ML19241B440: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 6: Line 6:
| number = ML19268A258
| number = ML19268A258
| issue date = 07/06/1979
| issue date = 07/06/1979
| title = Forwards LER 79-019/01T-0
| title = LER 79-019/01T-0 on 790621:during Seismic Support Insp Program, Reactor Core Isolation Cooling Piping Anchor Discovered to Have Two Bolts That Could Not Be Torqued. Caused by Improper Installation of Bolt Shells
| author name = Cooney M
| author name = Cooney M
| author affiliation = PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
| author affiliation = PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC

Latest revision as of 23:35, 23 January 2020

Forwards LER 79-019/01T-0
Date released: 10/09/2019 Download: ML19241B440


LER 79-019/01T-0 on 790621:during Seismic Support Insp Program, Reactor Core Isolation Cooling Piping Anchor Discovered to Have Two Bolts That Could Not Be Torqued. Caused by Improper Installation of Bolt Shells
ML19268A258
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 07/06/1979
From: Cooney M
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML19268A258 (1)
Forwards LER 79-019/01T-0
ML19241B439
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 07/06/1979
From: Cooney M
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: GRIER B H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML19241B439 (2)