ML19263C175: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 6: Line 6:
| number = ML19263C176
| number = ML19263C176
| issue date = 12/15/1978
| issue date = 12/15/1978
| title = Forwards RO NP-09-78-01
| title = RO-NP-09-78-01 on 781215:svc Water Sys Out Header Radiation Monitor Was Inoperable.Caused by Component Failure Due to Design Error.Personnel Informed of Environ Tech Specs
| author name =  
| author name =  
| author affiliation = TOLEDO EDISON CO.
| author affiliation = TOLEDO EDISON CO.

Latest revision as of 10:21, 23 January 2020

Forwards RO NP-09-78-01
Date released: 10/04/2019 Download: ML19263C175


RO-NP-09-78-01 on 781215:svc Water Sys Out Header Radiation Monitor Was Inoperable.Caused by Component Failure Due to Design Error.Personnel Informed of Environ Tech Specs
ML19263C176
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 12/15/1978
From:
TOLEDO EDISON CO.
To:
References
Download: ML19263C176 (2)
Forwards RO NP-09-78-01
ML19263C174
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 01/12/1979
From: Jeffery Grant
TOLEDO EDISON CO.
To: KEPPLER J G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19263C174 (1)