ML19242D181: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 6: Line 6:
| number = ML19242D193
| number = ML19242D193
| issue date = 08/09/1979
| issue date = 08/09/1979
| title = Forwards LER 79-029/03L-0
| title = LER 79-029/03L-0 on 790713:penetration Room Filtration Sys Trains a & B Inoperable.Caused by Train B Exhaust Fan Not Starting & Train a Suction Damper Not Opening.Overload Reset & Fuse Replaced
| author name = Hairston W
| author name = Hairston W
| author affiliation = ALABAMA POWER CO.
| author affiliation = ALABAMA POWER CO.

Latest revision as of 22:55, 23 January 2020

Forwards LER 79-029/03L-0
Date released: 09/13/2019 Download: ML19242D181


LER 79-029/03L-0 on 790713:penetration Room Filtration Sys Trains a & B Inoperable.Caused by Train B Exhaust Fan Not Starting & Train a Suction Damper Not Opening.Overload Reset & Fuse Replaced
ML19242D193
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 08/09/1979
From: Hairston W
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19242D193 (3)
Forwards LER 79-029/03L-0
ML19242D180
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 08/09/1979
From: Clayton F
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19242D180 (1)