NEI 99-04, Submittal of Updated Final Safety Analysis Report, Revision 48: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 1: Line 1:
{{Adams
#REDIRECT [[NEI 99-04, Submittal of Commitment Change Summary Report - 2018]]
| number = ML15279A467
| issue date = 09/14/2015
| title = Submittal of Updated Final Safety Analysis Report, Revision 48
| author name = Gudger D
| author affiliation = Exelon Generation Co, LLC
| addressee name =
| addressee affiliation = NRC/Document Control Desk, NRC/NRR
| docket = 05000317, 05000318
| license number = DPR-053, DPR-069
| contact person =
| case reference number = NEI 99-04
| package number = ML15279A292
| document type = Letter type:NEI
| page count = 5
}}
 
=Text=
{{#Wiki_filter:/
200 Exelon Way Kennett Square, PA 19348 www.exeloncorp.com Exel~o Generation 10 CER 50.71 (e)(4) 10 CFR 54.37(b)
NEI 99-04 September 14, 2015 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Calvert Cliffs Nuclear Power Plant, Units 1 and 2 Renewed Facility Operating License Nos. DPR-53 and DPR-69 NRC Docket Nos. 50-317 and 50-318
 
==SUBJECT:==
Submittal of Updated Final Safety Analysis Report, Revision 48 In accordance with 10 CFR 50.71 (e)(4) and 10 CFR 50.4(b)(6), enclosed is Revision 48 of the Updated Final Safety Analysis Report (UFSAR) for Calvert Cliffs Nuclear Power Plant (CCNPP). The enclosed UFSAR revision is being provided to the U.S. Nuclear Regulatory Commission (NRC) in electronic format on CD-ROM. The electronic version of the UFSAR revision is being submitted in entirety and is a complete document.
10 CFR 50.71 (e)(4) stipulates subsequent revisions must be filed annually or 6 months after each refueling outage provided the interval between successive updates does not exceed 24 months and the revisions must reflect all changes up to a maximum of 6 months prior to the date of filling. Revision 48 of the UFSAR incorporates applicable changes for the required updating period. The previous revision (i.e., Revision 47) of the CCNPP was submitted on September 19, 2014. provides a brief summary of the changes incorporated into UFSAR Revision 48. includes file directory structure information identifying directory path, filename, and size of the individual files on the enclosed CD.
In addition, pursuant to the requirements of 10 CFR 54.37(b) and the guidance specified in Regulatory Issue Summary 2007-1 6, Revision 1, "Implementation of the Requirements of 10 CFR 54.37(b) for Holders of Renewed Licenses, "the UFSAR update required by 10 CFR 50.71 (e) must include any Structures, Systems, or Components (SSCs) newly identified that would have been subject to an aging management review or evaluation of time-limited aging analyses in accordance with 10 CFR 54.21. The UFSAR update must describe how the licensee will manage the effects of aging in order to effectively maintain the intended function(s) of newly-identified SSCs. An evaluation was completed to determine whether any newly-identified SSCs existed in support of submitting UFSAR Revision 48 for CON PP, Units 1 and 2. As a result of this evaluation, there were no newly-identified SSCs for which aging management reviews or time-limited aging analyses would apply.
 
K U.S. Nuclear Regulatory Commission Submittal of CCNPP UFSAR Revision 48 NRC Docket Nos. 50-317 and 50-318 September 14, 2015 Page 2 Furthermore, in accordance with the guidance NEI 99-04, "Guidelines for Managing NRC Commitment Changes,"this submittal addresses commitment changes made since the previous UFSAR submittal on September 19, 2014. There are no commitment changes being reported in conjunction with this submittal.
As required by 10OCFR50.71 (e)(2)(i), I certify that to the best of my knowledge, Revision 48 of the UFSAR accurately reflects information and analyses submitted to the NRC, or prepared pursuant to NRC requirements as described above.
If you have any questions or require further information, please contact Richard Gropp at (610) 765-5557.
Resp4ctfully',,,j David T. Gudger Manager, Licensing and Regulatory Affairs Exelon Generation Company, LLC Attachments: Attachment 1 - Brief Summary of the Changes Attachment 2 - Electronic File Directory Structure
 
