ML19249E798: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 6: | Line 6: | ||
| number = ML19249E800 | | number = ML19249E800 | ||
| issue date = 09/26/1979 | | issue date = 09/26/1979 | ||
| title = | | title = LER 79-091/03L-0:on 790901,steam Generator 2 Low Level Trip Occurred on Steam & Feedwater Rupture Control Sys Channel 3.Caused by Inoperable Optical Isolator in Faulty Input Buffer Card.Board Was Replaced & New Buffer Card Installed | ||
| author name = Nelson J | | author name = Nelson J | ||
| author affiliation = TOLEDO EDISON CO. | | author affiliation = TOLEDO EDISON CO. |
Latest revision as of 19:57, 23 January 2020
Date released: 09/20/2019 | Download: ML19249E798 |
---|---|
ML19249E800 | |
Person / Time | |
---|---|
Site: | Davis Besse |
Issue date: | 09/26/1979 |
From: | Nelson J TOLEDO EDISON CO. |
To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
References | |
Download: ML19249E800 (2) | |
ML19249E797 | |
Person / Time | |
---|---|
Site: | Davis Besse |
Issue date: | 09/26/1979 |
From: | Murray T TOLEDO EDISON CO. |
To: | KEPPLER J G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
References | |
Download: ML19249E797 (1) | |