{{#Wiki_filter:I 0o9 UNITED STATES G X 5pr sf g NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 NN' 2 1 1994 MEMORANDUM FOR: Those on Attached List FROM: Carl J. Paperiello, Director Division of Industrial and Medical Nuclear Safety, NMSS  
{{#Wiki_filter:I 0o9 5pr sf g UNITED STATES NUCLEAR REGULATORY COMMISSION G      X WASHINGTON, D. C. 20555 NN' 2 1 1994 MEMORANDUM FOR:   Those on Attached List FROM:             Carl J. Paperiello, Director Division of Industrial and Medical Nuclear Safety, NMSS


==SUBJECT:==
==SUBJECT:==
POLICY AND GUIDANCE DIRECTIVE FC-94-02.
POLICY AND GUIDANCE DIRECTIVE FC-94-02. LICENSING SITE REMEDIATION CONTRACTORS FOR WORK AT TEMPORARY JOB SITES The final policy and guidance directive on licensing site remediation contractors for work at temporary job sites is enclosed for your use.
LICENSING SITE REMEDIATION CONTRACTORS FOR WORK AT TEMPORARY JOB SITES The final policy and guidance directive on licensing site remediation contractors for work at temporary job sites is enclosed for your use.Regional comments have been incorporated as appropriate.
Regional comments have been incorporated as appropriate. We have clarified that the guidance is intended for site remediation service contractors. We have also clarified our position that a site owner remains responsible for eventual release of a site regardless of who the owner hires to perform specific activities. The final guidance allows contractors to possess calibration sources, reference standards, and contaminated equipment owned by the contractor, and it increases the advance notification requirement to 14 days before initiating activities at a temporary job site. In addition, the emergency response conditions were revised to clearly authorize reasonable emergency response actions that depart from conditions in the license if NRC is notified immediately after such action is taken.
We have clarified that the guidance is intended for site remediation service contractors.
Please note that we have requested OMB clearance for the reporting and recordkeeping requirements in this directive, but OMB approval is still pending. Any licensing actions involving this directive should be submitted to Headquarters for concurrence until OMB approval is received.
We have also clarified our position that a site owner remains responsible for eventual release of a site regardless of who the owner hires to perform specific activities.
If you have any questions, please contact Kevin Ramsey at (301) 504-2534.
The final guidance allows contractors to possess calibration sources, reference standards, and contaminated equipment owned by the contractor, and it increases the advance notification requirement to 14 days before initiating activities at a temporary job site. In addition, the emergency response conditions were revised to clearly authorize reasonable emergency response actions that depart from conditions in the license if NRC is notified immediately after such action is taken.Please note that we have requested OMB clearance for the reporting and recordkeeping requirements in this directive, but OMB approval is still pending. Any licensing actions involving this directive should be submitted to Headquarters for concurrence until OMB approval is received.If you have any questions, please contact Kevin Ramsey at (301) 504-2534.Carl J. Paperiello, Director Division of Industrial and Medical Nuclear Safety, NMSS  
Carl J. Paperiello, Director Division of Industrial and Medical Nuclear Safety, NMSS


==Enclosure:==
==Enclosure:==
As stated


As stated wJA 2 1 19941 MEMORANDUM FOR: Those on Attached List FROM: Carl J. Paperiello, Director Division of Industrial and Medical Nuclear Safety, NMSS  
wJA2 1 19941 MEMORANDUM FOR:     Those on Attached List FROM:               Carl J. Paperiello, Director Division of Industrial and Medical Nuclear Safety, NMSS


==SUBJECT:==
==SUBJECT:==
POLICY AND GUIDANCE DIRECTIVE FC 94-O , LICENSING SITE REMEDIATION CONTRACTORS FOR WORK AT TEMPORARY JOB SITES The final policy and guidance directive on licensing site remediation contractors for work at temporary job sites is enclosed for your use.Regional comments have been incorporated as appropriate.
POLICY AND GUIDANCE DIRECTIVE FC 94-O , LICENSING SITE REMEDIATION CONTRACTORS FOR WORK AT TEMPORARY JOB SITES The final policy and guidance directive on licensing site remediation contractors for work at temporary job sites is enclosed for your use.
We have clarified that the guidance is intended for site remedlation service contractors.
Regional comments have been incorporated as appropriate. We have clarified that the guidance is intended for site remedlation service contractors. We have also clarified our position that a site owner remains responsible for eventual release of a site regardless of who the owner hires to perform specific activities. The final guidance allows contractors to possess calibration sources, reference standards, and contaminated equipment owned by the contractor, and it increases the advance notification requirement to 14 days before initiating activities at a temporary job site. In addition, the emergency response conditions were revised to clearly authorize reasonable emergency response actions that depart from conditions in the license if NRC is notified immediately after such action is taken.
We have also clarified our position that a site owner remains responsible for eventual release of a site regardless of who the owner hires to perform specific activities.
Please note that we have requested OMB clearance for the reporting and recordkeeping requirements in this directive, but OMB approval is still pending. Any licensing actions involving this directive should be submitted to Headquarters for concurrence until OMB approval is received.
The final guidance allows contractors to possess calibration sources, reference standards, and contaminated equipment owned by the contractor, and it increases the advance notification requirement to 14 days before initiating activities at a temporary job site. In addition, the emergency response conditions were revised to clearly authorize reasonable emergency response actions that depart from conditions in the license if NRC is notified immediately after such action is taken.Please note that we have requested OMB clearance for the reporting and recordkeeping requirements in this directive, but OMB approval is still pending. Any licensing actions involving this directive should be submitted to Headquarters for concurrence until OMB approval is received.If you have any questions, please contact Kevin Ramsey at (301) 504-2534.Original ;3gned by Carl J. Paperiello, Director Division of Industrial and Medical Nuclear Safety, NMSS  
If you have any questions, please contact Kevin Ramsey at (301) 504-2534.
Original ;3gned by Carl J. Paperiello, Director Division of Industrial and Medical Nuclear Safety, NMSS


