ML12091A026: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| (3 intermediate revisions by the same user not shown) | |||
| Line 2: | Line 2: | ||
| number = ML12091A026 | | number = ML12091A026 | ||
| issue date = 03/31/2012 | | issue date = 03/31/2012 | ||
| title = Letter to | | title = Letter to ASLB, in the Matter of Entergy Nuclear Operations, Inc. (Indian Point Nuclear Generating Unit Nos. 2 and 3) Docket Nos. 50-247-LR/286-LR | ||
| author name = Turk S | | author name = Turk S | ||
| author affiliation = NRC/OGC | | author affiliation = NRC/OGC | ||
| addressee name = Lathrop K | | addressee name = Lathrop K, Mcdade L, Warwell R | ||
| addressee affiliation = NRC/ASLBP | | addressee affiliation = NRC/ASLBP | ||
| docket = 05000247, 05000286 | | docket = 05000247, 05000286 | ||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON. | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON. D.C. 20555-0001 March 31,2012 (1 :00 AM) | ||
D.C. 20555-0001 March 31,2012 (1 :00 AM) Lawrence G. McDade, Chair Dr. Kaye D. Lathrop Administrative Judge Administrative Judge Atomic Safety and Licensing Board Atomic Safety and Licensing Board U.S. Nuclear Regulatory Commission 190 Cedar Lane E. Mail Stop: T -3 F23 Ridgway, CO 81432 Washington, D.C. 20555 Dr. Richard E. Wardwell Administrative Judge Atomic Safety and Licensing Board U.S. Nuclear Regulatory Commission Mail Stop: T-3 F23 Washington, D.C. 20555 | Lawrence G. McDade, Chair Dr. Kaye D. Lathrop Administrative Judge Administrative Judge Atomic Safety and Licensing Board Atomic Safety and Licensing Board U.S. Nuclear Regulatory Commission 190 Cedar Lane E. | ||
Dear Administrative Judges: I am writing to inform you that, in accordance with the Atomic Safety and licensing Board's Order of February 16, 2012, on Thursday and Friday (March 29-30, 2012). | Mail Stop: T -3 F23 Ridgway, CO 81432 Washington, D.C. 20555 Dr. Richard E. Wardwell Administrative Judge Atomic Safety and Licensing Board U.S. Nuclear Regulatory Commission Mail Stop: T-3 F23 Washington, D.C. 20555 In the Matter of ENTERGY NUCLEAR OPERATIONS, INC. | ||
the NRC Staff ("Staff') | (Indian Point Nuclear Generating Unit Nos. 2 and 3) | ||
filed its statements of position, prefiled written testimony, and evidentiary exhibits on nine of the 11 contentions scheduled for hearing in this proceeding. | Docket Nos. 50-247-LRl286-LR | ||
Due to last minute difficulties, as of 12:00 AM this morning, the Staff had not yet submitted some or all of its evidentiary filings on Contentions NYS-26B (Metal Fatigue) and RK-TC-2 (Flow Accelerated Corrosion). | |||
1 The Staff is finalizing its evidentiary presentations on those two contentions at this time, and expects to file those documents within the next two hours. A complete list of the Staff's exhibits (designated Exhibit NRC000001) will be filed when those submissions are complete. | ==Dear Administrative Judges:== | ||
I would like to bring two other matters to your attention. | |||
First, while the Staff has sought to comply, to the greatest extent possible, with the Board's directive that duplicative filings should be avoided, some of the Staff's exhibits may duplicate the submittals of other parties 1 It is possible, as well, that some of the Staff's filings on Contention NYS-37 (No Action Alternative) did not pass through the EIE portal until shortly after midnight. | I am writing to inform you that, in accordance with the Atomic Safety and licensing Board's Order of February 16, 2012, on Thursday and Friday (March 29-30, 2012). the NRC Staff | ||
Judge McDade March 31, 2012 Judge Lathrop Judge Wardwell particularly since the Staff and Entergy Nuclear Operations, Inc. ("Entergy") | ("Staff') filed its statements of position, prefiled written testimony, and evidentiary exhibits on nine of the 11 contentions scheduled for hearing in this proceeding. Due to last minute difficulties, as of 12:00 AM this morning, the Staff had not yet submitted some or all of its evidentiary filings on Contentions NYS-26B (Metal Fatigue) and RK-TC-2 (Flow Accelerated Corrosion). 1 The Staff is finalizing its evidentiary presentations on those two contentions at this time, and expects to file those documents within the next two hours. A complete list of the Staff's exhibits (designated Exhibit NRC000001) will be filed when those submissions are complete. | ||
