ENS 53846: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 16: Line 16:
| event date = 12/06/2018 00:00 EST
| event date = 12/06/2018 00:00 EST
| last update date = 03/21/2019
| last update date = 03/21/2019
| title = En Revision Imported Date  3/22/2019
| title = Part 21 - Potential Defect in Vickers Voltage Regulator System
| event text = EN Revision Text: PART 21 - POTENTIAL DEFECT IN VICKERS VOLTAGE REGULATOR SYSTEM
| event text = The following summary was provided in the Part 21 report:
The following summary was provided in the Part 21 report:
ESI [Engine Systems Inc.] was notified on December 6, 2018 of a potential issue with saturable reactors (also referred to as magnetic amplifiers) supplied to Monticello Nuclear Generating Plant. ESI provided the reactors as like-for-like replacements for the existing magnetics of the original Vickers voltage regulator and static exciter. During system testing performed by Monticello at another vendor facility, issues with the static excitation system were identified which prevented proper control of the generator field current. Troubleshooting identified several potential causes and ESI believes there may be a potential deficiency in the saturable reactor, P/N 8408218-ESI.
ESI [Engine Systems Inc.] was notified on December 6, 2018 of a potential issue with saturable reactors (also referred to as magnetic amplifiers) supplied to Monticello Nuclear Generating Plant. ESI provided the reactors as like-for-like replacements for the existing magnetics of the original Vickers voltage regulator and static exciter. During system testing performed by Monticello at another vendor facility, issues with the static excitation system were identified which prevented proper control of the generator field current. Troubleshooting identified several potential causes and ESI believes there may be a potential deficiency in the saturable reactor, P/N 8408218-ESI.
This component is integral to operability of the Vickers style voltage regulator and static exciter systems used on many emergency diesel generator sets in the nuclear industry. A deficiency in the reactor would adversely affect the ability to control generator output voltage and therefore adversely affect emergency diesel generator set performance.
This component is integral to operability of the Vickers style voltage regulator and static exciter systems used on many emergency diesel generator sets in the nuclear industry. A deficiency in the reactor would adversely affect the ability to control generator output voltage and therefore adversely affect emergency diesel generator set performance.
Line 56: Line 55:
Affected facilities still include Monticello, Turkey Point, and Surry.  
Affected facilities still include Monticello, Turkey Point, and Surry.  
Notified R2DO (Montgomery) and R3DO (McCraw), Part 21/50.55 Reactors group via e-mail.
Notified R2DO (Montgomery) and R3DO (McCraw), Part 21/50.55 Reactors group via e-mail.
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2019/20190322en.html#en53846
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2019/20190124en.html#en53846
}}
}}


{{ENS-Nav}}
{{ENS-Nav}}

Revision as of 08:30, 1 January 2020

ENS 53846 +/-
Where
Engine Systems, Inc
Rocky Mount, North Carolina (NRC Region 1)
Organization: Engine Systems, Inc
Reporting
10 CFR 21.21(a)(2), Interim Report for Comply or Defect in Component
Time - Person (Reporting Time:+1188.25 h49.51 days <br />7.073 weeks <br />1.628 months <br />)
Opened: Dan Roberts
17:15 Jan 24, 2019
NRC Officer: Jeffrey Whited
Last Updated: Mar 21, 2019
53846 - NRC Website