==Enclosure:==
==Enclosure:==
As stated OFC        I IMOO;    I    IMjI      IX                _____                _          F FR NAME    KRamsey/ll      G    gburn                  _s___ __n_        JG  e"\s    R rnett DATE    2/2/'/93      //2&?ri93    ti i    9 t/i  r        93      2  _/?/93 f  </9  \/93 OFC      IMN0t1        I      A NAME      EW ch      CPei ello                      _                          __
w      t /lk/93        l fd 93 C  COVER              E COVER & ENCLOSURE                  N ENO COPY OFFICIAL RECORD COPY: G:PGDMEMO.KMR


As stated OFC IMOO; I I IMjI IX _____ _ FR F NAME KRamsey/ll G gburn _s ___ __n_ JG e"\s R rnett DATE 2/2/'/93 //2&?ri 9 3 ti i 9 t/i r 93 2 _/?/93 f </9 \/93 OFC IMN0t1 I A NAME EW ch CPei _ ello __w t /lk/93 l f d 93 C COVER E COVER & ENCLOSURE N ENO COPY OFFICIAL RECORD COPY: G:PGDMEMO.KMR L.-JfRIBUTION FOR P&G FC 94-02. January 21 1994 DISTRIBUTION:
L.-JfRIBUTION FOR P&G FC 94-02. January 21 1994 DISTRIBUTION:
HARD COPY RBellamy, RI DCollins, RII RCaniano, RIII DWChamberlain, RIV GYuhas, RV RFonner, OGC STreby, OGC JSurmeier, OSP NMSS r/f IMNS r/f IMOB r/f RII Navy Project Man.RIV Air Force Project Man.NRC File Center CEstep (orig. & all concs)HPDatabase, IMOB BJHolt, RIII E-MAIL ONLY: Y:\WPO\GRP\P&GD.GRP MShanbacky, RI JJohansen, RI FCostello, RI JKinneman, RI CHosey, RII JPotter, RII JPelchat, RII GShear, RIII GMcCann, RIII JMadera, RIII CCain, RIV WFisher, RIV LMcLean, RIV BPrange, RV JRicci,AEOD/TTC JCunningham,NRR JEGlenn, IMAB LWCamper, IMAB JPiccone, IMAB CHaughney FSturz EEaston RBaer SBaggett JJankovich FCombs, IMOB CJones, IMOB GPangburn, IMOB MMoriartv.
HARD COPY RBellamy, RI DCollins, RII RCaniano, RIII DWChamberlain, RIV GYuhas, RV RFonner, OGC STreby, OGC JSurmeier, OSP NMSS r/f IMNS r/f IMOB r/f RII Navy Project Man.
IMOB POLICY AND GUIDANCE DIRECTIVE FC 94-02 LICENSING SITE REMEDIATION CONTRACTORS FOR WORK AT TEMPORARY JOB SITES rp A ^nn n^. n PREPARED BY: Q CONCURRENCE:
RIV Air Force Project Man.
4 Kevin Ramsey, IMOB John Greeves, LLWM 1 4 REVIEWED BY: CONCURREN George Panburn67IMOB 7 5 Robert Burnett, FCSS 'V5 -l REVIEWED BY: > NO LEGAL OBJECTION: , ' lFred Combs, IMOBt Stewart Treby, OGC'/ CONCURRENCE:
NRC File Center CEstep (orig. & all concs)
7 Q APPRO ED BY 9 q John Glenn, IMAB Carl Paperiello, IMNS Enclosure List of Effective PaQes Page cover i 1 2 3 4 Al A2 i Fr oa-n7 RV n Revision 0 0 0 0 0 0 0 0 LICENSING SITE REMEDIATION CONTRACTORS FOR WORK AT TEMPORARY JOB SITES 1. Purpose: The purpose of this directive is to establish the policy and guidance for authorizing service contractors to perform site remediation work under their own license at temporary job sites. This directive applies to temporary job sites owned/operated by other NRC licensees, as well as non-licensees.
HPDatabase, IMOB BJHolt, RIII E-MAIL ONLY:
This directive may be used on a case-by-case basis with HQ concurrence to license other types of service contractors.
Y:\WPO\GRP\P&GD.GRP MShanbacky, RI JJohansen, RI FCostello, RI JKinneman, RI CHosey, RII JPotter, RII JPelchat, RII GShear, RIII GMcCann, RIII JMadera, RIII CCain, RIV WFisher, RIV LMcLean, RIV BPrange, RV JRicci,AEOD/TTC JCunningham,NRR JEGlenn, IMAB LWCamper, IMAB JPiccone, IMAB CHaughney FSturz EEaston RBaer SBaggett JJankovich FCombs, IMOB CJones, IMOB GPangburn, IMOB MMoriartv. IMOB
However, this directive does not apply to the installation and maintenance of devices.2. Policy: Site owners/operators may not have radiation safety programs in place that are adequate to ensure the safety of activities to be performed by a service contractor.
 
