Line 3: Line 3:
| issue date = 06/16/2000
| issue date = 06/16/2000
| title = June 13-14, 2000 Meeting Summary Letter to Mr. Davis with Enclosures 1 and 2, Attachments Scanned
| title = June 13-14, 2000 Meeting Summary Letter to Mr. Davis with Enclosures 1 and 2, Attachments Scanned
| author name = Beckner W D
| author name = Beckner W
| author affiliation = NRC/NRR/DRIP/RTSB
| author affiliation = NRC/NRR/DRIP/RTSB
| addressee name = Davis J W
| addressee name = Davis J
| addressee affiliation = Nuclear Energy Institute (NEI)
| addressee affiliation = Nuclear Energy Institute (NEI)
| docket =  
| docket =  
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:June16,2000Mr.JamesDavis,DirectorOperationsDepartment NuclearEnergyInstitute 1776IStreet,N.W.
{{#Wiki_filter:June 16, 2000 Mr. James Davis, Director Operations Department Nuclear Energy Institute 1776 I Street, N. W.
Suite400 Washington,DC20006-3708
Suite 400 Washington, DC 20006-3708


==DearMr.Davis:==
==Dear Mr. Davis:==
EnclosedisasummaryofourjointNRC/TechnicalSpecificationsTaskForce(TSTF)OwnersGroupmeetingattheNuclearRegulatoryCommissioninRockville,Marylandon June13and14,2000.ShouldtheTSTFhaveanycommentsorquestions,pleasedonot hesitatetocontactmeon301-415-1161orbye-mailatwdb@nrc.gov.Sincerely,/RA/WilliamD.Beckner,ChiefTechnicalSpecificationsBranch DivisionofRegulatoryImprovementPrograms OfficeofNuclearReactorRegulationProjectNo.689
 
Enclosed is a summary of our joint NRC/Technical Specifications Task Force (TSTF)
Owners Group meeting at the Nuclear Regulatory Commission in Rockville, Maryland on June 13 and 14, 2000. Should the TSTF have any comments or questions, please do not hesitate to contact me on 301-415-1161 or by e-mail at wdb@nrc.gov.
Sincerely,
                                    /RA/
William D. Beckner, Chief Technical Specifications Branch Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation Project No. 689


==Enclosures:==
==Enclosures:==
1.AttendeeList2.SummaryofMeetingcc:ThoseonenclosedAttendeesList NuclearEnergyInstituteProjectNo.689cc:Mr.RalphBeedleMs.LynnetteHendricks,DirectorSeniorVicePresidentPlantSupportandChiefNuclearOfficerNuclearEnergyInstituteNuclearEnergyInstituteSuite400 Suite4001776IStreet,NW 1776IStreet,NWWashington,DC20006-3708 Washington,DC20006-3708Mr.AlexMarion,DirectorMr.CharlesB.Brinkman,DirectorProgramsWashingtonOperations NuclearEnergyInstituteABB-CombustionEngineering,Inc.
: 1. Attendee List
Suite40012300TwinbrookParkway,Suite330 1776IStreet,NWRockville,Maryland20852 Washington,DC20006-3708Mr.DavidModeen,DirectorEngineering NuclearEnergyInstitute Suite400 1776IStreet,NW Washington,DC20006-3708Mr.AnthonyPietrangelo,Director Licensing NuclearEnergyInstitute Suite400 1776IStreet,NW Washington,DC20006-3708Mr.HankSepp,ManagerRegulatoryandLicensingEngineering WestinghouseElectricCorporation P.O.Box355 Pittsburgh,Pennsylvania15230Mr.JimDavis,DirectorOperations NuclearEnergyInstitute Suite400 1776IStreet,NW Washington,DC20006-3708 June16,2000Mr.JamesDavis,DirectorOperationsDepartment NuclearEnergyInstitute 1776IStreet,N.W.
: 2. Summary of Meeting cc:     Those on enclosed Attendees List
Suite400 Washington,DC20006-3708
 