==Enclosure:==
CCNPS, Units 1 and 2, UFSAR Revision 48 (CD-ROM) cc:    Regional Administrator, Region I, USNRC                w/ Enclosure/Attachments USNRC Senior Resident Inspector, CCNPP" USNRC Senior Project Manager NRR, CCNPP" S. T. Gray, State of Maryland"
 
Brief Summary of the Changes Page 1 of 1 Change Number                                                                  Brief Description of Change
                                        *Update UFSAR Section 7.5.7 (Seismic Instrumentation) to remove seismic UCR00789      ...................      ggers 0-Y:.S-001 .an~d o.-YS-0(02 an~d..seismic! playb~ack! 0-Y*R-0 1.*!.
                                        .tr.....i                                                                                                                        ..............................
                                        *Add description for new UFSAR Section 16.3.4 Reactor Pressure Vessel UCR0081 6
                  ....              iToughnh ess R equirem enlts.: ................... .......                                .. .....              ........                            .. .
Revise UFSAR Section 7.4.5 to describe changes in the Feedwater control UCR00850                            sys~te~m and..Steam ...Gen~erator..feed p.*ump..tur.bine..sp~eedco..*ntrol..s~ys~tem.rn........................
                  ............................
    ...UCR00861 ..                        Revise UFSAR Sections 7.10.2 and 14.4 related to Excess Load event.
UCR00866                .....Revise description in UFSAR Table 16-2 for Line Item 189.
UCR00867                            R evis~e descri.Ptior.nin, UFSAR .Table 1.*.6-2..for..Lin]e..I.tem .254.,...............................................
                  ...........................
Revise UFSAR Section 11.2.3.1 and Table 11-11 to reflect changes related to UCR00868 area radiation monitors.
                                      "Revi se UFJSARnTabl}e 9-20oto adda"note to allow d ifferent piping 'material andi............
                  ..........................
UCR00870 Revise UFSAR Table 11-10 to reflect changes in the display for the Main Steam UCR00872 Line radiation monitors.
    ...
U.C.R.0.08735                    ..R~evise descrip~tio in.
                  .........................                                  n UF.SAR T.abl!e...1.6-2 f.or L~ine..Item .21.6 ..... .................................
UCR00877                          SAdd description for new UFSAR Section 16.3.1 Containment Tendon Prestress SLoss and update various line items in Table 16-2.                                                        .                .
UCR00883
                  ..................... Revise UFSAR S-ection 8.4.44related to the installation of a new Automatic...............
UCR00884 Ad~d description..f~ornew. UFISAR. Sect~ion... 16..3.2...poisoQn..Sheets in spent..Fuel. Pool.
                  ............................
UCR00884                          '.Add description for new UFSAR Section 16.3.3 10 CER 50.49 Environmental
                              ...... :Q ualification P!rogram .                        ......                          . . ..                        .        ...                          . .. ...
UCR00886      ................... Revise UF~sAR Table 9-18 concerning maintaining Diesel-Generator Room...                                                                                            ..
UCR00887                          *temperature.
UC008 SUpdate UFSAR Sections 3.3, 3.4, 3.5, and 3.7 to include information for Unit 2 (Cycle 21 ) fuel batch and burnable poison data, cycle limiting values and excess UCR00891 shutdown margin, quarter core assembly map, relative power densities at
                  ...... ..................d~iff[
e rent. c o£nditio ns .*.......................... ........ . ........ .. .. . . ... . .. .. . ... .......... ..... . ... .................
UCR00892                          SUpdate UFSAR Sections 7.5.4 and 7.5.5 related Plant Process Computer.
    ...U.CRO00893.                    i..Revi~s~e.descripltionD in UF).SA.R. Tabl.e 1.6-.2_.0
                  .........................                                                                            forline.Item 1!56. .................... ......... ....
UCR00894                            Revise UFSAR Section 7.4.7.2 description related to Turbine high exhaust
                                    .. . em peeraatuu re....
                  .....................                        trip....
e trte                      .. ...... . ....... .............. .. . ....... . . ......                          .          ..... . . ..........
Revise UFSAR Sections 14.13, 14.14, and 14.17 for Unit 2 Cycle 21 concerning UCR00896 use of AREVA fuel.
Revise UFSAR Section 8.4 description regarding diesel fuel oil calculation UCR00898
                          ......... ... me
                  ..... .....            m ethhood .....
                                                    * . .. ........        . . .......              .. ... ................ . ... . . . . . . . . ...... . . . . ..... .. .. . ..
Revise UFSAR to add new information in Section 9.3.2.1 (Circulating Water UCR00902
                      ......... .......Syys~tem)),...
                  ........                            ............ ........            ........ .............. ............. ...... ...... ...... ....... ........... . .......... ............... ............
UCR.0.091 9  .................. Revise UFSAR. Section 5A.3_.5. (Referen~ces). to? correct a date reference ...........
SRevise various UFSAR sections and LOEP references to make editorial UCR00921 corrections.
 
