ML18113A837: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 6: | Line 6: | ||
| number = ML18113A838 | | number = ML18113A838 | ||
| issue date = 02/12/1979 | | issue date = 02/12/1979 | ||
| title = | | title = LER 79-002/03L-0 on 790115:electrical Penetration Between Turbine Bldg & Emergency Switchgear Room Not Properly Sealed.Caused by Penetration Being Broken During Previous Implementation of Design Change | ||
| author name = Stewart W | | author name = Stewart W | ||
| author affiliation = VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) | | author affiliation = VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) | ||
Latest revision as of 14:53, 25 January 2020
| Date released: 12/10/2018 | Download: ML18113A837 |
|---|---|
| ML18113A838 | |
| Person / Time | |
|---|---|
| Site: | Surry |
| Issue date: | 02/12/1979 |
| From: | Stewart W VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| Download: ML18113A838 (2) | |
| ML18113A836 | |
| Person / Time | |
|---|---|
| Site: | Surry |
| Issue date: | 02/13/1979 |
| From: | Stallings C VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
| To: | OREILLY J P NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| Download: ML18113A836 (1) | |