ENS 53745: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 20: Line 20:
This event is being reported in accordance with 10 CFR 50.72(b)(3)(iv)(A) as an event that results in a valid actuation of the Emergency AC Electrical Power System (Emergency Diesel Generator) and Auxiliary Feedwater System (Motor Driven Auxiliary Feedwater Pump).
This event is being reported in accordance with 10 CFR 50.72(b)(3)(iv)(A) as an event that results in a valid actuation of the Emergency AC Electrical Power System (Emergency Diesel Generator) and Auxiliary Feedwater System (Motor Driven Auxiliary Feedwater Pump).
There was no impact on the health and safety of the public or plant personnel.
There was no impact on the health and safety of the public or plant personnel.
The NRC Resident Inspector has been notified."
The NRC Resident Inspector has been notified.
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2018/20181120en.html#en53745
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2018/20181120en.html#en53745
}}{{unit info
}}{{unit info

Latest revision as of 23:58, 23 February 2020

ENS 53745 +/-
Where
Robinson Duke Energy icon.png
South Carolina (NRC Region 2)
Reporting
10 CFR 50.72(b)(3)(iv)(A), System Actuation
Time - Person (Reporting Time:+18.07 h0.753 days <br />0.108 weeks <br />0.0248 months <br />)
Opened: Nick Roh
23:04 Nov 19, 2018
NRC Officer: Ossy Font
Last Updated: Nov 19, 2018
53745 - NRC Website
Loading map...