                                                      .ATTACHMENT 2                                                                      Page ilof 1 Electronic File Directory Structure I :C 4FA          0    1Intro and Summary.pdf                                        ___                                            439,7721j
*d:\CC UFSAR R48          :002 01 Intro and Summary Fig.pdf                        ____9,068,1151 d:\C UFSR R400  02  ite  nd Evirnmenpdfg                                                                  i54ij              3 {j
~d:\CC UFSAR R48        :003 02 Site and EnvironmentFg.pdf                                                                        ______        -
Sd:\CC UFSAR R48          005 03 Reactor.pdf                                      _____1,021,0751 d:\CC UFSAR R48        :006 03 Reactor Fig.pdf                                                              i                          ,5"118 '278i
;d:\CC UFA    4            0    4RSand Associated Sys.pdf                                                      i5719 id:\CUFAR R48008  t            04 RCS and Associated Sys Fig.pdf ...                  ..................        ..                      1,294,7091t d:\CC UFSAR R48          00    5Structures.pdf                                                                '5975 d:CCUSA 48            1010 05 StructuresFigpdfdf,762,22 d:\CC UFSAR R48          0611 05 Structures App.pdf                                                            .____                        526,778 1 id:\CCUFSAR R48          1012 05 Structures App Fig.pdf                                                        1                            752,4021 d:\CC UFSAR R48
_  __      ]015  07 lnstr and Controls.pdf
_  _      _  _  _  _  _  _  _    _                __ _  _ _679,439!
d\CUARR48              1016 07 Instr and Controls Fig.pdf                                                                              3,142,6181
!dA*CC UFSAR  R48    __    017 08  Electrical Sys.pdf                                                                                        349,60tU
                                                                                                ................ ....................................
4d:CC UFSAR R48        [018 08  Electrical Sys Fig.pdf                                                                    ___-        2,927,2881 Id:\CC UFSAR R48        i019 09  Auxiliary Systems.pdf                      ____675,9861
!d:\CC*UFSAR R48        1020 09  Auxiliary Systems Fig.pdf                  ___                      __                                4,610,1731 d:\CC UFSAR R48          02    0Steam and Power Conv.pdf                                                                              ,135,6691 id:\CC UFSAR R48          022 10 Steam and Power Cony Fig.pdf                                                  i4,382,1371 d:\CC UFSAR R48        :023 11 Waste Processing and RP.pdf          ___                      ____                __                    *419,647 d:\CC UFSAR R48          024 11 Waste Processing and RP Fig.pdf          _____3,458,674t d:\ccUFSAR  R48    ~    025 12 Conduct of Operations.pdf                                                    i13741731 rd:\CC UFSAR  R48        1026 12 Conduct of Operations Fig.pdf                                                                              183,564!
'd:\CC UFSAR R48        *027 13 Initial Tests and Operation.pdf          _____110,5081
!d:\CC UFSAR  R48        j028§14 Safety Analysis.pdf                                        ___                                            1,280,677 Sd:\CC UFSAR R48        1029 14 Safety AnalysisFig.pdf                                                                                  3,774,1021 d:\CC UFSAR R48          030 15Technical Req Manual.pdf                                                                                  _  71,877 d:CUFAR4          031    License Renewal.pdf                ___________                                                  __        401,930~
 