Therefore, it is appropriate for contractors to operate under their own license at temporary Job sites when they are providing the radiation safety programs under which the work is being performed.
POLICY AND GUIDANCE DIRECTIVE FC 94-02 LICENSING SITE REMEDIATION CONTRACTORS FOR WORK AT TEMPORARY JOB SITES PREPARED BY:     Q                     CONCURRENCE: 4 Kevin Ramsey, IMOB                       John Greeves, LLWM 1 4 REVIEWED BY:                             CONCURREN George Panburn67IMOB         7   5       Robert Burnett, FCSS         -'V5 REVIEWED BY:
This ensures that site owners/operators do not supervise activities with which they have no experience.
l                        >             NO LEGAL OBJECTION:     ,     '
It also allows the NRC to authorize work without issuing a new license or amending an existing license, and it allows enforcement actions directly against contractors when violations are associated with their radiation safety programs.
lFred Combs, IMOBt                       Stewart Treby, OGC'/
However, the site owner remains responsible for decommissioning financial assurance (if a licensee) and eventual release of the site regardless of who the owner hires to perform specific activities.
CONCURRENCE:         7 Q                 APPRO ED BY     9         q John Glenn, IMAB                         Carl Paperiello, IMNS rp  A ^nn  n^. n                                                  Enclosure
: 3. General Guidance: In general, applications for site remediation service licenses should be made in accordance with the regulations and guidance applicable to the authorized 1 FC 94-02. Rev. 0 use requested.
 
For example, an application for broad authorization to handle a wide variety of radioactive materials during site remediation should be in accordance with 10 CFR Part 33 and Regulatory Guide 10.5, Applications for Type A Licenses of Broad Scope. In addition to the existing regulations and guidance, the specific provisions provided below should be addressed.
List of Effective PaQes Page             Revision cover                 0 i                     0 1                     0 2                     0 3                     0 4                     0 Al                   0 A2                   0 i
: 4. Specific Guidance: 4.1 A site remediation service license may authorize the use of licensed material onlv at temporary Job sites in the United States where NRC maintains urisdiction.
Fr oa-n7 RV n
Possession or use of materials at the service contractor's facilities must be authorized under a separate license. In addition, possession should be authorized nly to the extent that licensed material originating from the site must be transferred to an authorized recipient or left at the site. Possession (at the temporary job site) of calibration sources, reference standards, and contaminated equipment owned by the licensee may be authorized under the service license. See example license condition 1 in the appendix.4.2 The licensee should be required to notify the Administrator of the region issuing the license at least 14 days before initiating activities at a temporary job site. See example license condition 2 in the appendix.4.3 If the site owner/operator (i.e., the customer) also holds a license issued by the NRC or an Agreement State, the service licensee should be required to establish a written agreement between the licensee and the customer specifying which licensee activities will be performed under the customer's license and supervision, and which licensee activities will be performed under the licensee's supervision pursuant to the service license. This agreement should include commitments by both licensees to ensure safety and it should specify whether there are any commitments by the service licnsee to help the customer clean up the temporary job site if there is an accident.
 
See example license condition 3 in the appendix.2 Frc Q4-n Rpv. n 4.4 The service licensee should maintain records of information important to decommissioning a temporary job site at the site pursuant to 10 CFR 30.35(g), 40.36(f), and 70.25(g).
LICENSING SITE REMEDIATION CONTRACTORS FOR WORK AT TEMPORARY JOB SITES
Customers should have access to decommissioning records throughout the decommissioning process. The service licensee should transfer these records to the customer when activities at a temporary job site are complete.
: 1. Purpose:
See example license condition 4 in the appendix.4.5 A service licensee may be exempted from the requirements in 10 CFR 30.35, 40.36, and 70.25 to establish decommissioning financial assurance.
The purpose of this directive is to establish the policy and guidance for authorizing service contractors to perform site remediation work under their own license at temporary job sites. This directive applies to temporary job sites owned/operated by other NRC licensees, as well as non-licensees. This directive may be used on a case-by-case basis with HQ concurrence to license other types of service contractors. However, this directive does not apply to the installation and maintenance of devices.
NMSS has made a finding that this exemption will not endanger life, or property, or the common defense and security, and is otherwise in the public interest.
: 2. Policy:
This exemption is based on the provision stated above in 4.1 that the service licensee is not allowed to retain possession of any licensed material originating from a temporary job site. The site owner remains responsible for eventual release of the site regardless of who monitors and supervises specific work activities.
Site owners/operators may not have radiation safety programs in place that are adequate to ensure the safety of activities to be performed by a service contractor. Therefore, it is appropriate for contractors to operate under their own license at temporary Job sites when they are providing the radiation safety programs under which the work is being performed. This ensures that site owners/operators do not supervise activities with which they have no experience. It also allows the NRC to authorize work without issuing a new license or amending an existing license, and it allows enforcement actions directly against contractors when violations are associated with their radiation safety programs. However, the site owner remains responsible for decommissioning financial assurance (if a licensee) and eventual release of the site regardless of who the owner hires to perform specific activities.
If the site owner is a licensee that has established decommissioning financial assurance or other license commitments, the site owner is responsible for ensuring that its contractors comply with those commitments.
: 3. General Guidance:
See example license condition 5 in the appendix.4.6 An application for a service license is not required to contain an emergency plan even if the application requests authorization to use licensed material in quantities exceeding the threshold for an emergency plan. Service licensees are not in a position to establish all of the site-specific response measures necessary to execute an effective emergency plan for a temporary job site. Before handling licensed material at any one site in quantities requiring an emergency plan, the service licensee must either obtain NRC approval of an evaluation demonstrating that an emergency plan is not required, or submit written confirmation that licensee personnel have been trained and will follow an existing emergency plan for the temporary job site. See example license condition 6 in the appendix.3 FC q4U-2. RAY. 0 4.7 It is in the public interest to have site remediation service licensees who can provide immediate services in the event of a release or other incident involving uncontrolled radioactive material.
In general, applications for site remediation service licenses should be made in accordance with the regulations and guidance applicable to the authorized 1
However, license conditions require service licensees to establish written agreements and provide advance notification before providing services.
FC 94-02. Rev. 0
Service licensees may be authorized to take reasonable action in an emergency that departs from conditions in the license when the action s immediately needed to protect public health and safety and no action consistent with all license conditions that can provide adequate or equivalent protection is immediately apparent.
 
