ML112360130: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 11/14/2011
| issue date = 11/14/2011
| title = 2010 DFS Report Analysis for Fermi (Enrico) Atomic Power Plant, Unit 2
| title = 2010 DFS Report Analysis for Fermi (Enrico) Atomic Power Plant, Unit 2
| author name = Szabo A L
| author name = Szabo A
| author affiliation = NRC/NRR/DIRS
| author affiliation = NRC/NRR/DIRS
| addressee name =  
| addressee name =  
Line 13: Line 13:
| page count = 5
| page count = 5
}}
}}
=Text=
{{#Wiki_filter:Datasheet 1 Plant name:                  Fermi (Enrico) Atomic Power Plant, Unit 2                                                  Docket Number:                                  50-341 1      The minimum financial assurance (MFA) estimate pursuant to 10 CFR 50.75(b) & (c):                                                            $968,000,000 Did the licensee identify the amount of estimated radiological funds? (Y/N)                                                            Y1 2                The total amount of dollars accumulated at the end of the appropriate year: (see below)
Licensee:          % Owned: Category:                        Amount in Trust Fund:
Detroit Edison        100.00%          1                          $874,000,000 Total Trust Fund Balance        $874,000,000 3      Schedule of the annual amounts remaining to be collected: (provided/none)                                                                        provided 4      Assumptions used in determining rates of escalation in decommissioning costs, rates of earnings on decommissioning funds, and rates of other factors used in funding projections: (see below)
Post-RAI Rate of                  Rate(s) of                    PUC                                      RAI          PUC        Allowed        Rates Escalation                  Real Rate                  Allowed through Decom Return on                    Other                  Verified                                    Needed      Verified      through    Determined Rate                      of Return                          (Y/N)
Earnings                    Factors                    (Y/N)                                    (Y/N)        (Y/N)    Decom (Y/N)      (Y/N) 7.00%        6.00%                      1.00%          N                    N                  Y            Y            N            N 5      Any contracts upon which the licensee is relying? (Y/N)                                                                                              N 6      Any modifications to a licensee's method of providing decommissioning funding assurance? (Y/N)                                                      N 7      Any material changes to trust agreements? (Y/N)                                                                                                      N If a change has occurred, the reviewer will document on this sheet that a change has occurred and identify the reviewer who will evaluate the change: (see below) 1 The amount of MFA estimated is based on a Bx value that uses Direct Disposal without the use of Vendors Signature: Michael Purdie and Jo Ann Simpson Date: 06/30/2011 Signature: Aaron L. Szabo                                                                                                                      Spreadsheet created by: Aaron Szabo, Shawn Harwell Date: 7/27/2011                                                                                                                                              Formulas verified by: Clayton Pittiglio
Datasheet 2 Plant name:                  Fermi (Enrico) Atomic Power Plant, Unit 2                                        Docket Number:                50-341 Month:                Day                      Year:
Date of Operation:                                    12                31                      2010 Termination of Operations:                                    3                  20                      2025 Latest                    Latest BWR/PWR          MWth            1986$            ECI      Base Lx                      Lx          Px                Base Px    Fx            Base Fx      Ex                Bx Month Px                  Month Fx BWR          3430        $135,000,000        111.3        2.08        0.65          2.32        1.676      191.4    114.2    3.049  250.0    82.0  0.13 2.307 0.22      24.356 NRC Minimum:                                $967,014,283                                Site Specific:
Amount of NRC Minimum/Site Licensee:              % Owned:        Category                  Specific:                Amount in Trust Fund:
Detroit Edison            100.00%            1                  $967,014,283                    $874,000,000 Total Fund Balance:          $874,000,000 Step 1:
Earnings Credit:
Real Rate of Return Years Left Trust Fund Balance:          per year      in License      Total Earnings:          Does Licensee Pass:
      $874,000,000                2%            14.22        $1,158,256,369                  YES Step 2:
Accumulation:
Value of Annuity per year (amount/See Annuity      Real Rate of Return    Number of Annual Sheet)                per year              Payments:                Total Annuity:
see annuity sheet      See Annuity Sheet            15                See Total Step 2 Real Rate of Return  Years remaining after Total Annuity            per year                annuity                Total Step 2:
See Total Step 2      See Annuity Sheet            N/A                  $486,343,871 Total Step 1 + Step 2      Does Licensee Pass:
                                                                              $1,644,600,240                  YES Step 3:
Decom Period:
Real Rate of Return  Decom        Total Earnings for Total Earnings:            per year        Period:            Decom:
      $1,644,600,240                2%              7            $122,264,242 Total of Steps 1 thru 3:    Does Licensee Pass:      Shortfall:
                                                                              $1,766,864,483                  YES                NO Signature: Michael Purdie and Jo Ann Simpson Date: 06/30/2011 Signature: Aaron L. Szabo                                                                                                                                                  Spreadsheet created by: Aaron Szabo, Shawn Harwell Date: 7/27/2011                                                                                                                                                                          Formulas verified by: Clayton Pittiglio
Datasheet 2 Plant name:                      Fermi (Enrico) Atomic Power Plant, Unit 2                                      Docket Number:          50-341 Month:                Day                    Year:
Date of Operation:                                        12                31                      2010 Termination of Operations:                                      3                  20                      2025 If licensee is granted greater than 2% RRR Step 4:
Earnings Credit:
Real Rate of Return Years Left Trust Fund Balance:            per year      in License      Total Earnings:        Does Licensee Pass:
      $874,000,000                  2.00%            14.22        $1,158,256,369                  YES Step 5:
Accumulation:
Real Rate of Return    Number of Annual Value of Annuity per year          per year              Payments:              Total Annuity:
see annuity sheet          See Annuity Sheet            15                See Total Step 4 Real Rate of Return  Years remaining after Total Annuity                per year                annuity                Total Step 5 See Total Step 4          See Annuity Sheet            N/A                  $486,343,871 Total Step 4 + Step 5    Does Licensee Pass:
                                                                                $1,644,600,240                  YES Step 6:
Decom Period:
Real Rate of Return  Decom        Total Earnings for Total Earnings:              per year        Period:            Decom:
      $1,644,600,240                2.00%              7            $122,264,242 Total of Steps 4 thru 6:  Does Licensee Pass:      Shortfall:
                                                                                $1,766,864,483                  YES                NO Signature: Michael Purdie and Jo Ann Simpson Date: 06/30/2011 Signature: Aaron L. Szabo                                                                                                                          Spreadsheet created by: Aaron Szabo, Shawn Harwell Date: 7/27/2011                                                                                                                                                  Formulas verified by: Clayton Pittiglio
Datasheet 2 ANNUITY Termination of Operations:                  3            20 2025 Real Rate      Total Year          Annuity:      of Return: Accumulation 2011      $28,000,000        2%      $37,107,786 2012      $28,000,000        2%      $36,380,182 2013      $28,000,000        2%      $35,666,845 2014      $28,000,000        2%      $34,967,495 2015      $28,000,000        2%      $34,281,858 2016      $28,000,000        2%      $33,609,665 2017      $28,000,000        2%      $32,950,652 2018      $28,000,000        2%      $32,304,561 2019      $28,000,000        2%      $31,671,138 2020      $28,000,000        2%      $31,050,135 2021      $28,000,000        2%      $30,441,309 2022      $28,000,000        2%      $29,844,421 2023      $28,000,000        2%      $29,259,236 2024      $28,000,000        2%      $28,685,525 2025      $28,000,000        2%      $28,123,064 Total:      $486,343,871 Signature: Michael Purdie and Jo Ann Simpson Date: 06/30/2011 Signature: Aaron L. Szabo                                        Spreadsheet created by: Aaron Szabo, Shawn Harwell Date: 7/27/2011                                                                Formulas verified by: Clayton Pittiglio
Datasheet 2 ANNUITY Termination of Operations:                      3            20 2025 If licensee is granted greater than 2% RRR Real Rate      Total Year          Annuity:      of Return: Accumulation 2009              $0            2.00%          $0 2010              $0            2.00%          $0 2011        $28,000,000        2.00%      $37,107,786 2012        $28,000,000        2.00%      $36,380,182 2013        $28,000,000        2.00%      $35,666,845 2014        $28,000,000        2.00%      $34,967,495 2015        $28,000,000        2.00%      $34,281,858 2016        $28,000,000        2.00%      $33,609,665 2017        $28,000,000        2.00%      $32,950,652 2018        $28,000,000        2.00%      $32,304,561 2019        $28,000,000        2.00%      $31,671,138 2020        $28,000,000        2.00%      $31,050,135 2021        $28,000,000        2.00%      $30,441,309 2022        $28,000,000        2.00%      $29,844,421 2023        $28,000,000        2.00%      $29,259,236 2024        $28,000,000        2.00%      $28,685,525 2025        $28,000,000        2.00%      $28,123,064 Total:      $486,343,871 Signature: Michael Purdie and Jo Ann Simpson Date: 06/30/2011 Signature: Aaron L. Szabo                                          Spreadsheet created by: Aaron Szabo, Shawn Harwell Date: 7/27/2011                                                                  Formulas verified by: Clayton Pittiglio}}