ENCLOSURE Calvert Cliffs Nuclear Power Plant Units 1 and 2 Updated Final Safety Analysis Report, Revision 48 Compact Disk (CD)
 
                                                                                                      /
200 Exelon Way Kennett Square, PA 19348 www.exeloncorp.com Exel~o Generation 10 CER 50.71 (e)(4) 10 CFR 54.37(b)
NEI 99-04 September 14, 2015 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Calvert Cliffs Nuclear Power Plant, Units 1 and 2 Renewed Facility Operating License Nos. DPR-53 and DPR-69 NRC Docket Nos. 50-317 and 50-318
 
==SUBJECT:==
Submittal of Updated Final Safety Analysis Report, Revision 48 In accordance with 10 CFR 50.71 (e)(4) and 10 CFR 50.4(b)(6), enclosed is Revision 48 of the Updated Final Safety Analysis Report (UFSAR) for Calvert Cliffs Nuclear Power Plant (CCNPP). The enclosed UFSAR revision is being provided to the U.S. Nuclear Regulatory Commission (NRC) in electronic format on CD-ROM. The electronic version of the UFSAR revision is being submitted in entirety and is a complete document.
10 CFR 50.71 (e)(4) stipulates subsequent revisions must be filed annually or 6 months after each refueling outage provided the interval between successive updates does not exceed 24 months and the revisions must reflect all changes up to a maximum of 6 months prior to the date of filling. Revision 48 of the UFSAR incorporates applicable changes for the required updating period. The previous revision (i.e., Revision 47) of the CCNPP was submitted on September 19, 2014. provides a brief summary of the changes incorporated into UFSAR Revision 48. includes file directory structure information identifying directory path, filename, and size of the individual files on the enclosed CD.
In addition, pursuant to the requirements of 10 CFR 54.37(b) and the guidance specified in Regulatory Issue Summary 2007-1 6, Revision 1, "Implementation of the Requirements of 10 CFR 54.37(b) for Holders of Renewed Licenses, "the UFSAR update required by 10 CFR 50.71 (e) must include any Structures, Systems, or Components (SSCs) newly identified that would have been subject to an aging management review or evaluation of time-limited aging analyses in accordance with 10 CFR 54.21. The UFSAR update must describe how the licensee will manage the effects of aging in order to effectively maintain the intended function(s) of newly-identified SSCs. An evaluation was completed to determine whether any newly-identified SSCs existed in support of submitting UFSAR Revision 48 for CON PP, Units 1 and 2. As a result of this evaluation, there were no newly-identified SSCs for which aging management reviews or time-limited aging analyses would apply.
 
K U.S. Nuclear Regulatory Commission Submittal of CCNPP UFSAR Revision 48 NRC Docket Nos. 50-317 and 50-318 September 14, 2015 Page 2 Furthermore, in accordance with the guidance NEI 99-04, "Guidelines for Managing NRC Commitment Changes,"this submittal addresses commitment changes made since the previous UFSAR submittal on September 19, 2014. There are no commitment changes being reported in conjunction with this submittal.
As required by 10OCFR50.71 (e)(2)(i), I certify that to the best of my knowledge, Revision 48 of the UFSAR accurately reflects information and analyses submitted to the NRC, or prepared pursuant to NRC requirements as described above.
If you have any questions or require further information, please contact Richard Gropp at (610) 765-5557.
Resp4ctfully',,,j David T. Gudger Manager, Licensing and Regulatory Affairs Exelon Generation Company, LLC Attachments: Attachment 1 - Brief Summary of the Changes Attachment 2 - Electronic File Directory Structure
 
==Enclosure:==
CCNPS, Units 1 and 2, UFSAR Revision 48 (CD-ROM) cc:    Regional Administrator, Region I, USNRC                w/ Enclosure/Attachments USNRC Senior Resident Inspector, CCNPP" USNRC Senior Project Manager NRR, CCNPP" S. T. Gray, State of Maryland"
 
