ML19257A707: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 6: | Line 6: | ||
| number = ML19257A708 | | number = ML19257A708 | ||
| issue date = 12/27/1979 | | issue date = 12/27/1979 | ||
| title = | | title = LER 79-008/03L-0:on 791210,charging Pump a Taken Out of Svc Due to Observed Leakage in Discharge Manifold Area.Caused by Valve Seat Failure Possibly Resulting from Normal Fatigue.Valve Seat Replaced | ||
| author name = Fay C | | author name = Fay C | ||
| author affiliation = WISCONSIN ELECTRIC POWER CO. | | author affiliation = WISCONSIN ELECTRIC POWER CO. |
Latest revision as of 16:48, 23 January 2020
Date released: 09/28/2019 | Download: ML19257A707 |
---|---|
ML19257A708 | |
Person / Time | |
---|---|
Site: | Point Beach |
Issue date: | 12/27/1979 |
From: | Fay C WISCONSIN ELECTRIC POWER CO. |
To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
References | |
Download: ML19257A708 (2) | |
ML19257A706 | |
Person / Time | |
---|---|
Site: | Point Beach |
Issue date: | 12/27/1979 |
From: | Fay C WISCONSIN ELECTRIC POWER CO. |
To: | KEPPLER J G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
References | |
Download: ML19257A706 (1) | |