ML19225C277: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 6: Line 6:
| number = ML19225C279
| number = ML19225C279
| issue date = 07/18/1979
| issue date = 07/18/1979
| title = Forwards LER 79-062/01T-1
| title = LER 78-062/01T-1 on 781101:condensing Pots 2B21-D004A & B Not Installed Per Design,Resulting in 11.2 Inch Error in Calibr of 2B21-N017A-D Level Switches.Caused by Installation Design Error.Detail Drawings Corrected
| author name = Nix R
| author name = Nix R
| author affiliation = GEORGIA POWER CO.
| author affiliation = GEORGIA POWER CO.

Latest revision as of 23:49, 23 January 2020

Forwards LER 79-062/01T-1
Date released: 08/27/2019 Download: ML19225C277


LER 78-062/01T-1 on 781101:condensing Pots 2B21-D004A & B Not Installed Per Design,Resulting in 11.2 Inch Error in Calibr of 2B21-N017A-D Level Switches.Caused by Installation Design Error.Detail Drawings Corrected
ML19225C279
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 07/18/1979
From: Nix R
GEORGIA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19225C279 (1)
Forwards LER 79-062/01T-1
ML19225C276
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 07/18/1979
From: Manry M
GEORGIA POWER CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19225C276 (1)