ULNRC-06199, Nuclear Property Insurance Reporting: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:~~ | {{#Wiki_filter:~~ | ||
'iiWAmeren Callaway Plant MISSOURI | 'iiWAmeren Callaway Plant MISSOURI March 18, 2014 ULNRC-06199 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 10 CFR 50.54(w)(3) | ||
March 18, 2014 ULNRC-06199 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 10 CFR 50.54(w)(3) | |||
Ladies and Gentlemen: | Ladies and Gentlemen: | ||
DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 UNION ELECTRIC CO. | DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 UNION ELECTRIC CO. | ||
| Line 28: | Line 25: | ||
Sincerely, | Sincerely, | ||
~~~M~li~y Regulatory Affairs Manager DRB/nls Enclosure | ~~~M~li~y Regulatory Affairs Manager DRB/nls Enclosure | ||
************************************************************************************************************************** PO Box 620 Fulton, MO 65251 AmerenMissouri.com .............. | ************************************************************************************************************************** PO Box 620 Fulton, MO 65251 AmerenMissouri.com .............. | ||
STARS | STARS | ||
* Alliance | * Alliance | ||
Revision as of 13:34, 5 February 2020
| ML15077A165 | |
| Person / Time | |
|---|---|
| Site: | Callaway |
| Issue date: | 03/18/2015 |
| From: | Maglio S Ameren Missouri, Union Electric Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| ULNRC-06199 | |
| Download: ML15077A165 (5) | |
Text
~~
'iiWAmeren Callaway Plant MISSOURI March 18, 2014 ULNRC-06199 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 10 CFR 50.54(w)(3)
Ladies and Gentlemen:
DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 UNION ELECTRIC CO.
FACILITY OPERATING LICENSE NPF-30 NUCLEAR PROPERTY INSURANCE REPORTING In accordance with the nuclear property insurance reporting requirements of 10 CFR 50.54(w)(3), the attached report provides the present level of insurance and the sources of insurance that are applicable to the Callaway Plant.
This letter does not contain new commitments.
If there are any questions concerning this letter, contact Scott Maglio at 573-676-8719.
Sincerely,
~~~M~li~y Regulatory Affairs Manager DRB/nls Enclosure
- PO Box 620 Fulton, MO 65251 AmerenMissouri.com ..............
STARS
- Alliance
ULNRC-06199 March 18, 2015 Page2 cc: Mr. Marc L. Dapas Regional Administrator U.S. Nuclear Regulatory Commission Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. Fred Lyon Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 0-8B 1 Washington, DC 20555-2738
ULNRC-06199 March 18, 2015 Page 3 Index and send hardcopy to QA File A160.0761 Hardcopy:
Certrec Corporation 4150 International Plaza Suite 820 Fort Worth, TX 76109 (Certrec receives ALL attachments as long as they are non-safeguards and may be publicly disclosed.)
Electronic distribution for the following can be made via Responses and Reports ULNRC Distribution:
F. M. Diya D. W. Neterer L. H. Graessle T. E. Herrmann B.L.Cox S. A. Maglio T. B. Elwood Corporate Communications NSRB Secretary Mr. Greg Voss, REP Manager (SEMA)
STARS Regulatory Affairs Mr. John O'Neill (Pillsbury Winthrop Shaw Pittman LLP)
Ms. Leanne Tippett-Mosby (DNR)
March 16, 2015 Mr. T. B. Elwood:
Re: Nuclear Property Insurance NRC Property Rule I 0 CFR 50.54 (W)
Reporting Requirements The subject NRC reporting requirement stipulates that on April I, of each year, the licensee for each commercial nuclear reactor site provide to the NRC a description of the nuclear property insurance in force.
Attached is a schedule I have prepared for the current year's filing. I understand that all correspondence to the NRC is to be logged via your established numbering system and distribution of copies made according to your established procedure. Accordingly, please file the original at the appropriate time and make the necessary distribution of copies.
fY}o.JL ~-.~
lMark E. Blair MEB/bjl Attachment cc with attachment:
D. R. Brownawell
UNION ELECTRIC COMPANY - CALLAWAY PLANT NUCLEAR PROPERTY INSURANCE - April1, 2015 10 CFR 50.54(W) REPORTING REQUIREMENTS In accordance with established federal nuclear property insurance reporting requirements [1 0 CFR 50.54(W)], this is to advise that on April 1, 2015, Union Electric Company will have in force the below listed coverages which are applicable to its Callaway Nuclear Plant.
Non Nuclear Nuclear Events Events
- l. Primary Nuclear Property Insurance
- a. Nuclear Electric Insurance, Ltd. $1,500,000,000 $1,500,000,000
- 2. Excess Nuclear Property Insurance
- a. Nuclear Electric Insurance, Ltd. 1,250,000,000
- b. NEIL Specialty Insurance Co. 750,000,000
- c. European Mutual Association for Nuclear Insurance 500,000,000 500,000,000 Grand Total $3,250,000,000 $2,7 50,000,000 P71U/G ~, ~Cb;_
~ark E. Blair Director - Risk Management MEB/bjl