ML19246B552: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 6: Line 6:
| number = ML19246B557
| number = ML19246B557
| issue date = 07/03/1979
| issue date = 07/03/1979
| title = Forwards LER 79-043/01T-0
| title = LER 79-043/01T-0 on 790628:radwaste Sump Discharge Piping Not Supported Per Class I Requirements.Caused by Design Error.Piping Supports Will Be Redesigned & Installed During Current Refueling Outage
| author name = Greene T
| author name = Greene T
| author affiliation = GEORGIA POWER CO.
| author affiliation = GEORGIA POWER CO.

Latest revision as of 22:25, 23 January 2020

Forwards LER 79-043/01T-0
Date released: 09/17/2019 Download: ML19246B552


LER 79-043/01T-0 on 790628:radwaste Sump Discharge Piping Not Supported Per Class I Requirements.Caused by Design Error.Piping Supports Will Be Redesigned & Installed During Current Refueling Outage
ML19246B557
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 07/03/1979
From: Thomas Greene
GEORGIA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19246B557 (3)
Forwards LER 79-043/01T-0
ML19246B551
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 07/03/1979
From: Manry M
GEORGIA POWER CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19246B551 (1)