ML18162A043: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:AGENDA ADVISORY COMMITTEE ON REACTOR SAFEGUARDS FUTURE PLANT DESIGNS SUBCOMMITTEE
{{#Wiki_filter:AGENDA ADVISORY COMMITTEE ON REACTOR SAFEGUARDS FUTURE PLANT DESIGNS SUBCOMMITTEE Introduction to Industry Guidance, Modernization of Technical Requirements for Licensing of Advanced NonLight Water Reactors.
----------------------------------------------------------------
ROCKVILLE, MARYLAND June 19, 2018 Cognizant Staff Engineer/DFO: Derek A. Widmayer                           Email: derek.widmayer@nrc.gov Phone #: (301) 415-5375 June 19, 2018 Topic                                           Presenter(s)           Time
Introduction to Industry Guidance, "Modernization of Technical Requirements for Licensing of Advanced Non
: 1. Opening Remarks                                                     Mr. Dennis Bley, ACRS     8:30 - 8:35 AM
-Light Water Reactors
: 2. Staff Introduction                                                 John Segala, NRO           8:35 - 8:40 AM Draft Guidance Paper - Modernization of Technical Requirements for Licensing of Advanced NonLight Water Reactors
."    ---------------------------------------------------------------
* Background                                              George Apostolakis/
ROCKVILLE, MARYLAND June 19, 2018 Cognizant Staff Engineer/DFO: Derek A. Widmayer Email: derek.widmayer@nrc.gov Phone #: (301) 415
: 3.
-5375 June 19, 2018 Topic Presenter(s)
* Guidance Development                                     Karl Fleming, Licensing   8:40-10:15 AM o    Selection of LBEs                                Modernization Project o    PRA Approach o    SSC Classification Break                                                                                         10:15-10:30 AM Draft Guidance Paper (cont.)
Time 1. Opening Remarks Mr. Dennis Bley, ACRS 8:30 - 8:35 AM 2. Staff Introduction John Segala, NRO 8:35 - 8:4 0 AM 3. Draft Guidance Paper
* Guidance Development (cont.)                             George Apostolakis/       10:30-11:00 AM 4.
- Modernization of Technical Requirements for Licensing of Advanced Non
o    Evaluation of Defense-in-Depth                    Karl Fleming Staff Review of Draft Guidance
-Light Water Reactors
: 5.
 
* Staff Comments / Suggested Improvements                 Bill Reckley, NRO         11:00-11:45 AM
===Background===
* Next Steps
Guidance Development o Selection of LBEs o PRA Approach o SSC Classification George Apostolakis
: 6. Subcommittee Discussion                                             Mr. Dennis Bley, ACRS   11:45 AM - Noon Adjourn                                                                                           Noon Notes:
/ Karl Fleming, Licensing Modernization Project 8:40-10:15 AM Break 10:15-10:30 AM 4. Draft Guidance Paper (cont.) Guidance Development (cont.)
* During the meeting, Telephone No. 301-415-7360 should be used to contact anyone in the ACRS Office.
o Evaluation of Defense
* Presentation time should not exceed 50 percent of the total time allocated for a given item. The remaining 50 percent of the time is reserved for discussion.
-in-Depth  George Apostolakis
* Thirty five (35) hard copies of each presentation or handout should be provided to the Designated Federal Official 30 minutes before the meeting.
/ Karl Fleming 10:30-11:00 AM 5. Staff Review of Draft Guidance Staff Comments  
* One (1) electronic copy of each presentation should be emailed to the Designated Federal Official 1 day before the meeting. If an electronic copy cannot be provided within this timeframe, presenters should provide the Designated Federal Official with a CD containing each presentation at least 30 minutes before the meeting.}}
/ Suggested Improvements Next Steps Bill Reckley, NRO 11:00-11: 45 AM 6. Subcommittee Discussion Mr. Dennis Bley, ACRS 11: 45 AM - Noon Adjourn Noon Notes:   During the meeting, Telephone No. 301
-415-7360 should be used to contact anyone in the ACRS Office. Presentation time should not exceed 50 percent of the total time allocated for a given item. The remaining 50 percent of the time is reserved for discussion.
Thirty five (35) hard copies of each presentation or handout should be provided to the Designated Federal Official 30 minutes before the meeting.
One (1) electronic copy of each presentation should be emailed to the Designated Federal Official 1 day before the meeting. If an electronic copy cannot be provided within this timeframe, presenters should provide the Designated Federal Official with a CD containing each presentation at least 30 minutes before the meeting.}}

Latest revision as of 22:16, 2 February 2020

Agenda - ACRS Future Plant Designs Subcommittee Meeting - June 19, 2018
ML18162A043
Person / Time
Issue date: 06/19/2018
From: Derek Widmayer
Advisory Committee on Reactor Safeguards
To:
Widmayer D
References
Download: ML18162A043 (1)


Text

AGENDA ADVISORY COMMITTEE ON REACTOR SAFEGUARDS FUTURE PLANT DESIGNS SUBCOMMITTEE Introduction to Industry Guidance, Modernization of Technical Requirements for Licensing of Advanced NonLight Water Reactors.

ROCKVILLE, MARYLAND June 19, 2018 Cognizant Staff Engineer/DFO: Derek A. Widmayer Email: derek.widmayer@nrc.gov Phone #: (301) 415-5375 June 19, 2018 Topic Presenter(s) Time

1. Opening Remarks Mr. Dennis Bley, ACRS 8:30 - 8:35 AM
2. Staff Introduction John Segala, NRO 8:35 - 8:40 AM Draft Guidance Paper - Modernization of Technical Requirements for Licensing of Advanced NonLight Water Reactors
  • Background George Apostolakis/
3.
  • Guidance Development Karl Fleming, Licensing 8:40-10:15 AM o Selection of LBEs Modernization Project o PRA Approach o SSC Classification Break 10:15-10:30 AM Draft Guidance Paper (cont.)
  • Guidance Development (cont.) George Apostolakis/ 10:30-11:00 AM 4.

o Evaluation of Defense-in-Depth Karl Fleming Staff Review of Draft Guidance

5.
  • Staff Comments / Suggested Improvements Bill Reckley, NRO 11:00-11:45 AM
  • Next Steps
6. Subcommittee Discussion Mr. Dennis Bley, ACRS 11:45 AM - Noon Adjourn Noon Notes:
  • During the meeting, Telephone No. 301-415-7360 should be used to contact anyone in the ACRS Office.
  • Presentation time should not exceed 50 percent of the total time allocated for a given item. The remaining 50 percent of the time is reserved for discussion.
  • Thirty five (35) hard copies of each presentation or handout should be provided to the Designated Federal Official 30 minutes before the meeting.
  • One (1) electronic copy of each presentation should be emailed to the Designated Federal Official 1 day before the meeting. If an electronic copy cannot be provided within this timeframe, presenters should provide the Designated Federal Official with a CD containing each presentation at least 30 minutes before the meeting.