Latest revision as of 16:43, 12 November 2019

2010 DFS Report Analysis for Fermi (Enrico) Atomic Power Plant, Unit 2
ML112360130
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 11/14/2011
From: Szabo A
Division of Inspection and Regional Support
To:
Szabo, A L, NRR/DPR, 415-1985
References
Download: ML112360130 (5)


Text

Datasheet 1 Plant name: Fermi (Enrico) Atomic Power Plant, Unit 2 Docket Number: 50-341 1 The minimum financial assurance (MFA) estimate pursuant to 10 CFR 50.75(b) & (c): $968,000,000 Did the licensee identify the amount of estimated radiological funds? (Y/N) Y1 2 The total amount of dollars accumulated at the end of the appropriate year: (see below)

Licensee:  % Owned: Category: Amount in Trust Fund:

Detroit Edison 100.00% 1 $874,000,000 Total Trust Fund Balance $874,000,000 3 Schedule of the annual amounts remaining to be collected: (provided/none) provided 4 Assumptions used in determining rates of escalation in decommissioning costs, rates of earnings on decommissioning funds, and rates of other factors used in funding projections: (see below)

Post-RAI Rate of Rate(s) of PUC RAI PUC Allowed Rates Escalation Real Rate Allowed through Decom Return on Other Verified Needed Verified through Determined Rate of Return (Y/N)

Earnings Factors (Y/N) (Y/N) (Y/N) Decom (Y/N) (Y/N) 7.00% 6.00% 1.00% N N Y Y N N 5 Any contracts upon which the licensee is relying? (Y/N) N 6 Any modifications to a licensee's method of providing decommissioning funding assurance? (Y/N) N 7 Any material changes to trust agreements? (Y/N) N If a change has occurred, the reviewer will document on this sheet that a change has occurred and identify the reviewer who will evaluate the change: (see below) 1 The amount of MFA estimated is based on a Bx value that uses Direct Disposal without the use of Vendors Signature: Michael Purdie and Jo Ann Simpson Date: 06/30/2011 Signature: Aaron L. Szabo Spreadsheet created by: Aaron Szabo, Shawn Harwell Date: 7/27/2011 Formulas verified by: Clayton Pittiglio

Datasheet 2 Plant name: Fermi (Enrico) Atomic Power Plant, Unit 2 Docket Number: 50-341 Month: Day Year:

Date of Operation: 12 31 2010 Termination of Operations: 3 20 2025 Latest Latest BWR/PWR MWth 1986$ ECI Base Lx Lx Px Base Px Fx Base Fx Ex Bx Month Px Month Fx BWR 3430 $135,000,000 111.3 2.08 0.65 2.32 1.676 191.4 114.2 3.049 250.0 82.0 0.13 2.307 0.22 24.356 NRC Minimum: $967,014,283 Site Specific:

Amount of NRC Minimum/Site Licensee:  % Owned: Category Specific: Amount in Trust Fund:

Detroit Edison 100.00% 1 $967,014,283 $874,000,000 Total Fund Balance: $874,000,000 Step 1:

Earnings Credit:

Real Rate of Return Years Left Trust Fund Balance: per year in License Total Earnings: Does Licensee Pass:

$874,000,000 2% 14.22 $1,158,256,369 YES Step 2:

Accumulation:

Value of Annuity per year (amount/See Annuity Real Rate of Return Number of Annual Sheet) per year Payments: Total Annuity:

see annuity sheet See Annuity Sheet 15 See Total Step 2 Real Rate of Return Years remaining after Total Annuity per year annuity Total Step 2:

See Total Step 2 See Annuity Sheet N/A $486,343,871 Total Step 1 + Step 2 Does Licensee Pass:

$1,644,600,240 YES Step 3:

Decom Period:

Real Rate of Return Decom Total Earnings for Total Earnings: per year Period: Decom:

$1,644,600,240 2% 7 $122,264,242 Total of Steps 1 thru 3: Does Licensee Pass: Shortfall:

$1,766,864,483 YES NO Signature: Michael Purdie and Jo Ann Simpson Date: 06/30/2011 Signature: Aaron L. Szabo Spreadsheet created by: Aaron Szabo, Shawn Harwell Date: 7/27/2011 Formulas verified by: Clayton Pittiglio

Datasheet 2 Plant name: Fermi (Enrico) Atomic Power Plant, Unit 2 Docket Number: 50-341 Month: Day Year:

Date of Operation: 12 31 2010 Termination of Operations: 3 20 2025 If licensee is granted greater than 2% RRR Step 4:

Earnings Credit:

Real Rate of Return Years Left Trust Fund Balance: per year in License Total Earnings: Does Licensee Pass:

$874,000,000 2.00% 14.22 $1,158,256,369 YES Step 5:

Accumulation:

Real Rate of Return Number of Annual Value of Annuity per year per year Payments: Total Annuity:

see annuity sheet See Annuity Sheet 15 See Total Step 4 Real Rate of Return Years remaining after Total Annuity per year annuity Total Step 5 See Total Step 4 See Annuity Sheet N/A $486,343,871 Total Step 4 + Step 5 Does Licensee Pass:

$1,644,600,240 YES Step 6:

Decom Period:

Real Rate of Return Decom Total Earnings for Total Earnings: per year Period: Decom:

$1,644,600,240 2.00% 7 $122,264,242 Total of Steps 4 thru 6: Does Licensee Pass: Shortfall:

$1,766,864,483 YES NO Signature: Michael Purdie and Jo Ann Simpson Date: 06/30/2011 Signature: Aaron L. Szabo Spreadsheet created by: Aaron Szabo, Shawn Harwell Date: 7/27/2011 Formulas verified by: Clayton Pittiglio

Datasheet 2 ANNUITY Termination of Operations: 3 20 2025 Real Rate Total Year Annuity: of Return: Accumulation 2011 $28,000,000 2% $37,107,786 2012 $28,000,000 2% $36,380,182 2013 $28,000,000 2% $35,666,845 2014 $28,000,000 2% $34,967,495 2015 $28,000,000 2% $34,281,858 2016 $28,000,000 2% $33,609,665 2017 $28,000,000 2% $32,950,652 2018 $28,000,000 2% $32,304,561 2019 $28,000,000 2% $31,671,138 2020 $28,000,000 2% $31,050,135 2021 $28,000,000 2% $30,441,309 2022 $28,000,000 2% $29,844,421 2023 $28,000,000 2% $29,259,236 2024 $28,000,000 2% $28,685,525 2025 $28,000,000 2% $28,123,064 Total: $486,343,871 Signature: Michael Purdie and Jo Ann Simpson Date: 06/30/2011 Signature: Aaron L. Szabo Spreadsheet created by: Aaron Szabo, Shawn Harwell Date: 7/27/2011 Formulas verified by: Clayton Pittiglio

Datasheet 2 ANNUITY Termination of Operations: 3 20 2025 If licensee is granted greater than 2% RRR Real Rate Total Year Annuity: of Return: Accumulation 2009 $0 2.00% $0 2010 $0 2.00% $0 2011 $28,000,000 2.00% $37,107,786 2012 $28,000,000 2.00% $36,380,182 2013 $28,000,000 2.00% $35,666,845 2014 $28,000,000 2.00% $34,967,495 2015 $28,000,000 2.00% $34,281,858 2016 $28,000,000 2.00% $33,609,665 2017 $28,000,000 2.00% $32,950,652 2018 $28,000,000 2.00% $32,304,561 2019 $28,000,000 2.00% $31,671,138 2020 $28,000,000 2.00% $31,050,135 2021 $28,000,000 2.00% $30,441,309 2022 $28,000,000 2.00% $29,844,421 2023 $28,000,000 2.00% $29,259,236 2024 $28,000,000 2.00% $28,685,525 2025 $28,000,000 2.00% $28,123,064 Total: $486,343,871 Signature: Michael Purdie and Jo Ann Simpson Date: 06/30/2011 Signature: Aaron L. Szabo Spreadsheet created by: Aaron Szabo, Shawn Harwell Date: 7/27/2011 Formulas verified by: Clayton Pittiglio