Nuclear Energy Institute                                              Project No. 689 cc:   Mr. Ralph Beedle                    Ms. Lynnette Hendricks, Director Senior Vice President                Plant Support and Chief Nuclear Officer          Nuclear Energy Institute Nuclear Energy Institute            Suite 400 Suite 400                            1776 I Street, NW 1776 I Street, NW                    Washington, DC 20006-3708 Washington, DC 20006-3708 Mr. Alex Marion, Director            Mr. Charles B. Brinkman, Director Programs                            Washington Operations Nuclear Energy Institute            ABB-Combustion Engineering, Inc.
Suite 400                            12300 Twinbrook Parkway, Suite 330 1776 I Street, NW                    Rockville, Maryland 20852 Washington, DC 20006-3708 Mr. David Modeen, Director Engineering Nuclear Energy Institute Suite 400 1776 I Street, NW Washington, DC 20006-3708 Mr. Anthony Pietrangelo, Director Licensing Nuclear Energy Institute Suite 400 1776 I Street, NW Washington, DC 20006-3708 Mr. Hank Sepp, Manager Regulatory and Licensing Engineering Westinghouse Electric Corporation P.O. Box 355 Pittsburgh, Pennsylvania 15230 Mr. Jim Davis, Director Operations Nuclear Energy Institute Suite 400 1776 I Street, NW Washington, DC 20006-3708
 
June 16, 2000 Mr. James Davis, Director Operations Department Nuclear Energy Institute 1776 I Street, N. W.
Suite 400 Washington, DC 20006-3708


==DearMr.Davis:==
==Dear Mr. Davis:==
EnclosedisasummaryofourjointNRC/TechnicalSpecificationsTaskForce(TSTF)OwnersGroupmeetingattheNuclearRegulatoryCommissioninRockville,Marylandon June13and14,2000.ShouldtheTSTFhaveanycommentsorquestions,pleasedonot hesitatetocontactmeon301-415-1161orbye-mailatwdb@nrc.gov.Sincerely,/RA/WilliamD.Beckner,ChiefTechnicalSpecificationsBranch DivisionofRegulatoryImprovementPrograms OfficeofNuclearReactorRegulationProjectNo.689
 
Enclosed is a summary of our joint NRC/Technical Specifications Task Force (TSTF)
Owners Group meeting at the Nuclear Regulatory Commission in Rockville, Maryland on June 13 and 14, 2000. Should the TSTF have any comments or questions, please do not hesitate to contact me on 301-415-1161 or by e-mail at wdb@nrc.gov.
Sincerely,
                                      /RA/
William D. Beckner, Chief Technical Specifications Branch Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation Project No. 689


