ML19260D580: Difference between revisions

From kanterella
Jump to navigation Jump to search
Created page by program invented by StriderTol
 
Created page by program invented by StriderTol
 
Line 6: Line 6:
| number = ML19260D589
| number = ML19260D589
| issue date = 02/04/1980
| issue date = 02/04/1980
| title = Forwards LER 80-003/01T-0
| title = LER 80-003/01T-0:on 800121,while at Cold Shutdown,Boron Buildups Identified on Loop B of Reactor Bldg Spray & Piping.Buildups Verified to Be Cracks in heat-affected Zone of Schedule 10 Pipe to Fitting Welds
| author name = Shively C
| author name = Shively C
| author affiliation = ARKANSAS POWER & LIGHT CO.
| author affiliation = ARKANSAS POWER & LIGHT CO.

Latest revision as of 12:53, 23 January 2020

Forwards LER 80-003/01T-0
Date released: 10/01/2019 Download: ML19260D580


LER 80-003/01T-0:on 800121,while at Cold Shutdown,Boron Buildups Identified on Loop B of Reactor Bldg Spray & Piping.Buildups Verified to Be Cracks in heat-affected Zone of Schedule 10 Pipe to Fitting Welds
ML19260D589
Person / Time
Site: Arkansas Nuclear 
Issue date: 02/04/1980
From: Shively C
ARKANSAS POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
Download: ML19260D589 (1)
Forwards LER 80-003/01T-0
ML19260D579
Person / Time
Site: Arkansas Nuclear 
Issue date: 02/04/1980
From: Trimble D
ARKANSAS POWER & LIGHT CO.
To: SEYFRIT K V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
Download: ML19260D579 (1)