The licensee should notify the NRC before, if practicable, and in any case immediately after taking such emergency action. See example license condition 7 in the appendix.4.8 Within 30 days of completing activities at each temporary job site, the service licensee must notify its licensing region. The notification should include the status of the temporary job site and the disposition of the material used by the service licensee.
use requested. For example, an application for broad authorization to handle a wide variety of radioactive materials during site remediation should be in accordance with 10 CFR Part 33 and Regulatory Guide 10.5, Applications for Type A Licenses of Broad Scope. In addition to the existing regulations and guidance, the specific provisions provided below should be addressed.
See example license condition 8 in the appendix.4.9 Service licenses are not temporary licenses that are only in effect while work at a temporary job site is in progress.
: 4. Specific Guidance:
The applicant must make a clear commitment to maintain all radiation safety programs in an active status even between jobs. Service licensees may not suspend radiation programs and then attempt to re-establish them when another customer is found. This commitment should provide reasonable assurance that the licensee will remain competent to use licensed material and undertake authorized activities.
4.1 A site remediation service license may authorize the use of licensed material onlv at temporary Job sites in the United States where NRC maintains urisdiction. Possession or use of materials at the service contractor's facilities must be authorized under a separate license. In addition, possession should be authorized nly to the extent that licensed material originating from the site must be transferred to an authorized recipient or left at the site. Possession (at the temporary job site) of calibration sources, reference standards, and contaminated equipment owned by the licensee may be authorized under the service license. See example license condition 1 in the appendix.
This commitment should include the following:
4.2 The licensee should be required to notify the Administrator of the region issuing the license at least 14 days before initiating activities at a temporary job site. See example license condition 2 in the appendix.
A. Maintaining qualified personnel in key positions (i.e., RSO, etc.).B. Holding required safety committee meetings.C. Performing regular maintenance and calibration of safety equipment.
4.3 If the site owner/operator (i.e., the customer) also holds a license issued by the NRC or an Agreement State, the service licensee should be required to establish a written agreement between the licensee and the customer specifying which licensee activities will be performed under the customer's license and supervision, and which licensee activities will be performed under the licensee's supervision pursuant to the service license. This agreement should include commitments by both licensees to ensure safety and it should specify whether there are any commitments by the service licnsee to help the customer clean up the temporary job site if there is an accident. See example license condition 3 in the appendix.
2 Frc Q4-n   Rpv. n
 
4.4   The service licensee should maintain records of information important to decommissioning a temporary job site at the site pursuant to 10 CFR 30.35(g), 40.36(f), and 70.25(g). Customers should have access to decommissioning records throughout the decommissioning process. The service licensee should transfer these records to the customer when activities at a temporary job site are complete. See example license condition 4 in the appendix.
4.5   A service licensee may be exempted from the requirements in 10 CFR 30.35, 40.36, and 70.25 to establish decommissioning financial assurance. NMSS has made a finding that this exemption will not endanger life, or property, or the common defense and security, and is otherwise in the public interest. This exemption is based on the provision stated above in 4.1 that the service licensee is not allowed to retain possession of any licensed material originating from a temporary job site. The site owner remains responsible for eventual release of the site regardless of who monitors and supervises specific work activities. If the site owner is a licensee that has established decommissioning financial assurance or other license commitments, the site owner is responsible for ensuring that its contractors comply with those commitments. See example license condition 5 in the appendix.
4.6 An application for a service license is not required to contain an emergency plan even if the application requests authorization to use licensed material in quantities exceeding the threshold for an emergency plan. Service licensees are not in a position to establish all of the site-specific response measures necessary to execute an effective emergency plan for a temporary job site. Before handling licensed material at any one site in quantities requiring an emergency plan, the service licensee must either obtain NRC approval of an evaluation demonstrating that an emergency plan is not required, or submit written confirmation that licensee personnel have been trained and will follow an existing emergency plan for the temporary job site. See example license condition 6 in the appendix.
3 FC q4U-2. RAY. 0
 