==Enclosures:==
==Enclosures:==
1.AttendeeList2.SummaryofMeetingcc:ThoseonenclosedAttendeesList DISTRIBUTION
: 1. Attendee List
:DBMatthews/SNewberryRTSBMembers PUBLICRTSBR/F WDBecknerJLBirmingham RLDennigADAMSDOCUMENTNAME:G:\RTSB\TSTFINFO\OwnersGroupCorrespondence\MTGSUM6-13-14.wpdOFFICERTSB/DRIPRTSB/DRIPRGEB/DRIPSC:RTSB/DRIPC:RTSB/DRIP:NRRNAMETRTjaderTRTLAHillLAHJLBirminghamJLBRLDennigRLDWDBecknerWDBDATE06/16/0006/16/0006/16/0006/16/0006/16/00OFFICIALRECORDCOPY NRC/TSTFOWNER'SGROUPMEETINGJune13&14,2000ENCLOSURE1ATTENDEESLISTNAMEORGANIZATIONB.L.WoodsCEOG/SanOnofreJ.ArbuckleBWROG/WNP2 H.PontiousBWROG/COMED B.MannEXCEL D.HoffmanEXCEL N.ClarksonBWOG/DUKE S.WidemanWOG/WCNOC W.BecknerNRC/NRR/RTSB R.DennigNRC/NRR/RTSB J.Birmingham*NRC/NRR T.R.TjaderNRC/NRR/RTSB N.Gilles**NRC/NRR/RTSB C.SchultenNRC/NRR/RTSB LeslieHillNRC/NRR/RTSB T.Liu*NRC/NRR/RTSB J.Foster*NRC/NRR/RTSB W.Reckley*NRR/PMAS J.Weil*McGrawHill*AttendedJune13only**AttendedJune14only Page1ENCLOSURE2TechnicalSpecificationTaskForceMeetingSummaryJune13&14,2000StaffmetwiththeNuclearEnergyInstituteTechnicalSpecificationTaskForce(NEITSTF)onJune13&14,2000.TheTSTFandstaffdiscussedthestatusofpendinghighpriorityTSTFsasdescribedbelow.Attachment1wasthepre-meetingstatusprovidedbytheTSTFandAttachment2wasthepre-meetingstatusprovidedbythestaff.016R.3:TheTSBhasthenecessaryinformationtocompleteitsreview;approvalisanticipated.207R.5:Approved.231R.1:Approved;RPSInstrumentationBases(B3.3.1.1)correction.306R.1:TheTSTFwillsubmitRevision2torevisetheBases.330R.0:TheTSTFwillsubmitRevision1whichwillbeasolutionthatisbaseduponthetemperatureaveragingconceptapprovedforBrunswick.332R.0:TheTSTFwillsubmitRevision1whichwillimplementthetopical,Supplement1ofNEDO-32291ofOctober1999,andremovethenon-genericcascadingissues.334R.1:TheTSTFwillsubmitRevision2toincludeareviewer'snotebaseduponarelatedtopical,onceitisapproved.342R.1:Approved.343R.0:StaffcommentshavebeenprovidedtotheTSTFandtheTSTFwillsubmitRevision1forstaffreviewinthenearfuture(lowpriority).355R.0:TheTSTFwillsubmitRevision1tomakeacorrectiontotheRPSInstrumentationBases(B3.3.3.1).360R.0:StaffisreviewingthelatestTSTFjustifications/submittals.361R.0:Approved.364R.0:Approved.365R.0(TSB-22):Approved.
: 2. Summary of Meeting cc:     Those on enclosed Attendees List DISTRIBUTION:
Page2ENCLOSURE2OtherTopicsDiscussed
DBMatthews/SNewberry            RTSB Members PUBLIC                          RTSB R/F WDBeckner                      JLBirmingham RLDennig                        ADAMS DOCUMENT NAME: G:\RTSB\TSTF INFO\Owners Group Correspondence\MTGSUM6-13-14.wpd OFFICE    RTSB/DRIP      RTSB/DRIP      RGEB/DRIP        SC:RTSB/DRIP    C:RTSB/DRIP:NRR NAME      TRTjaderTRT    LAHillLAH      JLBirminghamJLB  RLDennigRLD    WDBecknerWDB DATE      06/16/00      06/16/00        06/16/00          06/16/00        06/16/00 OFFICIAL RECORD COPY
:TheTSTFOGwillproposeaprogramtoincludeintheTechnicalSpecificationstoaddressdelayedLCOentryfortakingsnubbersoutofserviceforroutinemaintenance.Attachment3 wasprovidedtotheOGtohelpclarifyissuesinordertodeveloptheprogram.[Thoughnot discussed,inparalleltotheindustryeffortTSBwillworkonasection3.0specificationtoallow foradelaytimeentryintotheConditionsofanLCO.]Theintentistoavoidunnecessaryentry intoTSrequiredactionsforsupportedsystemswhenremovingsnubbersfromservicefor surveillancetesting.TheStaffpresentedsomequestions(Attachment4)regardingBWRplantrefuelingoutageoperations,withtheintenttoresolveconcernsaboutTSTF-225andBWRSTS3.10.6.TheOG willpresentthequestionstoindustryexpertsandprovideanswerstoTSB;TSBwillreviewand discusstheanswerswithSRXB,clarifytheconcerns,andpresenttheconcernswithproposed solutionstotheOG;and,ifnecessaryhaveanNEI-NRRmeetingtoresolveissues.TheStaff willprepareanSEonPerry'sproposedadoptionofTSTF-225fromtheresultsofthiseffort.TheproductionstatusofRevision2totheSTSNUREGswasdiscussed.TheplanistoresolveBWRrefuelingissuesandTSTF-360issuesbytheendofJuly2000,postthefinaldraftSTS Rev2forindustryandpubliccommentbymidAugust2000,andreceiveandincorporate commentsbytheendofSeptember2000.ThenpublishSTSRev2intheearlyFallof2000.
 
