ENS 54318: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
Line 19: Line 19:
| event text = At 1023 EDT, on October 9, 2019, with Unit 2 in Mode 1 and 100 percent power, an actuation of the Emergency Diesel Generator and Auxiliary Feedwater Systems occurred. The reason for the Emergency Diesel Generator auto-start was the loss of power to the 4160V 1E electrical bus 2AA02 due to a fault at an offsite electrical switchyard. The Emergency Diesel Generator started and energized the 4160V safety bus, and Auxiliary Feedwater Systems automatically started as designed when the undervoltage condition on the safety bus was detected.  
| event text = At 1023 EDT, on October 9, 2019, with Unit 2 in Mode 1 and 100 percent power, an actuation of the Emergency Diesel Generator and Auxiliary Feedwater Systems occurred. The reason for the Emergency Diesel Generator auto-start was the loss of power to the 4160V 1E electrical bus 2AA02 due to a fault at an offsite electrical switchyard. The Emergency Diesel Generator started and energized the 4160V safety bus, and Auxiliary Feedwater Systems automatically started as designed when the undervoltage condition on the safety bus was detected.  
This event is being reported in accordance with 10 CFR 50.72(b)(3)(iv)(A) as an event that results in a valid actuation of the Emergency Diesel Generator and Auxiliary Feedwater Systems.  
This event is being reported in accordance with 10 CFR 50.72(b)(3)(iv)(A) as an event that results in a valid actuation of the Emergency Diesel Generator and Auxiliary Feedwater Systems.  
There was no impact on the health and safety of the public or plant personnel. The NRC resident has been notified."
There was no impact on the health and safety of the public or plant personnel. The NRC resident has been notified.
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2019/20191010en.html#en54318
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2019/20191010en.html#en54318
}}{{unit info
}}{{unit info

Latest revision as of 00:41, 24 February 2020

ENS 54318 +/-
Where
Vogtle Southern Nuclear icon.png
Georgia (NRC Region 2)
Reporting
10 CFR 50.72(b)(3)(iv)(A), System Actuation
Time - Person (Reporting Time:+-1.58 h-0.0658 days <br />-0.0094 weeks <br />-0.00216 months <br />)
Opened: Kristina Nichols
12:48 Oct 9, 2019
NRC Officer: Kerby Scales
Last Updated: Oct 9, 2019
54318 - NRC Website
Loading map...