ML19259B789: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 6: Line 6:
| number = ML19259B790
| number = ML19259B790
| issue date = 03/16/1979
| issue date = 03/16/1979
| title = Forwards LER 79-029/01T-0
| title = LER 79-029/01T-0 on 790306:during Valve Lineup,Auxiliary Operator Mistakenly Closed Borated Water Storage Tank Isolation Valves DH7A & DH7B.Caused by Personnel Error. Valves Opened Immediately
| author name = Brown D
| author name = Brown D
| author affiliation = TOLEDO EDISON CO.
| author affiliation = TOLEDO EDISON CO.

Latest revision as of 15:21, 23 January 2020

Forwards LER 79-029/01T-0
Date released: 09/30/2019 Download: ML19259B789


LER 79-029/01T-0 on 790306:during Valve Lineup,Auxiliary Operator Mistakenly Closed Borated Water Storage Tank Isolation Valves DH7A & DH7B.Caused by Personnel Error. Valves Opened Immediately
ML19259B790
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 03/16/1979
From: David Brown
TOLEDO EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
FOIA-79-98
Download: ML19259B790 (3)
Forwards LER 79-029/01T-0
ML19259B788
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 03/16/1979
From: Murray T
TOLEDO EDISON CO.
To: KEPPLER J G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
FOIA-79-98
Download: ML19259B788 (1)