#REDIRECT [[L-15-002, Firstenergy Nuclear Operating Company'S (Fenoc'S) Fourth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies]]
| number = ML15057A398
| issue date = 02/26/2015
| title = Davis-Besse and Perry - Firstenergy Nuclear Operating Company'S (Fenoc'S) Fourth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies
| author name = Belcher S L
| author affiliation = FirstEnergy Nuclear Operating Co
| addressee name =
| addressee affiliation = NRC/Document Control Desk, NRC/NRR
| docket = 05000334, 05000346, 05000412, 05000440
| license number = DPR-066, NPF-003, NPF-058, NPF-073
| contact person =
| case reference number = EA-12-049, L-15-002, TAC MF0841, TAC MF0842, TAC MF0961, TAC MF0962
| document type = Letter, Status Report
| page count = 26
| project = TAC:MF0841, TAC:MF0842, TAC:MF0961, TAC:MF0962
| stage = Other
}}
 
=Text=
{{#Wiki_filter:FENOCFirs't Energ/
M.,c.ea, qprr"rrngc 76 South Main Street Akron. Ohio 44308 Samuel L. BelcherSenior Vice President and Chief Operating Officer February 26,2015 L-15-002 ATTN: Document Control Desk U.S. Nuclear Regulatory CommissionWashington, DC 20555-001 10 cFR 2.202
 
==SUBJECT:==
Beaver Valley Power Station, Unit Nos. 1 and 2 Docket No. 50-334, License No. DPR-66Docket No.
50-412, License No. NPF-73 Davis-Besse Nuclear Power Station Docket No. 50-346, License No. NPF-3Perry Nuclear Power Plant Docket No. 50-440, License No. NPF-58 FirstEnerqy Nuclear Operatinq Companv's (FENOC's)
Fourth Six-Month Status Repo!-tin Responseto Merch 12.2012 Commission Order Mqdifying Licenses,with Resard to Requirements for Mitigation Strateoies for Bevond-Desiqn-Basis External Eve.nts (Order Number EA-12-049) (TAC Nos. MF0841, MF0842. Mt0961, ?qd MF0962)On March 1 2,2012, the Nuclear Regulatory Commission (NRC or Commission) issuedan order (Reference
: 1) to FENOC. Reference 1 was immediately effective and directs FENOC to develop, implement, and maintain guidance and strategies to maintain or restore core cooling, containment, and spent fuel pool cooling capabilities in the eventof a beyond-design-basis external event.
Specific requirements are outlined in Attachment 2 of Reference 1.
Reference 1 required submission of an initial status report 60 days following issuance of the final interim staff guidance (Reference 2) and an overall integrated plan pursuant to Section lV, Condition C. Reference2 endorses industry guidance document NuclearEnergy Institute (NEl) 12-06, Revision 0 (Reference
: 3) with clarifications and exceptions identified in Reference 2. Reference 4 provided the FENOC initial status report regarding mitigation strategies. Reference 5 provided the FENOC overall integrated plan for Beaver Valley Power Station (BVPS), Unit Nos. 1 and 2, Davis-Besse Nuclear Power Station (DBNPS), and Perry Nuctear Power Plant (PNPP). Reference 6 provided a revision to the PNPP OlP.Reference 1 requires submission of a status report at six-month intervals following submittal of the overall integrated plan. Reference 3 provides direction regarding the Beaver Valley Power Station, Unit Nos. 1 and 2Davis-Besse Nuclear Power StationPerry Nuclear Power Plant L-15-002 Page 2content of the status reports. The purpose of this letter is to provide the fourthsix-month status report pursuant to Section lV, Condition C.2, of Reference 1, that delineates progress made in implementing the requirements of Reference
: 1. The attached reports for BVPS, DBNPS, and PNPP (Attachments 1,2, and 3, respectively) provide an update of milestone accomplishments since the last status report, includingany changes to the compliance method, schedule, or need for relief/relaxation and the basis, if any.This letter contains no new regulatory commitments.
lf you have any questions regarding this report, please c-ontact Mr. Thomas A. Lentz, Manager - Fleet Licensing,at 330-315-6810.
I declare under penalty of perjury that the foregoing is true and correct. Executed on February 'Ll ,2015.Respectfully, Samuel L. Belcher Attachments:
: 1. Beaver Valley Power Station Fourth Six-Month Status Report for the f mplementatibn of Order EA-1 2-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events Z. Davis-Besse Nuclear Power Station Fourth Six-Month Status Report for the lmplementation of Order EA-1 2-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events 3. perry Nuclear Power Plant Fourth Six-Month Status Report for the lmplementationof Order EA-1 2-049, Order Modifying Licenses with Regard to Requirements forMitigation Strategies for Beyond-Design-Basis External Events
 
==References:==
: 1. NRC Order Number EA-1 2-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, dated March 12,2012 Z. NRC Interim Staff Guidance JLD-lSG-2O1 2-01, Compliance with Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation ltflggiesfor Beyond-DeJign-Basis ExternalEvents, Revision 0, dated August 29,201.2 3. NEI 12-06, Diverse and Flexible Coping Strategies (FLEX) lmplementation Guide,Revision 0, dated August2012 6.Beaver Valley Power Station, Unit Nos. 1 and 2Davis-Besse Nuclear Power Station Perry Nuclear Power Plant L-15-002Page 34. FirstEnergy Nuclear Operating Company's (FENOC's) Initial Status Report in Responseio March 12,2012 bommission Order Modifoing Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049), dated October 26,2012 b. FirstEnergy Nuclear Operating Company's (FENOC's) Overall Integrated Plan inResponseio March ii, z7l2 -Commission Order Modifying Licenses with Regardto Requirements for Mitigation Strategies for Beyond-Design-Basis External Events cc: (Order Number EA-12-049), dated February 27,2013FirstEnergy Nuclear Operating Company's (FENOC's)
Revision of Overall f ntegrateJ Plan for Peiry Nuclear Power Plant in Response to March 12,2012 Commission Order Nnodifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Oeiign-Basis External Events (Order Number EA-12-049),dated September 25, 2014.Director, Office of Nuclear Reactor Regulation (NRR)NRC Region I AdministratorNRC Region lll Administrator NRC Resident Inspector (BVPS)NRC Resident Inspector (DBNPS)NRC Resident Inspector (PNPP)NRC Project Manager (BVPS)NRC Project Manager (DBNPS)NRC Project Manager (PNPP)Ms. Jessica A. Kratchman, NRR/JLD/PMB, NRCDirector BRP/DEP (without Attachments)Site BRPIDEP Representative (without Attachments)
Utility Radiological Safety Board (without Attachments)}}