ML19296B425: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 6: Line 6:
| number = ML19296B433
| number = ML19296B433
| issue date = 02/13/1980
| issue date = 02/13/1980
| title = Forwards LER 80-005/03L-0
| title = LER 80-005/03L-0:on 800118,during Solid State Protection Sys Operability Test on B Train SSPS,1B Steam Generator Level Logic Failed Logic Test Requirements.Caused by Failed Universal Card in B Train Ssps
| author name = Hairston W
| author name = Hairston W
| author affiliation = ALABAMA POWER CO.
| author affiliation = ALABAMA POWER CO.

Latest revision as of 13:06, 20 January 2020

Forwards LER 80-005/03L-0
Date released: 11/06/2019 Download: ML19296B425


LER 80-005/03L-0:on 800118,during Solid State Protection Sys Operability Test on B Train SSPS,1B Steam Generator Level Logic Failed Logic Test Requirements.Caused by Failed Universal Card in B Train Ssps
ML19296B433
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 02/13/1980
From: Hairston W
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19296B433 (1)
Forwards LER 80-005/03L-0
ML19296B424
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 02/13/1980
From: Clayton F
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19296B424 (1)