ML19270F561: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 6: Line 6:
| number = ML19270F562
| number = ML19270F562
| issue date = 02/09/1979
| issue date = 02/09/1979
| title = Forwards LER 79-011/03L-0
| title = LER 79-011/03L-0 on 790124:while in Cold Shutdown,Both Doors of Reactor Bldg Were Opened,Violating Secondary Containment. Bracket Into Which Dead Bolt Projects Was Bent,Preventing Interlock from Functioning.Bracket Was Repaired
| author name = Greene T
| author name = Greene T
| author affiliation = GEORGIA POWER CO.
| author affiliation = GEORGIA POWER CO.

Latest revision as of 09:14, 23 January 2020

Forwards LER 79-011/03L-0
Date released: 10/11/2019 Download: ML19270F561


LER 79-011/03L-0 on 790124:while in Cold Shutdown,Both Doors of Reactor Bldg Were Opened,Violating Secondary Containment. Bracket Into Which Dead Bolt Projects Was Bent,Preventing Interlock from Functioning.Bracket Was Repaired
ML19270F562
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 02/09/1979
From: Thomas Greene
GEORGIA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19270F562 (1)
Forwards LER 79-011/03L-0
ML19270F560
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 02/04/1979
From: Manry M
GEORGIA POWER CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19270F560 (1)