4.7   It is in the public interest to have site remediation service licensees who can provide immediate services in the event of a release or other incident involving uncontrolled radioactive material. However, license conditions require service licensees to establish written agreements and provide advance notification before providing services. Service licensees may be authorized to take reasonable action in an emergency that departs from conditions in the license when the action s immediately needed to protect public health and safety and no action consistent with all license conditions that can provide adequate or equivalent protection is immediately apparent. The licensee should notify the NRC before, if practicable, and in any case immediately after taking such emergency action. See example license condition 7 in the appendix.
4.8 Within 30 days of completing activities at each temporary job site, the service licensee must notify its licensing region. The notification should include the status of the temporary job site and the disposition of the material used by the service licensee. See example license condition 8 in the appendix.
4.9 Service licenses are not temporary licenses that are only in effect while work at a temporary job site is in progress. The applicant must make a clear commitment to maintain all radiation safety programs in an active status even between jobs. Service licensees may not suspend radiation programs and then attempt to re-establish them when another customer is found. This commitment should provide reasonable assurance that the licensee will remain competent to use licensed material and undertake authorized activities. This commitment should include the following:
A. Maintaining qualified personnel in key positions (i.e., RSO, etc.).
B. Holding required safety committee meetings.
C. Performing regular maintenance and calibration of safety equipment.
D. Completing required training (including periodic retraining).
D. Completing required training (including periodic retraining).
4 FC Q4-02. Rev. 0 Appendix EXAMPLE LICENSE CONDITIONS FOR SERVICE LICENSES 1. Licensed materials shall be used only at temporary job sites of the licensee anywhere in the United States where the U.S. Nuclear Regulatory Commission maintains jurisdiction for regulating the use of licensed material.
4 FC Q4-02. Rev. 0
Except for calibration sources, reference standards, and radioactively contaminated equipment owned by the licensee, possession of licensed material at each temporary job site shall be limited to material originating from each site.This material must either be transferred to an authorized recipient or remain at the site after licensee activities are completed.
 
: 2. The licensee shall notify the Regional Administrator, NRC Region in writing at least 14 days before initiating activities under this license at a temporary job site. This notification shall include: A. The estimated type, quantity, and physical/chemical forms of licensed material to be used, B. The specific site location, C. A description of planned activities including waste management and disposition, D. The estimated start date and completion date for the job, and E. The name and title of a point of contact for the job, including information on how to contact the individual.
Appendix EXAMPLE LICENSE CONDITIONS FOR SERVICE LICENSES
: 3. This license does not authorize the use of licensed material at temporary job sites for uses already specifically authorized by a customer's license. If a customer also holds a license issued by the NRC or an Agreement State, the licensee shall establish a written agreement between the licensee and the customer specifying which licensee activities shall be performed under the customer's license and supervision, and which licensee activities shall be performed under the licensee's supervision pursuant to this license. The agreement shall include a commitment by the licensee and the customer to ensure safety, and any commitments by the licensee to help the customer clean up the temporary job site if there is an accident.
: 1. Licensed materials shall be used only at temporary job sites of the licensee anywhere in the United States where the U.S. Nuclear Regulatory Commission maintains jurisdiction for regulating the use of licensed material. Except for calibration sources, reference standards, and radioactively contaminated equipment owned by the licensee, possession of licensed material at each temporary job site shall be limited to material originating from each site.
A copy of this agreement shall be included in the notification required by license condition
This material must either be transferred to an authorized recipient or remain at the site after licensee activities are completed.
[example 2 above].4. The licensee shall maintain records of information important to decommissioning each temporary job site at the applicable job site pursuant to 10 CFR 30.35(g), 40.36(f), and 70.25(g).
: 2. The licensee shall notify the Regional Administrator, NRC Region     in writing at least 14 days before initiating activities under this license at a temporary job site. This notification shall include:
The records shall be made available to the customer upon request. At the completion of activities at a temporary job site, the licensee shall transfer these records to the customer for retention.
A. The estimated type, quantity, and physical/chemical forms of licensed material to be used, B. The specific site location, C. A description of planned activities including waste management and disposition, D. The estimated start date and completion date for the job, and E. The name and title of a point of contact for the job, including information on how to contact the individual.
: 3. This license does not authorize the use of licensed material at temporary job sites for uses already specifically authorized by a customer's license. If a customer also holds a license issued by the NRC or an Agreement State, the licensee shall establish a written agreement between the licensee and the customer specifying which licensee activities shall be performed under the customer's license and supervision, and which licensee activities shall be performed under the licensee's supervision pursuant to this license. The agreement shall include a commitment by the licensee and the customer to ensure safety, and any commitments by the licensee to help the customer clean up the temporary job site if there is an accident. A copy of this agreement shall be included in the notification required by license condition [example 2 above].
: 4. The licensee shall maintain records of information important to decommissioning each temporary job site at the applicable job site pursuant to 10 CFR 30.35(g), 40.36(f), and 70.25(g). The records shall be made available to the customer upon request. At the completion of activities at a temporary job site, the licensee shall transfer these records to the customer for retention.
Al FC 94 Rv.
Al FC 94 Rv.
: 5. Pursuant to 10 CFR 30.11, 40.14, 70.14, and license condition example 1 above], the licensee is exempted from the requirements of 10 CFR 30.35, 40.36, and 70.25 to establish decommissioning financial assurance.
: 5. Pursuant to 10 CFR 30.11, 40.14, 70.14, and license condition example 1 above], the licensee is exempted from the requirements of 10 CFR 30.35, 40.36, and 70.25 to establish decommissioning financial assurance.
: 6. Notwithstanding the requirements in 10 CFR 30.32(i), 40.31(j), and 70.22(i), the licensee is not required to establish an emergency plan. Before taking possession of licensed material at a temporary job site in quantities requiring an emergency plan the licensee shall either --A. Obtain NRC approval of an evaluation demonstrating that an emergency plan is not required pursuant to 10 CFR 30.32(i), 40.31(j), and 70.22(i), or B. Submit written confirmation to the Regional Administrator, NRC Region , that licensee personnel have been trained and will follow the provisions of an existing emergency plan approved by the NRC or an Agreement State for the temporary job site.7. If approved by a Radiation Safety Officer specifically identified in this license, the licensee may take reasonable action in an emergency that departs from conditions in this license when the action is immediately needed to protect public health and safety and no action consistent with all license conditions that can provide adequate or equivalent protection is immediately apparent.
: 6. Notwithstanding the requirements in 10 CFR 30.32(i), 40.31(j), and 70.22(i),
The licensee shall notify the NRC before, if practicable, and in any case immediately after taking such emergency action using the reporting procedure specified in 10 CFR 30.50(c).8. Within 30 days of completing activities at each job site location, the licensee shall notify the Regional Administrator, Region _, in writing of the temporary job site status and the disposition of any licensed material used.A2 rr GA-n R n}}
the licensee is not required to establish an emergency plan. Before taking possession of licensed material at a temporary job site in quantities requiring an emergency plan the licensee shall either --
A. Obtain NRC approval of an evaluation demonstrating that an emergency plan is not required pursuant to 10 CFR 30.32(i), 40.31(j), and 70.22(i), or B. Submit written confirmation to the Regional Administrator, NRC Region   , that licensee personnel have been trained and will follow the provisions of an existing emergency plan approved by the NRC or an Agreement State for the temporary job site.
: 7. If approved by a Radiation Safety Officer specifically identified in this license, the licensee may take reasonable action in an emergency that departs from conditions in this license when the action is immediately needed to protect public health and safety and no action consistent with all license conditions that can provide adequate or equivalent protection is immediately apparent. The licensee shall notify the NRC before, if practicable, and in any case immediately after taking such emergency action using the reporting procedure specified in 10 CFR 30.50(c).
: 8. Within 30 days of completing activities at each job site location, the licensee shall notify the Regional Administrator, Region _,   in writing of the temporary job site status and the disposition of any licensed material used.
A2 rr GA-n   R   n}}

