ML19270G389: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 6: Line 6:
| number = ML19270G391
| number = ML19270G391
| issue date = 05/21/1979
| issue date = 05/21/1979
| title = Forwards LER 79-008/01T-0
| title = LER 79-008/01T-0 on 790502:remote Possibility Exists for Simultaneous Safety Injection in Both Units,Which Could Result in Emergency Diesel Overloading.Pressurizer Logic & Power Supplies Changed
| author name = Burstein S
| author name = Burstein S
| author affiliation = WISCONSIN ELECTRIC POWER CO.
| author affiliation = WISCONSIN ELECTRIC POWER CO.

Latest revision as of 08:59, 23 January 2020

Forwards LER 79-008/01T-0
Date released: 10/11/2019 Download: ML19270G389


LER 79-008/01T-0 on 790502:remote Possibility Exists for Simultaneous Safety Injection in Both Units,Which Could Result in Emergency Diesel Overloading.Pressurizer Logic & Power Supplies Changed
ML19270G391
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 05/21/1979
From: Burstein S
WISCONSIN ELECTRIC POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19270G391 (4)
Forwards LER 79-008/01T-0
ML19270G388
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 05/21/1979
From: Burstein S
WISCONSIN ELECTRIC POWER CO.
To: KEPPLER J G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19270G388 (1)