ML19225C433: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 6: | Line 6: | ||
| number = ML19225C434 | | number = ML19225C434 | ||
| issue date = 07/25/1979 | | issue date = 07/25/1979 | ||
| title = | | title = LER 79-026/03L-0 on 790708:while Performing Surveillance Test 8.7.4.4,MSIV Timing,Msiv A-203-ID(inboard) Closed within 2.6-s.Caused by Leaking Nipple in Hydraulic Sys on Valve Operator.Leak Repaired & Hydraulic Sys Refilled | ||
| author name = Fulton J | | author name = Fulton J | ||
| author affiliation = BOSTON EDISON CO. | | author affiliation = BOSTON EDISON CO. |
Latest revision as of 00:49, 24 January 2020
Date released: 08/27/2019 | Download: ML19225C433 |
---|---|
ML19225C434 | |
Person / Time | |
---|---|
Site: | Pilgrim |
Issue date: | 07/25/1979 |
From: | Fulton J BOSTON EDISON CO. |
To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
References | |
Download: ML19225C434 (1) | |
ML19225C432 | |
Person / Time | |
---|---|
Site: | Pilgrim |
Issue date: | 07/24/1979 |
From: | Mcguire P BOSTON EDISON CO. |
To: | GRIER B H NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
References | |
Download: ML19225C432 (1) | |