TSB-NEIproofingpanelswillbeconvenedasneededtoresolveeditorialissues.Adiscussion onproposedformatchangestotheSTSRev2TableofContents(TOC)wasconductedbriefly, withtheOGunanimouslyagreeingthatTOCshouldremainunchanged(Attachment5,a strawmanforthesuggestedchangeswaspassedout).ThestaffandTSTFmembersdiscussedthepotentialofusingtheconsolidatedlineitemimprovementprocess(CLIIP)fortheremovalofpostaccidentsamplingsystems(PASS)from theTSofWestinghouseandCombustionEngineeringplants.Theownersgroupsforthose plantshavereceivedsafetyevaluationsfortopicalreportsthatjustifiedremovingPASS.The ownersgroupsrepresentativesagreedtopursueaTSTFtravelerfortheremovalofPASS.
NRC/TSTF OWNER'S GROUP MEETING June 13 & 14, 2000 ATTENDEES LIST NAME              ORGANIZATION B. L. Woods            CEOG/San Onofre J. Arbuckle            BWROG/WNP2 H. Pontious            BWROG/COMED B. Mann                EXCEL D. Hoffman            EXCEL N. Clarkson            BWOG/DUKE S. Wideman            WOG/WCNOC W. Beckner            NRC/NRR/RTSB R. Dennig              NRC/NRR/RTSB J. Birmingham*         NRC/NRR T. R. Tjader          NRC/NRR/RTSB N. Gilles**           NRC/NRR/RTSB C. Schulten            NRC/NRR/RTSB Leslie Hill            NRC/NRR/RTSB T. Liu*               NRC/NRR/RTSB J. Foster*             NRC/NRR/RTSB W. Reckley*           NRR/PMAS J. Weil*               McGraw Hill
FollowingreceiptoftheproposedTSTF,thestaffbelievesitisinaposition(basedonthe topicalreviews)toquicklypublishthenoticeforcommentascalledforintheCLIIP.TheBWR andB&WOwnersGroupswouldlikelysubmitTSTFsandtheCLIIPwouldbeusedforthe remainingplantsusingaseparateactivity.BillReckleyofthestaffprovidedapossibleexample ofanindividuallicensee'sapplicationusingtheCLIIPforPASSelimination(Attachment6).ThestatusoftheRiskInformedTechnicalSpecifications(RITS)effortwasdiscussed.TheOGhassubmittedproposalforInitiatives1(preferredendstates),2(revisedelaytimeforentering requiredactionsuponmissingasurveillance),and3(modifymoderestraintlogic);Initiative1is currentlyunderreviewbythestaff.RevisionstoTSTF-358andTSTF-359canbeexpected fromtheOGinearlyJuly.AproposalonInitiative6(modifyLCO3.0.3)isexpectedfromthe OGbytheendoftheyear.Participantsagreedtoconductastatusconferencecallat10AMonJune27,2000.ThenextTSTFmeetingwillbeonJuly13-14,2000attheNRC.}}
*Attended June 13 only
**Attended June 14 only ENCLOSURE 1
 
Technical Specification Task Force Meeting Summary June 13 & 14, 2000 Staff met with the Nuclear Energy Institute Technical Specification Task Force (NEI TSTF) on June 13 & 14, 2000.
The TSTF and staff discussed the status of pending high priority TSTFs as described below. was the pre-meeting status provided by the TSTF and Attachment 2 was the pre-meeting status provided by the staff.
016 R.3: The TSB has the necessary information to complete its review; approval is anticipated.
207 R.5: Approved.
231 R.1: Approved; RPS Instrumentation Bases (B3.3.1.1) correction.
306 R.1: The TSTF will submit Revision 2 to revise the Bases.
330 R.0: The TSTF will submit Revision 1 which will be a solution that is based upon the temperature averaging concept approved for Brunswick.
332 R.0: The TSTF will submit Revision 1 which will implement the topical, Supplement 1 of NEDO-32291 of October 1999, and remove the non-generic cascading issues.
334 R.1: The TSTF will submit Revision 2 to include a reviewers note based upon a related topical, once it is approved .
342 R.1: Approved.
343 R.0: Staff comments have been provided to the TSTF and the TSTF will submit Revision 1 for staff review in the near future (low priority).
355 R.0: The TSTF will submit Revision 1 to make a correction to the RPS Instrumentation Bases (B3.3.3.1).
360 R.0: Staff is reviewing the latest TSTF justifications/submittals.
361 R.0: Approved.
364 R.0: Approved.
365 R.0 (TSB-22): Approved.
Page 1                        ENCLOSURE 2
 
