ML19256G093: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 6: Line 6:
| number = ML19256G098
| number = ML19256G098
| issue date = 12/20/1979
| issue date = 12/20/1979
| title = Forwards LER 79-116/03L-0
| title = LER 79-116/03L-0:on 791123,Control Rod Group 5 Rod 11 Absolute Position Indication Declared Inoperable.Caused by Position Indication Assembly & Cabling Between Electrical Penetration & Rod.Investigation Continues
| author name = Werner J
| author name = Werner J
| author affiliation = TOLEDO EDISON CO.
| author affiliation = TOLEDO EDISON CO.

Latest revision as of 16:13, 23 January 2020

Forwards LER 79-116/03L-0
Date released: 09/27/2019 Download: ML19256G093


LER 79-116/03L-0:on 791123,Control Rod Group 5 Rod 11 Absolute Position Indication Declared Inoperable.Caused by Position Indication Assembly & Cabling Between Electrical Penetration & Rod.Investigation Continues
ML19256G098
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 12/20/1979
From: Werner J
TOLEDO EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19256G098 (3)
Forwards LER 79-116/03L-0
ML19256G092
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 12/20/1979
From: Murray T
TOLEDO EDISON CO.
To: KEPPLER J G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19256G092 (1)