have been filing their evidentiary presentations on the same schedule. | I would like to bring two other matters to your attention. First, while the Staff has sought to comply, to the greatest extent possible, with the Board's directive that duplicative filings should be avoided, some of the Staff's exhibits may duplicate the submittals of other parties 1 It is possible, as well, that some of the Staff's filings on Contention NYS-37 (No Action Alternative) did not pass through the EIE portal until shortly after midnight. | ||
Second, to avoid duplication, the Staff is not filing certain documents that it would otherwise be required to file under 10 C.F.R. § 2.337(g)(2) | |||
-specifically, the GElS, the DSEIS, the FSEIS, and the ACRS letter, as well as the SER and SER Supplement | Judge McDade March 31, 2012 Judge Lathrop Judge Wardwell particularly since the Staff and Entergy Nuclear Operations, Inc. ("Entergy") have been filing their evidentiary presentations on the same schedule. | ||
Second, to avoid duplication, the Staff is not filing certain documents that it would otherwise be required to file under 10 C.F.R. § 2.337(g)(2) - specifically, the GElS, the DSEIS, the FSEIS, and the ACRS letter, as well as the SER and SER Supplement 1. To meet the requirements of | |||
Each of those exhibits consists of a single page, in which the Staff incorporates the other party's parallel exhibit. For example, Exhibit NRC000002 (the GElS) is a one-page document that cites and incorporates Exhibit NYS000131A-1 (the GElS). Out of an abundance of caution, the Staff has similarly treated its principal review documents | § 2.337(g)(2), the Staff has assigned each of those documents a unique NRC Staff exhibit number (e.g., the GElS is assigned exhibit 1\10. NRC000002). Each of those exhibits consists of a single page, in which the Staff incorporates the other party's parallel exhibit. For example, Exhibit NRC000002 (the GElS) is a one-page document that cites and incorporates Exhibit NYS000131A-1 (the GElS). Out of an abundance of caution, the Staff has similarly treated its principal review documents - i.e., the GALL Report (Revisions 1 and 2), the SRP-LR, the ESRP and ESRP Supp. 1, and Regulatory Guide (RG) 4.2 and Supplement 1 thereto, to assure that those documents are received into evidence. Those one-page exhibits (13 in all) are being filed herewith (Exhibits NRC000002 through t\lRC000014). | ||
-i.e., the GALL Report (Revisions 1 and 2), the SRP-LR, the ESRP and ESRP Supp. 1, and Regulatory Guide (RG) 4.2 and Supplement 1 thereto, to assure that those documents are received into evidence. | |||
Those one-page exhibits (13 in all) are being filed herewith (Exhibits NRC000002 through t\lRC000014). | |||
The Staff is amenable to discussing with the Board and parties the means by which thee or any other duplicative exhibits may be eliminated. | The Staff is amenable to discussing with the Board and parties the means by which thee or any other duplicative exhibits may be eliminated. | ||
Sincerely, - | Sincerely, ffiyW~-J~ | ||
Sherwin E. Turk Counsel for NRC Staff | Sherwin E. Turk Counsel for NRC Staff | ||
==Enclosures:== | ==Enclosures:== | ||
As stated Cc w/Encls: Service List}} | As stated Cc w/Encls: Service List}} | ||
Latest revision as of 16:32, 6 February 2020
| ML12091A026 | |
| Person / Time | |
|---|---|
| Site: | Indian Point |
| Issue date: | 03/31/2012 |
| From: | Sherwin Turk NRC/OGC |
| To: | Lathrop K, Lawrence Mcdade, Warwell R Atomic Safety and Licensing Board Panel |
| SECY RAS | |
| Shared Package | |
| ML12091A016 | List: |
| References | |
| RAS 22172, 50-247-LR, 50-286-LR, ASLBP 07-858-03-LR-BD01 | |
| Download: ML12091A026 (2) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON. D.C. 20555-0001 March 31,2012 (1 :00 AM)
Lawrence G. McDade, Chair Dr. Kaye D. Lathrop Administrative Judge Administrative Judge Atomic Safety and Licensing Board Atomic Safety and Licensing Board U.S. Nuclear Regulatory Commission 190 Cedar Lane E.