Brief Summary of the Changes Page 1 of 1 Change Number                                                                  Brief Description of Change
                                        *Update UFSAR Section 7.5.7 (Seismic Instrumentation) to remove seismic UCR00789      ...................      ggers 0-Y:.S-001 .an~d o.-YS-0(02 an~d..seismic! playb~ack! 0-Y*R-0 1.*!.
                                        .tr.....i                                                                                                                        ..............................
                                        *Add description for new UFSAR Section 16.3.4 Reactor Pressure Vessel UCR0081 6
                  ....              iToughnh ess R equirem enlts.: ................... .......                                .. .....              ........                            .. .
Revise UFSAR Section 7.4.5 to describe changes in the Feedwater control UCR00850                            sys~te~m and..Steam ...Gen~erator..feed p.*ump..tur.bine..sp~eedco..*ntrol..s~ys~tem.rn........................
                  ............................
    ...UCR00861 ..                        Revise UFSAR Sections 7.10.2 and 14.4 related to Excess Load event.
UCR00866                .....Revise description in UFSAR Table 16-2 for Line Item 189.
UCR00867                            R evis~e descri.Ptior.nin, UFSAR .Table 1.*.6-2..for..Lin]e..I.tem .254.,...............................................
                  ...........................
Revise UFSAR Section 11.2.3.1 and Table 11-11 to reflect changes related to UCR00868 area radiation monitors.
                                      "Revi se UFJSARnTabl}e 9-20oto adda"note to allow d ifferent piping 'material andi............
                  ..........................
UCR00870 Revise UFSAR Table 11-10 to reflect changes in the display for the Main Steam UCR00872 Line radiation monitors.
    ...
U.C.R.0.08735                    ..R~evise descrip~tio in.
                  .........................                                  n UF.SAR T.abl!e...1.6-2 f.or L~ine..Item .21.6 ..... .................................
UCR00877                          SAdd description for new UFSAR Section 16.3.1 Containment Tendon Prestress SLoss and update various line items in Table 16-2.                                                        .                .
UCR00883
                  ..................... Revise UFSAR S-ection 8.4.44related to the installation of a new Automatic...............
UCR00884 Ad~d description..f~ornew. UFISAR. Sect~ion... 16..3.2...poisoQn..Sheets in spent..Fuel. Pool.
                  ............................
UCR00884                          '.Add description for new UFSAR Section 16.3.3 10 CER 50.49 Environmental
                              ...... :Q ualification P!rogram .                        ......                          . . ..                        .        ...                          . .. ...
UCR00886      ................... Revise UF~sAR Table 9-18 concerning maintaining Diesel-Generator Room...                                                                                            ..
UCR00887                          *temperature.
UC008 SUpdate UFSAR Sections 3.3, 3.4, 3.5, and 3.7 to include information for Unit 2 (Cycle 21 ) fuel batch and burnable poison data, cycle limiting values and excess UCR00891 shutdown margin, quarter core assembly map, relative power densities at
                  ...... ..................d~iff[
e rent. c o£nditio ns .*.......................... ........ . ........ .. .. . . ... . .. .. . ... .......... ..... . ... .................
UCR00892                          SUpdate UFSAR Sections 7.5.4 and 7.5.5 related Plant Process Computer.
    ...U.CRO00893.                    i..Revi~s~e.descripltionD in UF).SA.R. Tabl.e 1.6-.2_.0
                  .........................                                                                            forline.Item 1!56. .................... ......... ....
UCR00894                            Revise UFSAR Section 7.4.7.2 description related to Turbine high exhaust
                                    .. . em peeraatuu re....
                  .....................                        trip....
e trte                      .. ...... . ....... .............. .. . ....... . . ......                          .          ..... . . ..........
Revise UFSAR Sections 14.13, 14.14, and 14.17 for Unit 2 Cycle 21 concerning UCR00896 use of AREVA fuel.
Revise UFSAR Section 8.4 description regarding diesel fuel oil calculation UCR00898
                          ......... ... me
                  ..... .....            m ethhood .....
                                                    * . .. ........        . . .......              .. ... ................ . ... . . . . . . . . ...... . . . . ..... .. .. . ..
Revise UFSAR to add new information in Section 9.3.2.1 (Circulating Water UCR00902
                      ......... .......Syys~tem)),...
                  ........                            ............ ........            ........ .............. ............. ...... ...... ...... ....... ........... . .......... ............... ............
UCR.0.091 9  .................. Revise UFSAR. Section 5A.3_.5. (Referen~ces). to? correct a date reference ...........
SRevise various UFSAR sections and LOEP references to make editorial UCR00921 corrections.
 