Revision as of 02:47, 24 November 2019

Policy and Guidance Directive 04-04, Licensing Site Remediation Contractors for Work at Temporary Job Site (Formerly Pgd Fc 94-02)
ML031750703
Person / Time
Issue date: 01/21/1994
From: Paperiello C
NRC/NMSS/IMNS
To: Bellamy R, Caniano R, Chamberlain D, Dan Collins, Estep C, Fonner R, Holt B, Surmeier J, Treby S, Yuhas G
NRC/NMSS/IMNS, NRC/OGC, NRC Region 1, NRC/RGN-II, NRC/RGN-III, NRC Region 4, NRC/STP
References
PG 4-04 FC 94-02
Download: ML031750703 (11)


Text

I 0o9 5pr sf g UNITED STATES NUCLEAR REGULATORY COMMISSION G X WASHINGTON, D. C. 20555 NN' 2 1 1994 MEMORANDUM FOR: Those on Attached List FROM: Carl J. Paperiello, Director Division of Industrial and Medical Nuclear Safety, NMSS

SUBJECT:

POLICY AND GUIDANCE DIRECTIVE FC-94-02. LICENSING SITE REMEDIATION CONTRACTORS FOR WORK AT TEMPORARY JOB SITES The final policy and guidance directive on licensing site remediation contractors for work at temporary job sites is enclosed for your use.

Regional comments have been incorporated as appropriate. We have clarified that the guidance is intended for site remediation service contractors. We have also clarified our position that a site owner remains responsible for eventual release of a site regardless of who the owner hires to perform specific activities. The final guidance allows contractors to possess calibration sources, reference standards, and contaminated equipment owned by the contractor, and it increases the advance notification requirement to 14 days before initiating activities at a temporary job site. In addition, the emergency response conditions were revised to clearly authorize reasonable emergency response actions that depart from conditions in the license if NRC is notified immediately after such action is taken.

Please note that we have requested OMB clearance for the reporting and recordkeeping requirements in this directive, but OMB approval is still pending. Any licensing actions involving this directive should be submitted to Headquarters for concurrence until OMB approval is received.

If you have any questions, please contact Kevin Ramsey at (301) 504-2534.

Carl J. Paperiello, Director Division of Industrial and Medical Nuclear Safety, NMSS

Enclosure:

As stated

wJA2 1 19941 MEMORANDUM FOR: Those on Attached List FROM: Carl J. Paperiello, Director Division of Industrial and Medical Nuclear Safety, NMSS

SUBJECT:

POLICY AND GUIDANCE DIRECTIVE FC 94-O , LICENSING SITE REMEDIATION CONTRACTORS FOR WORK AT TEMPORARY JOB SITES The final policy and guidance directive on licensing site remediation contractors for work at temporary job sites is enclosed for your use.

Regional comments have been incorporated as appropriate. We have clarified that the guidance is intended for site remedlation service contractors. We have also clarified our position that a site owner remains responsible for eventual release of a site regardless of who the owner hires to perform specific activities. The final guidance allows contractors to possess calibration sources, reference standards, and contaminated equipment owned by the contractor, and it increases the advance notification requirement to 14 days before initiating activities at a temporary job site. In addition, the emergency response conditions were revised to clearly authorize reasonable emergency response actions that depart from conditions in the license if NRC is notified immediately after such action is taken.

Please note that we have requested OMB clearance for the reporting and recordkeeping requirements in this directive, but OMB approval is still pending. Any licensing actions involving this directive should be submitted to Headquarters for concurrence until OMB approval is received.

If you have any questions, please contact Kevin Ramsey at (301) 504-2534.

