ML19270F522: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 6: Line 6:
| number = ML19270F527
| number = ML19270F527
| issue date = 02/08/1979
| issue date = 02/08/1979
| title = Forwards LER 79-009/03L-0
| title = LER 79-009/03L-0:on 790112,power to Vital Bus Y2 Lost. False Integrated Control Sys Signal Resulted in Reactor & Full Steam & Feedwater Rupture Control Sys Trip.Caused by Blown 125 Volt DC Fuse to Inverter
| author name = Lingenfelter J
| author name = Lingenfelter J
| author affiliation = TOLEDO EDISON CO.
| author affiliation = TOLEDO EDISON CO.

Latest revision as of 09:18, 23 January 2020

Forwards LER 79-009/03L-0
Date released: 10/11/2019 Download: ML19270F522


LER 79-009/03L-0:on 790112,power to Vital Bus Y2 Lost. False Integrated Control Sys Signal Resulted in Reactor & Full Steam & Feedwater Rupture Control Sys Trip.Caused by Blown 125 Volt DC Fuse to Inverter
ML19270F527
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 02/08/1979
From: Lingenfelter J
TOLEDO EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
FOIA-79-149
Download: ML19270F527 (3)
Forwards LER 79-009/03L-0
ML19270F521
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 02/09/1979
From: Murray T
TOLEDO EDISON CO.
To: KEPPLER J G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
FOIA-79-149
Download: ML19270F521 (1)