ENS 54381: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 23: | Line 23: | ||
As of today [November 12, 2019], 0730 CST, the gauge is secure, but unlockable. The licensee has contacted the manufacturer for assessment and repair. Ronan is scheduled to arrive on November 14, 2019. The incident remains open until the appropriate repairs are completed. | As of today [November 12, 2019], 0730 CST, the gauge is secure, but unlockable. The licensee has contacted the manufacturer for assessment and repair. Ronan is scheduled to arrive on November 14, 2019. The incident remains open until the appropriate repairs are completed. | ||
Alabama Incident 19-32 | Alabama Incident 19-32 | ||
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2019/ | | URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2019/20191121en.html#en54381 | ||
}} | }} | ||
{{ENS-Nav}} | {{ENS-Nav}} |
Latest revision as of 08:30, 21 November 2019
Where | |
---|---|
Nucor Steel Tuscaloosa Tuscaloosa, Alabama (NRC Region 1) | |
Organization: | Alabama Radiation Control |
Reporting | |
Agreement State | |
Time - Person (Reporting Time:+74.7 h3.113 days <br />0.445 weeks <br />0.102 months <br />) | |
Opened: | Myron Riley 08:42 Nov 12, 2019 |
NRC Officer: | Thomas Kendzia |
Last Updated: | Nov 12, 2019 |
54381 - NRC Website | |