ML19276G932: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 6: Line 6:
| number = ML19276G933
| number = ML19276G933
| issue date = 08/21/1979
| issue date = 08/21/1979
| title = Forwards LER 79-086/03L-0
| title = LER 79-086/03L-0 on 790725:while Performing Routine Preventative Maint,Condensing Unit Train 2 of Control Room Emergency Ventilation Sys Would Not Start.Caused by Failure of Thermistor in Compressor Motor Winding
| author name = Rudolph J
| author name = Rudolph J
| author affiliation = TOLEDO EDISON CO.
| author affiliation = TOLEDO EDISON CO.

Latest revision as of 06:52, 23 January 2020

Forwards LER 79-086/03L-0
Date released: 10/17/2019 Download: ML19276G932


LER 79-086/03L-0 on 790725:while Performing Routine Preventative Maint,Condensing Unit Train 2 of Control Room Emergency Ventilation Sys Would Not Start.Caused by Failure of Thermistor in Compressor Motor Winding
ML19276G933
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 08/21/1979
From: Rudolph J
TOLEDO EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19276G933 (2)
Forwards LER 79-086/03L-0
ML19276G931
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 08/21/1979
From: Murray T
TOLEDO EDISON CO.
To: KEPPLER J G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19276G931 (1)