Other Topics Discussed:
The TSTF OG will propose a program to include in the Technical Specifications to address delayed LCO entry for taking snubbers out of service for routine maintenance. Attachment 3 was provided to the OG to help clarify issues in order to develop the program. [Though not discussed, in parallel to the industry effort TSB will work on a section 3.0 specification to allow for a delay time entry into the Conditions of an LCO.] The intent is to avoid unnecessary entry into TS required actions for supported systems when removing snubbers from service for surveillance testing.
The Staff presented some questions (Attachment 4) regarding BWR plant refueling outage operations, with the intent to resolve concerns about TSTF-225 and BWR STS 3.10.6. The OG will present the questions to industry experts and provide answers to TSB; TSB will review and discuss the answers with SRXB, clarify the concerns, and present the concerns with proposed solutions to the OG; and, if necessary have an NEI-NRR meeting to resolve issues. The Staff will prepare an SE on Perrys proposed adoption of TSTF-225 from the results of this effort.
The production status of Revision 2 to the STS NUREGs was discussed. The plan is to resolve BWR refueling issues and TSTF-360 issues by the end of July 2000, post the final draft STS Rev 2 for industry and public comment by mid August 2000, and receive and incorporate comments by the end of September 2000. Then publish STS Rev 2 in the early Fall of 2000.
TSB-NEI proofing panels will be convened as needed to resolve editorial issues. A discussion on proposed format changes to the STS Rev 2 Table of Contents (TOC) was conducted briefly, with the OG unanimously agreeing that TOC should remain unchanged (Attachment 5, a strawman for the suggested changes was passed out).
The staff and TSTF members discussed the potential of using the consolidated line item improvement process (CLIIP) for the removal of post accident sampling systems (PASS) from the TS of Westinghouse and Combustion Engineering plants. The owners groups for those plants have received safety evaluations for topical reports that justified removing PASS. The owners groups representatives agreed to pursue a TSTF traveler for the removal of PASS.
Following receipt of the proposed TSTF, the staff believes it is in a position (based on the topical reviews) to quickly publish the notice for comment as called for in the CLIIP. The BWR and B&W Owners Groups would likely submit TSTFs and the CLIIP would be used for the remaining plants using a separate activity. Bill Reckley of the staff provided a possible example of an individual licensee's application using the CLIIP for PASS elimination (Attachment 6).
The status of the Risk Informed Technical Specifications (RITS) effort was discussed. The OG has submitted proposal for Initiatives 1 (preferred end states), 2 (revise delay time for entering required actions upon missing a surveillance), and 3 (modify mode restraint logic); Initiative 1 is currently under review by the staff. Revisions to TSTF-358 and TSTF-359 can be expected from the OG in early July. A proposal on Initiative 6 (modify LCO 3.0.3) is expected from the OG by the end of the year.
Participants agreed to conduct a status conference call at 10 AM on June 27, 2000. The next TSTF meeting will be on July 13-14, 2000 at the NRC.
Page 2                              ENCLOSURE 2}}

Latest revision as of 06:41, 24 November 2019

June 13-14, 2000 Meeting Summary Letter to Mr. Davis with Enclosures 1 and 2, Attachments Scanned
ML003725391
Person / Time
Issue date: 06/16/2000
From: Beckner W
Technical Specifications Branch
To: Jennifer Davis
Nuclear Energy Institute
References
Download: ML003725391 (6)


Text

June 16, 2000 Mr. James Davis, Director Operations Department Nuclear Energy Institute 1776 I Street, N. W.

Suite 400 Washington, DC 20006-3708

Dear Mr. Davis:

Enclosed is a summary of our joint NRC/Technical Specifications Task Force (TSTF)

Owners Group meeting at the Nuclear Regulatory Commission in Rockville, Maryland on June 13 and 14, 2000. Should the TSTF have any comments or questions, please do not hesitate to contact me on 301-415-1161 or by e-mail at wdb@nrc.gov.