                                                      .ATTACHMENT 2                                                                      Page ilof 1 Electronic File Directory Structure I :C 4FA          0    1Intro and Summary.pdf                                        ___                                            439,7721j
*d:\CC UFSAR R48          :002 01 Intro and Summary Fig.pdf                        ____9,068,1151 d:\C UFSR R400  02  ite  nd Evirnmenpdfg                                                                  i54ij              3 {j
~d:\CC UFSAR R48        :003 02 Site and EnvironmentFg.pdf                                                                        ______        -
Sd:\CC UFSAR R48          005 03 Reactor.pdf                                      _____1,021,0751 d:\CC UFSAR R48        :006 03 Reactor Fig.pdf                                                              i                          ,5"118 '278i
;d:\CC UFA    4            0    4RSand Associated Sys.pdf                                                      i5719 id:\CUFAR R48008  t            04 RCS and Associated Sys Fig.pdf ...                  ..................        ..                      1,294,7091t d:\CC UFSAR R48          00    5Structures.pdf                                                                '5975 d:CCUSA 48            1010 05 StructuresFigpdfdf,762,22 d:\CC UFSAR R48          0611 05 Structures App.pdf                                                            .____                        526,778 1 id:\CCUFSAR R48          1012 05 Structures App Fig.pdf                                                        1                            752,4021 d:\CC UFSAR R48
_  __      ]015  07 lnstr and Controls.pdf
_  _      _  _  _  _  _  _  _    _                __ _  _ _679,439!
d\CUARR48              1016 07 Instr and Controls Fig.pdf                                                                              3,142,6181
!dA*CC UFSAR  R48    __    017 08  Electrical Sys.pdf                                                                                        349,60tU
                                                                                                ................ ....................................
4d:CC UFSAR R48        [018 08  Electrical Sys Fig.pdf                                                                    ___-        2,927,2881 Id:\CC UFSAR R48        i019 09  Auxiliary Systems.pdf                      ____675,9861
!d:\CC*UFSAR R48        1020 09  Auxiliary Systems Fig.pdf                  ___                      __                                4,610,1731 d:\CC UFSAR R48          02    0Steam and Power Conv.pdf                                                                              ,135,6691 id:\CC UFSAR R48          022 10 Steam and Power Cony Fig.pdf                                                  i4,382,1371 d:\CC UFSAR R48        :023 11 Waste Processing and RP.pdf          ___                      ____                __                    *419,647 d:\CC UFSAR R48          024 11 Waste Processing and RP Fig.pdf          _____3,458,674t d:\ccUFSAR  R48    ~    025 12 Conduct of Operations.pdf                                                    i13741731 rd:\CC UFSAR  R48        1026 12 Conduct of Operations Fig.pdf                                                                              183,564!
'd:\CC UFSAR R48        *027 13 Initial Tests and Operation.pdf          _____110,5081
!d:\CC UFSAR  R48        j028§14 Safety Analysis.pdf                                        ___                                            1,280,677 Sd:\CC UFSAR R48        1029 14 Safety AnalysisFig.pdf                                                                                  3,774,1021 d:\CC UFSAR R48          030 15Technical Req Manual.pdf                                                                                  _  71,877 d:CUFAR4          031    License Renewal.pdf                ___________                                                  __        401,930~
 
ENCLOSURE Calvert Cliffs Nuclear Power Plant Units 1 and 2 Updated Final Safety Analysis Report, Revision 48 Compact Disk (CD)}}

Latest revision as of 01:08, 2 December 2019