ML19290E971: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 6: Line 6:
| number = ML19290E974
| number = ML19290E974
| issue date = 03/13/1980
| issue date = 03/13/1980
| title = Forwards LER 80-017/03L-0
| title = LER 80-017/03L-0:on 800217,operations Personnel Noted That Safety Features Actuation Sys Channel 3 Borated Water Storage Tank Level Indication Was Six Feet Higher than Other Meters.Caused by Freezing of Transmitter Sensing Line
| author name = Trautman D
| author name = Trautman D
| author affiliation = TOLEDO EDISON CO.
| author affiliation = TOLEDO EDISON CO.

Latest revision as of 03:21, 23 January 2020

Forwards LER 80-017/03L-0
Date released: 10/31/2019 Download: ML19290E971


LER 80-017/03L-0:on 800217,operations Personnel Noted That Safety Features Actuation Sys Channel 3 Borated Water Storage Tank Level Indication Was Six Feet Higher than Other Meters.Caused by Freezing of Transmitter Sensing Line
ML19290E974
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 03/13/1980
From: Trautman D
TOLEDO EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19290E974 (2)
Forwards LER 80-017/03L-0
ML19290E970
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 03/13/1980
From: Murray T
TOLEDO EDISON CO.
To: KEPPLER J G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19290E970 (1)