakers from Svc for Planned Preventive Maintenance. LER Contains Four New Listed Commitments
| author name = HAAS K M
| author name = Haas K
| author affiliation = CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.),
| author affiliation = CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.),
| addressee name =  
| addressee name =  

Latest revision as of 21:49, 5 March 2020

Forwards LER 94-019,Failure to Test Redundant Equipment Per TS 3.3.2.f Prior to Removal of Electrical Breakers from Svc for Planned Preventive Maintenance. LER Contains Four New Listed Commitments
Date released: 10/31/2018 Download: ML18064A503


LER 94-019-00:on 941109,identified Failure to Test Redundant Equipment Per TS 3.3.2.f Prior Ro Removal of Electrical Breakers from Svc for Planned PM Due to Personnel Error. Administrative Procedure 5.14 Revised
ML18064A504
Person / Time
Site: Palisades Entergy icon.png
Issue date: 12/07/1994
From: Gire P
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
References
Download: ML18064A504 (5)
Forwards LER 94-019,Failure to Test Redundant Equipment Per TS 3.3.2.f Prior to Removal of Electrical Breakers from Svc for Planned Preventive Maintenance. LER Contains Four New Listed Commitments
ML18064A502
Person / Time
Site: Palisades Entergy icon.png
Issue date: 12/07/1994
From: Haas K
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
Download: ML18064A502 (2)