Original ;3gned by Carl J. Paperiello, Director Division of Industrial and Medical Nuclear Safety, NMSS

Enclosure:

As stated OFC I IMOO; I IMjI IX _____ _ F FR NAME KRamsey/ll G gburn _s___ __n_ JG e"\s R rnett DATE 2/2/'/93 //2&?ri93 ti i 9 t/i r 93 2 _/?/93 f </9 \/93 OFC IMN0t1 I A NAME EW ch CPei ello _ __

w t /lk/93 l fd 93 C COVER E COVER & ENCLOSURE N ENO COPY OFFICIAL RECORD COPY: G:PGDMEMO.KMR

L.-JfRIBUTION FOR P&G FC 94-02. January 21 1994 DISTRIBUTION:

HARD COPY RBellamy, RI DCollins, RII RCaniano, RIII DWChamberlain, RIV GYuhas, RV RFonner, OGC STreby, OGC JSurmeier, OSP NMSS r/f IMNS r/f IMOB r/f RII Navy Project Man.

RIV Air Force Project Man.

NRC File Center CEstep (orig. & all concs)

HPDatabase, IMOB BJHolt, RIII E-MAIL ONLY:

Y:\WPO\GRP\P&GD.GRP MShanbacky, RI JJohansen, RI FCostello, RI JKinneman, RI CHosey, RII JPotter, RII JPelchat, RII GShear, RIII GMcCann, RIII JMadera, RIII CCain, RIV WFisher, RIV LMcLean, RIV BPrange, RV JRicci,AEOD/TTC JCunningham,NRR JEGlenn, IMAB LWCamper, IMAB JPiccone, IMAB CHaughney FSturz EEaston RBaer SBaggett JJankovich FCombs, IMOB CJones, IMOB GPangburn, IMOB MMoriartv. IMOB

POLICY AND GUIDANCE DIRECTIVE FC 94-02 LICENSING SITE REMEDIATION CONTRACTORS FOR WORK AT TEMPORARY JOB SITES PREPARED BY: Q CONCURRENCE: 4 Kevin Ramsey, IMOB John Greeves, LLWM 1 4 REVIEWED BY: CONCURREN George Panburn67IMOB 7 5 Robert Burnett, FCSS -'V5 REVIEWED BY:

l > NO LEGAL OBJECTION: , '

lFred Combs, IMOBt Stewart Treby, OGC'/

CONCURRENCE: 7 Q APPRO ED BY 9 q John Glenn, IMAB Carl Paperiello, IMNS rp A ^nn n^. n Enclosure

List of Effective PaQes Page Revision cover 0 i 0 1 0 2 0 3 0 4 0 Al 0 A2 0 i

Fr oa-n7 RV n

LICENSING SITE REMEDIATION CONTRACTORS FOR WORK AT TEMPORARY JOB SITES

1. Purpose:

The purpose of this directive is to establish the policy and guidance for authorizing service contractors to perform site remediation work under their own license at temporary job sites. This directive applies to temporary job sites owned/operated by other NRC licensees, as well as non-licensees. This directive may be used on a case-by-case basis with HQ concurrence to license other types of service contractors. However, this directive does not apply to the installation and maintenance of devices.

2. Policy:

Site owners/operators may not have radiation safety programs in place that are adequate to ensure the safety of activities to be performed by a service contractor. Therefore, it is appropriate for contractors to operate under their own license at temporary Job sites when they are providing the radiation safety programs under which the work is being performed. This ensures that site owners/operators do not supervise activities with which they have no experience. It also allows the NRC to authorize work without issuing a new license or amending an existing license, and it allows enforcement actions directly against contractors when violations are associated with their radiation safety programs. However, the site owner remains responsible for decommissioning financial assurance (if a licensee) and eventual release of the site regardless of who the owner hires to perform specific activities.

3. General Guidance:

In general, applications for site remediation service licenses should be made in accordance with the regulations and guidance applicable to the authorized 1

FC 94-02. Rev. 0

use requested. For example, an application for broad authorization to handle a wide variety of radioactive materials during site remediation should be in accordance with 10 CFR Part 33 and Regulatory Guide 10.5, Applications for Type A Licenses of Broad Scope. In addition to the existing regulations and guidance, the specific provisions provided below should be addressed.

4. Specific Guidance:

4.1 A site remediation service license may authorize the use of licensed material onlv at temporary Job sites in the United States where NRC maintains urisdiction. Possession or use of materials at the service contractor's facilities must be authorized under a separate license. In addition, possession should be authorized nly to the extent that licensed material originating from the site must be transferred to an authorized recipient or left at the site. Possession (at the temporary job site) of calibration sources, reference standards, and contaminated equipment owned by the licensee may be authorized under the service license. See example license condition 1 in the appendix.

4.2 The licensee should be required to notify the Administrator of the region issuing the license at least 14 days before initiating activities at a temporary job site. See example license condition 2 in the appendix.

4.3 If the site owner/operator (i.e., the customer) also holds a license issued by the NRC or an Agreement State, the service licensee should be required to establish a written agreement between the licensee and the customer specifying which licensee activities will be performed under the customer's license and supervision, and which licensee activities will be performed under the licensee's supervision pursuant to the service license. This agreement should include commitments by both licensees to ensure safety and it should specify whether there are any commitments by the service licnsee to help the customer clean up the temporary job site if there is an accident. See example license condition 3 in the appendix.

2 Frc Q4-n Rpv. n

4.4 The service licensee should maintain records of information important to decommissioning a temporary job site at the site pursuant to 10 CFR 30.35(g), 40.36(f), and 70.25(g). Customers should have access to decommissioning records throughout the decommissioning process. The service licensee should transfer these records to the customer when activities at a temporary job site are complete. See example license condition 4 in the appendix.

