ML19350E280: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 6: Line 6:
| number = ML19350E283
| number = ML19350E283
| issue date = 06/10/1981
| issue date = 06/10/1981
| title = Forwards LER 81-019/03L-0
| title = LER 81-019/03L-0:on 810514,level Recorder 5049 Was Found Indicating High.Caused by Calibr Shift Due to Jarring Instrument Sensing Lines During Installation of Torus Room Staging.Recorder & Transmitters Recalibr
| author name = Mcloughlin M
| author name = Mcloughlin M
| author affiliation = BOSTON EDISON CO.
| author affiliation = BOSTON EDISON CO.

Latest revision as of 17:15, 16 January 2020

Forwards LER 81-019/03L-0
Date released: 12/30/2019 Download: ML19350E280


LER 81-019/03L-0:on 810514,level Recorder 5049 Was Found Indicating High.Caused by Calibr Shift Due to Jarring Instrument Sensing Lines During Installation of Torus Room Staging.Recorder & Transmitters Recalibr
ML19350E283
Person / Time
Site: Pilgrim
Issue date: 06/10/1981
From: Mcloughlin M
BOSTON EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML19350E283 (1)
Forwards LER 81-019/03L-0
ML19350E279
Person / Time
Site: Pilgrim
Issue date: 06/10/1981
From: Machon R
BOSTON EDISON CO.
To: GRIER B H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML19350E279 (1)