ML19256E988: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 6: Line 6:
| number = ML19256E989
| number = ML19256E989
| issue date = 11/09/1979
| issue date = 11/09/1979
| title = Forwards LER 79-100/03L-0
| title = LER 79-100/03L-0:on 791014,group 7,rod 7 Absolute Position Indication Showed Asymmetric W/O Clearing.Caused by Power Supply Cable.Cable Replaced W/High Temp Cable.Rebuilt Position Indicator Tube Installed
| author name = Naylor R
| author name = Naylor R
| author affiliation = TOLEDO EDISON CO.
| author affiliation = TOLEDO EDISON CO.

Latest revision as of 17:33, 23 January 2020

Forwards LER 79-100/03L-0
Date released: 09/27/2019 Download: ML19256E988


LER 79-100/03L-0:on 791014,group 7,rod 7 Absolute Position Indication Showed Asymmetric W/O Clearing.Caused by Power Supply Cable.Cable Replaced W/High Temp Cable.Rebuilt Position Indicator Tube Installed
ML19256E989
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 11/09/1979
From: Naylor R
TOLEDO EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19256E989 (2)
Forwards LER 79-100/03L-0
ML19256E987
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 11/09/1979
From: Murray T
TOLEDO EDISON CO.
To: KEPPLER J G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19256E987 (1)