ML19309F145: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 2: Line 2:
| number = ML19309F145
| number = ML19309F145
| issue date = 08/06/2019
| issue date = 08/06/2019
| title = 10/28/2019 Minutes: Alabama MRB Minutes August 6, 2019
| title = Minutes: Alabama MRB Minutes August 6, 2019
| author name = Johnson R, Parks J
| author name = Johnson R, Parks J
| author affiliation = NRC/NRR
| author affiliation = NRC/NRR

Latest revision as of 18:47, 28 November 2019

Minutes: Alabama MRB Minutes August 6, 2019
ML19309F145
Person / Time
Issue date: 08/06/2019
From: Rachel Johnson, Jazel Parks
Office of Nuclear Reactor Regulation
To:
Johnson R
References
Download: ML19309F145 (4)


Text

MINUTES: MANAGEMENT REVIEW BOARD MEETING OF ALABAMA AUGUST 6, 2019 THE MANAGEMENT REVIEW BOARD MEETING ATTENDEES WERE AS FOLLOWS:

Management Review Board K. Steven West, MRB Chair, OEDO Mark Shaffer, Region IV John Lubinski, MRB Member, NMSS David Allard, OAS Liaison, PA Mary Spencer, MRB Member, OGC IMPEP Team Lance Rakovan, Team Leader, NMSS Geoff Warren, Team Leader in Training, Region III Monica Ford, Region I Shawn Seely, Region I Jack Tway, New Jersey State of Alabama David Tuberville Staff Kevin Williams, NMSS/MSST Paul Michalak, NMSS/MSST Lizette Roldan-Otero, NMSS/MSST Robert Johnson, NMSS/MSST Kathy Modes, NMSS/MSST Duncan White, NMSS/MSST Michelle Beardsley, NMSS/MSST Joe Nick, Region I John Trapp, Region I Members of the Public Jennifer Opila, CO Angela Leek, IA Jeff Dauzat, LA Morgan Bullock, WA TOPICS DISCUSSED DURING THE MEETING INCLUDED:

1. Convention. Mr. Robert Johnson convened the meeting at approximately 1:00 p.m.

(ET). He noted that this Management Review Board (MRB) meeting was open to the public. Introductions of the attendees were conducted.

2. Alabama IMPEP Review. Mr. Lance Rakovan, Team Leader, led the presentation of the Alabama Integrated Materials Performance Evaluation Program (IMPEP) review results to the MRB. He summarized the review and the teams findings for the indicators reviewed. The on-site review was conducted by a team composed of technical staff members from the U.S. Nuclear Regulatory Commission (NRC), and the State of New Jersey during the period of May 20-24, 2019. A draft report was issued to Alabama for factual comment on June 20, 2019, and responded by letter with minor comment on July 12, 2019. Mr. Rakovan reported that the team found Alabamas performance was satisfactory on all indicators reviewed.

Alabama MRB Meeting Minutes Page 2

3. Performance Indicators.

a) Mr. Lance Rakovan reviewed and presented the common performance indicator, Technical Staffing and Training. His presentation corresponded to Section 3.1 of the proposed final IMPEP report. The MRB, the team, and Alabama representatives briefly discussed the status of the staff hired during the review period and the impact of vacancies on the Agreement State Program.

The team found Alabamas performance with respect to this indicator to be satisfactory and the MRB agreed.

b) Mr. Geoff Warren, Team Leader in Training, reviewed and presented the common performance indicator, Status of Materials Inspection Program. His presentation corresponded to Section 3.2 of the proposed final IMPEP report.

The MRB, the team, and Alabama representatives briefly discussed inspection findings.

The team found Alabamas performance with respect to this indicator to be satisfactory and the MRB agreed.

c) Ms. Monica Ford reviewed and presented the common performance indicator, Technical Quality of Inspections. Her presentation corresponded to Section 3.3 of the proposed final IMPEP report. The MRB, the team, and Alabama representatives briefly discussed the status of inspection actions. The team recommended that Alabama assess its industrial radiography inspection program with respect to temporary jobsites to determine whether any changes are necessary.

The team found Alabamas performance with respect to this indicator to be satisfactory: and the MRB agreed. The MRB also agreed with the teams recommendation.

d) Mr. Jack Tway reviewed the common performance indicator, Technical Quality of Licensing Actions. Ms. Elliot presented the teams findings. Her presentation corresponded to Section 3.4 of the proposed final IMPEP report.

The MRB, the team, and Alabamas representatives discussed the teams findings, as well as the actions the program had taken to address them.

The team found Alabamas performance with respect to this indicator to be satisfactory and the MRB agreed.

e) Mr. Shawn Seely reviewed and presented the common performance indicator, Technical Quality of Incident and Allegation Activities. His presentation corresponded to Section 3.5 of the proposed final IMPEP report. The MRB, the team, and Alabama representatives discussed incidents of high risk and protecting allegers identities.

The team found Alabamas performance with respect to this indicator to be satisfactory and the MRB agreed.

Alabama MRB Meeting Minutes Page 3 f) Mr. Lance Rakovan reviewed and presented the non-common performance indicator, Compatibility Requirements. His presentation corresponded to Section 4.1 of the proposed final IMPEP report. The MRB, the team, and Alabama representatives discussed the States overdue regulations, and program elements, as well as the actions the program has taken to address them.

The team found Alabamas performance with respect to this indicator to be satisfactory and the MRB agreed.

4. MRB Consultation/Comments on Issuance of Report. The team recommended, and the MRB agreed, that the Alabama Agreement State Program be found adequate to protect public health and compatible with the NRC's program. The team recommended that the next IMPEP review take place in approximately 4 years with a periodic meeting in approximately 2 years. The final report may be found in the ADAMS using the Accession Number ML19224A666.
5. Precedents/Lessons Learned. None
6. Comments from Members of the Public. None
7. Adjournment. The meeting was adjourned at approximately 2:15 p.m. (ET)

SUBJECT:

SUMMARY

OF AUGUST 6, 2019 ALABAMA MRB MEETING ML19309F145 OFFICE NMSS/SALB MSST/SALB NAME JParks RJohnson DATE 10/01/19 10/28/19 OFFICIAL RECORD COPY