Mail Stop: T -3 F23 Ridgway, CO 81432 Washington, D.C. 20555 Dr. Richard E. Wardwell Administrative Judge Atomic Safety and Licensing Board U.S. Nuclear Regulatory Commission Mail Stop: T-3 F23 Washington, D.C. 20555 In the Matter of ENTERGY NUCLEAR OPERATIONS, INC.
(Indian Point Nuclear Generating Unit Nos. 2 and 3)
Docket Nos. 50-247-LRl286-LR
Dear Administrative Judges:
I am writing to inform you that, in accordance with the Atomic Safety and licensing Board's Order of February 16, 2012, on Thursday and Friday (March 29-30, 2012). the NRC Staff
("Staff') filed its statements of position, prefiled written testimony, and evidentiary exhibits on nine of the 11 contentions scheduled for hearing in this proceeding. Due to last minute difficulties, as of 12:00 AM this morning, the Staff had not yet submitted some or all of its evidentiary filings on Contentions NYS-26B (Metal Fatigue) and RK-TC-2 (Flow Accelerated Corrosion). 1 The Staff is finalizing its evidentiary presentations on those two contentions at this time, and expects to file those documents within the next two hours. A complete list of the Staff's exhibits (designated Exhibit NRC000001) will be filed when those submissions are complete.
I would like to bring two other matters to your attention. First, while the Staff has sought to comply, to the greatest extent possible, with the Board's directive that duplicative filings should be avoided, some of the Staff's exhibits may duplicate the submittals of other parties 1 It is possible, as well, that some of the Staff's filings on Contention NYS-37 (No Action Alternative) did not pass through the EIE portal until shortly after midnight.
Judge McDade March 31, 2012 Judge Lathrop Judge Wardwell particularly since the Staff and Entergy Nuclear Operations, Inc. ("Entergy") have been filing their evidentiary presentations on the same schedule.
Second, to avoid duplication, the Staff is not filing certain documents that it would otherwise be required to file under 10 C.F.R. § 2.337(g)(2) - specifically, the GElS, the DSEIS, the FSEIS, and the ACRS letter, as well as the SER and SER Supplement 1. To meet the requirements of
§ 2.337(g)(2), the Staff has assigned each of those documents a unique NRC Staff exhibit number (e.g., the GElS is assigned exhibit 1\10. NRC000002). Each of those exhibits consists of a single page, in which the Staff incorporates the other party's parallel exhibit. For example, Exhibit NRC000002 (the GElS) is a one-page document that cites and incorporates Exhibit NYS000131A-1 (the GElS). Out of an abundance of caution, the Staff has similarly treated its principal review documents - i.e., the GALL Report (Revisions 1 and 2), the SRP-LR, the ESRP and ESRP Supp. 1, and Regulatory Guide (RG) 4.2 and Supplement 1 thereto, to assure that those documents are received into evidence. Those one-page exhibits (13 in all) are being filed herewith (Exhibits NRC000002 through t\lRC000014).
The Staff is amenable to discussing with the Board and parties the means by which thee or any other duplicative exhibits may be eliminated.
Sincerely, ffiyW~-J~
Sherwin E. Turk Counsel for NRC Staff
Enclosures:
As stated Cc w/Encls: Service List