ML19253A404: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 6: | Line 6: | ||
| number = ML19253A409 | | number = ML19253A409 | ||
| issue date = 08/17/1979 | | issue date = 08/17/1979 | ||
| title = | | title = LER 79-058/03L-0 on 780803:while Performing Sys Functional Test,Time Delay Relay Found to Be Set at 11-s,exceeding Tech Specs Limit.Caused by Time Delay Setpoint Drift.Relay Recalibr & Tested | ||
| author name = Coggin C | | author name = Coggin C | ||
| author affiliation = GEORGIA POWER CO. | | author affiliation = GEORGIA POWER CO. |
Latest revision as of 20:11, 23 January 2020
Date released: 09/24/2019 | Download: ML19253A404 |
---|---|
ML19253A409 | |
Person / Time | |
---|---|
Site: | Hatch |
Issue date: | 08/17/1979 |
From: | Coggin C GEORGIA POWER CO. |
To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
References | |
Download: ML19253A409 (1) | |
ML19253A403 | |
Person / Time | |
---|---|
Site: | Hatch |
Issue date: | 08/17/1979 |
From: | Manry M GEORGIA POWER CO. |
To: | OREILLY J P NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
References | |
Download: ML19253A403 (1) | |