ML19269E509: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 6: | Line 6: | ||
| number = ML19269E533 | | number = ML19269E533 | ||
| issue date = 06/27/1979 | | issue date = 06/27/1979 | ||
| title = | | title = LER 79-081/03L-0 on 790608:individual Rod Position Indicators M-10 & D-10 Placed in Test Status,Contrary to Tech Specs.Caused by Repair Work to Remove Previously Installed Jumper.Calibr Performed | ||
| author name = Cartwright W | | author name = Cartwright W | ||
| author affiliation = VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) | | author affiliation = VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) | ||
Line 21: | Line 21: | ||
| number = ML19269E522 | | number = ML19269E522 | ||
| issue date = 06/27/1979 | | issue date = 06/27/1979 | ||
| title = | | title = LER 79-080/03L-0 on 790608:during Power Escalation,Axial Flux Difference Deviated More than +5% from Target for 16 Minutes,Contrary to Tech Specs.Caused by Withdrawal of Control Rods | ||
| author name = Cartwright W | | author name = Cartwright W | ||
| author affiliation = VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) | | author affiliation = VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) | ||
Line 36: | Line 36: | ||
| number = ML19269E518 | | number = ML19269E518 | ||
| issue date = 06/27/1979 | | issue date = 06/27/1979 | ||
| title = | | title = LER 79-075/03L-0 on 790604:during Steady State Operation, Axial Flux Difference Deviated Over 5% from Target for Two Minutes,Contrary to Tech Specs.Caused by Xenon Oscillation Initated by Rod Operability Test.Power Reduced by 2% | ||
| author name = Cartwright W | | author name = Cartwright W | ||
| author affiliation = VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) | | author affiliation = VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
Latest revision as of 09:44, 23 January 2020
Date released: 10/10/2019 | Download: ML19269E509 |
---|---|
ML19269E533 | |
Person / Time | |
---|---|
Site: | North Anna |
Issue date: | 06/27/1979 |
From: | Cartwright W VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
References | |
Download: ML19269E533 (2) | |
ML19269E522 | |
Person / Time | |
---|---|
Site: | North Anna |
Issue date: | 06/27/1979 |
From: | Cartwright W VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
References | |
Download: ML19269E522 (2) | |
ML19269E518 | |
Person / Time | |
---|---|
Site: | North Anna |
Issue date: | 06/27/1979 |
From: | Cartwright W VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
References | |
Download: ML19269E518 (2) | |
ML19269E508 | |
Person / Time | |
---|---|
Site: | North Anna |
Issue date: | 06/27/1979 |
From: | Stallings C VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
To: | OREILLY J P NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
References | |
Download: ML19269E508 (1) | |