Sincerely,

/RA/

William D. Beckner, Chief Technical Specifications Branch Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation Project No. 689

Enclosures:

1. Attendee List
2. Summary of Meeting cc: Those on enclosed Attendees List

Nuclear Energy Institute Project No. 689 cc: Mr. Ralph Beedle Ms. Lynnette Hendricks, Director Senior Vice President Plant Support and Chief Nuclear Officer Nuclear Energy Institute Nuclear Energy Institute Suite 400 Suite 400 1776 I Street, NW 1776 I Street, NW Washington, DC 20006-3708 Washington, DC 20006-3708 Mr. Alex Marion, Director Mr. Charles B. Brinkman, Director Programs Washington Operations Nuclear Energy Institute ABB-Combustion Engineering, Inc.

Suite 400 12300 Twinbrook Parkway, Suite 330 1776 I Street, NW Rockville, Maryland 20852 Washington, DC 20006-3708 Mr. David Modeen, Director Engineering Nuclear Energy Institute Suite 400 1776 I Street, NW Washington, DC 20006-3708 Mr. Anthony Pietrangelo, Director Licensing Nuclear Energy Institute Suite 400 1776 I Street, NW Washington, DC 20006-3708 Mr. Hank Sepp, Manager Regulatory and Licensing Engineering Westinghouse Electric Corporation P.O. Box 355 Pittsburgh, Pennsylvania 15230 Mr. Jim Davis, Director Operations Nuclear Energy Institute Suite 400 1776 I Street, NW Washington, DC 20006-3708

June 16, 2000 Mr. James Davis, Director Operations Department Nuclear Energy Institute 1776 I Street, N. W.

Suite 400 Washington, DC 20006-3708

Dear Mr. Davis:

Enclosed is a summary of our joint NRC/Technical Specifications Task Force (TSTF)

Owners Group meeting at the Nuclear Regulatory Commission in Rockville, Maryland on June 13 and 14, 2000. Should the TSTF have any comments or questions, please do not hesitate to contact me on 301-415-1161 or by e-mail at wdb@nrc.gov.

Sincerely,

/RA/

William D. Beckner, Chief Technical Specifications Branch Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation Project No. 689

Enclosures:

1. Attendee List
2. Summary of Meeting cc: Those on enclosed Attendees List DISTRIBUTION:

DBMatthews/SNewberry RTSB Members PUBLIC RTSB R/F WDBeckner JLBirmingham RLDennig ADAMS DOCUMENT NAME: G:\RTSB\TSTF INFO\Owners Group Correspondence\MTGSUM6-13-14.wpd OFFICE RTSB/DRIP RTSB/DRIP RGEB/DRIP SC:RTSB/DRIP C:RTSB/DRIP:NRR NAME TRTjaderTRT LAHillLAH JLBirminghamJLB RLDennigRLD WDBecknerWDB DATE 06/16/00 06/16/00 06/16/00 06/16/00 06/16/00 OFFICIAL RECORD COPY

NRC/TSTF OWNER'S GROUP MEETING June 13 & 14, 2000 ATTENDEES LIST NAME ORGANIZATION B. L. Woods CEOG/San Onofre J. Arbuckle BWROG/WNP2 H. Pontious BWROG/COMED B. Mann EXCEL D. Hoffman EXCEL N. Clarkson BWOG/DUKE S. Wideman WOG/WCNOC W. Beckner NRC/NRR/RTSB R. Dennig NRC/NRR/RTSB J. Birmingham* NRC/NRR T. R. Tjader NRC/NRR/RTSB N. Gilles** NRC/NRR/RTSB C. Schulten NRC/NRR/RTSB Leslie Hill NRC/NRR/RTSB T. Liu* NRC/NRR/RTSB J. Foster* NRC/NRR/RTSB W. Reckley* NRR/PMAS J. Weil* McGraw Hill

  • Attended June 13 only
    • Attended June 14 only ENCLOSURE 1

Technical Specification Task Force Meeting Summary June 13 & 14, 2000 Staff met with the Nuclear Energy Institute Technical Specification Task Force (NEI TSTF) on June 13 & 14, 2000.

The TSTF and staff discussed the status of pending high priority TSTFs as described below. was the pre-meeting status provided by the TSTF and Attachment 2 was the pre-meeting status provided by the staff.