4.5 A service licensee may be exempted from the requirements in 10 CFR 30.35, 40.36, and 70.25 to establish decommissioning financial assurance. NMSS has made a finding that this exemption will not endanger life, or property, or the common defense and security, and is otherwise in the public interest. This exemption is based on the provision stated above in 4.1 that the service licensee is not allowed to retain possession of any licensed material originating from a temporary job site. The site owner remains responsible for eventual release of the site regardless of who monitors and supervises specific work activities. If the site owner is a licensee that has established decommissioning financial assurance or other license commitments, the site owner is responsible for ensuring that its contractors comply with those commitments. See example license condition 5 in the appendix.

4.6 An application for a service license is not required to contain an emergency plan even if the application requests authorization to use licensed material in quantities exceeding the threshold for an emergency plan. Service licensees are not in a position to establish all of the site-specific response measures necessary to execute an effective emergency plan for a temporary job site. Before handling licensed material at any one site in quantities requiring an emergency plan, the service licensee must either obtain NRC approval of an evaluation demonstrating that an emergency plan is not required, or submit written confirmation that licensee personnel have been trained and will follow an existing emergency plan for the temporary job site. See example license condition 6 in the appendix.

3 FC q4U-2. RAY. 0

4.7 It is in the public interest to have site remediation service licensees who can provide immediate services in the event of a release or other incident involving uncontrolled radioactive material. However, license conditions require service licensees to establish written agreements and provide advance notification before providing services. Service licensees may be authorized to take reasonable action in an emergency that departs from conditions in the license when the action s immediately needed to protect public health and safety and no action consistent with all license conditions that can provide adequate or equivalent protection is immediately apparent. The licensee should notify the NRC before, if practicable, and in any case immediately after taking such emergency action. See example license condition 7 in the appendix.

4.8 Within 30 days of completing activities at each temporary job site, the service licensee must notify its licensing region. The notification should include the status of the temporary job site and the disposition of the material used by the service licensee. See example license condition 8 in the appendix.

4.9 Service licenses are not temporary licenses that are only in effect while work at a temporary job site is in progress. The applicant must make a clear commitment to maintain all radiation safety programs in an active status even between jobs. Service licensees may not suspend radiation programs and then attempt to re-establish them when another customer is found. This commitment should provide reasonable assurance that the licensee will remain competent to use licensed material and undertake authorized activities. This commitment should include the following:

A. Maintaining qualified personnel in key positions (i.e., RSO, etc.).

B. Holding required safety committee meetings.

C. Performing regular maintenance and calibration of safety equipment.

D. Completing required training (including periodic retraining).

4 FC Q4-02. Rev. 0

Appendix EXAMPLE LICENSE CONDITIONS FOR SERVICE LICENSES

1. Licensed materials shall be used only at temporary job sites of the licensee anywhere in the United States where the U.S. Nuclear Regulatory Commission maintains jurisdiction for regulating the use of licensed material. Except for calibration sources, reference standards, and radioactively contaminated equipment owned by the licensee, possession of licensed material at each temporary job site shall be limited to material originating from each site.

This material must either be transferred to an authorized recipient or remain at the site after licensee activities are completed.

2. The licensee shall notify the Regional Administrator, NRC Region in writing at least 14 days before initiating activities under this license at a temporary job site. This notification shall include:

A. The estimated type, quantity, and physical/chemical forms of licensed material to be used, B. The specific site location, C. A description of planned activities including waste management and disposition, D. The estimated start date and completion date for the job, and E. The name and title of a point of contact for the job, including information on how to contact the individual.

3. This license does not authorize the use of licensed material at temporary job sites for uses already specifically authorized by a customer's license. If a customer also holds a license issued by the NRC or an Agreement State, the licensee shall establish a written agreement between the licensee and the customer specifying which licensee activities shall be performed under the customer's license and supervision, and which licensee activities shall be performed under the licensee's supervision pursuant to this license. The agreement shall include a commitment by the licensee and the customer to ensure safety, and any commitments by the licensee to help the customer clean up the temporary job site if there is an accident. A copy of this agreement shall be included in the notification required by license condition [example 2 above].
4. The licensee shall maintain records of information important to decommissioning each temporary job site at the applicable job site pursuant to 10 CFR 30.35(g), 40.36(f), and 70.25(g). The records shall be made available to the customer upon request. At the completion of activities at a temporary job site, the licensee shall transfer these records to the customer for retention.

Al FC 94 Rv.

5. Pursuant to 10 CFR 30.11, 40.14, 70.14, and license condition example 1 above], the licensee is exempted from the requirements of 10 CFR 30.35, 40.36, and 70.25 to establish decommissioning financial assurance.
6. Notwithstanding the requirements in 10 CFR 30.32(i), 40.31(j), and 70.22(i),

the licensee is not required to establish an emergency plan. Before taking possession of licensed material at a temporary job site in quantities requiring an emergency plan the licensee shall either --

A. Obtain NRC approval of an evaluation demonstrating that an emergency plan is not required pursuant to 10 CFR 30.32(i), 40.31(j), and 70.22(i), or B. Submit written confirmation to the Regional Administrator, NRC Region , that licensee personnel have been trained and will follow the provisions of an existing emergency plan approved by the NRC or an Agreement State for the temporary job site.

7. If approved by a Radiation Safety Officer specifically identified in this license, the licensee may take reasonable action in an emergency that departs from conditions in this license when the action is immediately needed to protect public health and safety and no action consistent with all license conditions that can provide adequate or equivalent protection is immediately apparent. The licensee shall notify the NRC before, if practicable, and in any case immediately after taking such emergency action using the reporting procedure specified in 10 CFR 30.50(c).
8. Within 30 days of completing activities at each job site location, the licensee shall notify the Regional Administrator, Region _, in writing of the temporary job site status and the disposition of any licensed material used.

A2 rr GA-n R n