ML19242D360: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 6: | Line 6: | ||
| number = ML19242D362 | | number = ML19242D362 | ||
| issue date = 08/08/1979 | | issue date = 08/08/1979 | ||
| title = | | title = LER 79-075/03L-0 on 790716:computer Calculation Indicated Critical Mass Peaking Factor of 3.046 W/Limit of 2.38.Caused by Calibr Error.Control Rod Withdrawal Sequence Altered to Avoid Future Peaking Problems | ||
| author name = Coggin C | | author name = Coggin C | ||
| author affiliation = GEORGIA POWER CO. | | author affiliation = GEORGIA POWER CO. |
Latest revision as of 22:46, 23 January 2020
Date released: 09/13/2019 | Download: ML19242D360 |
---|---|
ML19242D362 | |
Person / Time | |
---|---|
Site: | Hatch |
Issue date: | 08/08/1979 |
From: | Coggin C GEORGIA POWER CO. |
To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
References | |
Download: ML19242D362 (2) | |
ML19242D359 | |
Person / Time | |
---|---|
Site: | Hatch |
Issue date: | 08/08/1979 |
From: | Manry M GEORGIA POWER CO. |
To: | OREILLY J P NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
References | |
Download: ML19242D359 (1) | |