016 R.3: The TSB has the necessary information to complete its review; approval is anticipated.

207 R.5: Approved.

231 R.1: Approved; RPS Instrumentation Bases (B3.3.1.1) correction.

306 R.1: The TSTF will submit Revision 2 to revise the Bases.

330 R.0: The TSTF will submit Revision 1 which will be a solution that is based upon the temperature averaging concept approved for Brunswick.

332 R.0: The TSTF will submit Revision 1 which will implement the topical, Supplement 1 of NEDO-32291 of October 1999, and remove the non-generic cascading issues.

334 R.1: The TSTF will submit Revision 2 to include a reviewers note based upon a related topical, once it is approved .

342 R.1: Approved.

343 R.0: Staff comments have been provided to the TSTF and the TSTF will submit Revision 1 for staff review in the near future (low priority).

355 R.0: The TSTF will submit Revision 1 to make a correction to the RPS Instrumentation Bases (B3.3.3.1).

360 R.0: Staff is reviewing the latest TSTF justifications/submittals.

361 R.0: Approved.

364 R.0: Approved.

365 R.0 (TSB-22): Approved.

Page 1 ENCLOSURE 2

Other Topics Discussed:

The TSTF OG will propose a program to include in the Technical Specifications to address delayed LCO entry for taking snubbers out of service for routine maintenance. Attachment 3 was provided to the OG to help clarify issues in order to develop the program. [Though not discussed, in parallel to the industry effort TSB will work on a section 3.0 specification to allow for a delay time entry into the Conditions of an LCO.] The intent is to avoid unnecessary entry into TS required actions for supported systems when removing snubbers from service for surveillance testing.

The Staff presented some questions (Attachment 4) regarding BWR plant refueling outage operations, with the intent to resolve concerns about TSTF-225 and BWR STS 3.10.6. The OG will present the questions to industry experts and provide answers to TSB; TSB will review and discuss the answers with SRXB, clarify the concerns, and present the concerns with proposed solutions to the OG; and, if necessary have an NEI-NRR meeting to resolve issues. The Staff will prepare an SE on Perrys proposed adoption of TSTF-225 from the results of this effort.

The production status of Revision 2 to the STS NUREGs was discussed. The plan is to resolve BWR refueling issues and TSTF-360 issues by the end of July 2000, post the final draft STS Rev 2 for industry and public comment by mid August 2000, and receive and incorporate comments by the end of September 2000. Then publish STS Rev 2 in the early Fall of 2000.

TSB-NEI proofing panels will be convened as needed to resolve editorial issues. A discussion on proposed format changes to the STS Rev 2 Table of Contents (TOC) was conducted briefly, with the OG unanimously agreeing that TOC should remain unchanged (Attachment 5, a strawman for the suggested changes was passed out).

The staff and TSTF members discussed the potential of using the consolidated line item improvement process (CLIIP) for the removal of post accident sampling systems (PASS) from the TS of Westinghouse and Combustion Engineering plants. The owners groups for those plants have received safety evaluations for topical reports that justified removing PASS. The owners groups representatives agreed to pursue a TSTF traveler for the removal of PASS.

Following receipt of the proposed TSTF, the staff believes it is in a position (based on the topical reviews) to quickly publish the notice for comment as called for in the CLIIP. The BWR and B&W Owners Groups would likely submit TSTFs and the CLIIP would be used for the remaining plants using a separate activity. Bill Reckley of the staff provided a possible example of an individual licensee's application using the CLIIP for PASS elimination (Attachment 6).

The status of the Risk Informed Technical Specifications (RITS) effort was discussed. The OG has submitted proposal for Initiatives 1 (preferred end states), 2 (revise delay time for entering required actions upon missing a surveillance), and 3 (modify mode restraint logic); Initiative 1 is currently under review by the staff. Revisions to TSTF-358 and TSTF-359 can be expected from the OG in early July. A proposal on Initiative 6 (modify LCO 3.0.3) is expected from the OG by the end of the year.

Participants agreed to conduct a status conference call at 10 AM on June 27, 2000. The next TSTF meeting will be on July 13-14, 2000 at the NRC.

Page 2 ENCLOSURE 2