ML19209C629: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 6: Line 6:
| number = ML19209C635
| number = ML19209C635
| issue date = 10/10/1979
| issue date = 10/10/1979
| title = Forwards LERs 79-038/03L-0 & 79-039/03L-0
| title = LER 79-039/03L-0:on 790924,fuel Storage Pool Area Radiation Monitor Declared Inoperable Due to Reading Discrepancy. Caused by Instrument Drift.Monitor Recalibr & Returned to Svc on 790930
| author name = Hairston W
| author name = Hairston W
| author affiliation = ALABAMA POWER CO.
| author affiliation = ALABAMA POWER CO.
Line 21: Line 21:
| number = ML19209C633
| number = ML19209C633
| issue date = 10/10/1979
| issue date = 10/10/1979
| title = Forwards LERs 79-038/03L-0 & 79-039/03L-0
| title = LER 79-038/03L-0:on 790912,while Performing Surveillance Test FNP-1-STP-1.0,containment Gaseous Activity Purge & Exhaust Isolation Monitor Declared Inoperable.Caused by Monitor Bypass Valve Being in Open Position
| author name = Hairston W
| author name = Hairston W
| author affiliation = ALABAMA POWER CO.
| author affiliation = ALABAMA POWER CO.

Latest revision as of 06:13, 24 January 2020

Forwards LERs 79-038/03L-0 & 79-039/03L-0
Date released: 08/11/2019 Download: ML19209C629


LER 79-039/03L-0:on 790924,fuel Storage Pool Area Radiation Monitor Declared Inoperable Due to Reading Discrepancy. Caused by Instrument Drift.Monitor Recalibr & Returned to Svc on 790930
ML19209C635
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 10/10/1979
From: Hairston W
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19209C635 (1)
LER 79-038/03L-0:on 790912,while Performing Surveillance Test FNP-1-STP-1.0,containment Gaseous Activity Purge & Exhaust Isolation Monitor Declared Inoperable.Caused by Monitor Bypass Valve Being in Open Position
ML19209C633
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 10/10/1979
From: Hairston W
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19209C633 (1)
Forwards LERs 79-038/03L-0 & 79-039/03L-0
ML19209C628
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 10/10/1979
From: Clayton F
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19209C628 (1)