ML11255A026: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:From:HOO Hoc To:HOO Hoc  
{{#Wiki_filter:From:               HOO Hoc To:                 HOO Hoc


==Subject:==
==Subject:==
Logbook Entry: 9/9/2011 - Salem Sturgeon Date:Friday, September 09, 2011 5:46:00 PMOps Officer
Logbook Entry: 9/9/2011 - Salem Sturgeon Date:               Friday, September 09, 2011 5:46:00 PM Ops Officer : PETE SNYDER Entry Date : 9/9/2011 - 17:06 Entry Type : 50.72 LOGGED ONLY Notify Date - Time : 9/9/2011 - 17:03 Event Date - Time : 9/9/2011 - 15:12 (EDT)
: PETE SNYDEREntry Date
Site : SALEM Emergency Class :
: 9/9/2011 - 17:06Entry Type
--------------------------------------------------------------------------------------------
: 50.72 LOGGED ONLYNotify Date - Time
"At 1512 hours on September 9, 2011, a dead shortnose sturgeon was identified at the Salem Generating Station Circulating Water intake structure. This report to the NRC is being made due to the fact that a report to the National Marine Fisheries Service was made at 1620 hours in accordance with the site Incidental Take Statement. Additionally, a report to New Jersey Department of Environmental Protection was also made at 1630 hours. The sturgeon was deceased prior to collection."
: 9/9/2011 - 17:03Event Date - Time
The unit was at 95% Power both before and after the event.
: 9/9/2011 - 15:12 (EDT)
Notified R1DO (Jackson) and the Endangered Species Group via email.}}
Site           : SALEMEmergency Class :
---------------------------------------------------------------------------------------------"At 1512 hours on September 9, 2011, a dead shortnose sturgeon was identified at the Salem Generating Station Circulating Water intake structure. This report to the NRC is being made due to thefact that a report to the National Marine Fisheries Service was made at 1620 hours in accordance withthe site Incidental Take Statement. Additionally, a report to New Jersey Department of EnvironmentalProtection was also made at 1630 hours. The sturgeon was deceased prior to collection."The unit was at 95% Power both before and after the event.Notified R1DO (Jackson) and the Endangered Species Group via email.}}

Revision as of 15:00, 12 November 2019

Shortnose Sturgeon Logbook Entry for 9/9/2011
ML11255A026
Person / Time
Site: Salem  PSEG icon.png
Issue date: 09/09/2011
From:
NRC/NSIR/DPR
To:
NRC/NSIR/DPR
Balsam B
References
Download: ML11255A026 (1)


Text

From: HOO Hoc To: HOO Hoc

Subject:

Logbook Entry: 9/9/2011 - Salem Sturgeon Date: Friday, September 09, 2011 5:46:00 PM Ops Officer : PETE SNYDER Entry Date : 9/9/2011 - 17:06 Entry Type : 50.72 LOGGED ONLY Notify Date - Time : 9/9/2011 - 17:03 Event Date - Time : 9/9/2011 - 15:12 (EDT)

Site  : SALEM Emergency Class :


"At 1512 hours0.0175 days <br />0.42 hours <br />0.0025 weeks <br />5.75316e-4 months <br /> on September 9, 2011, a dead shortnose sturgeon was identified at the Salem Generating Station Circulating Water intake structure. This report to the NRC is being made due to the fact that a report to the National Marine Fisheries Service was made at 1620 hours0.0188 days <br />0.45 hours <br />0.00268 weeks <br />6.1641e-4 months <br /> in accordance with the site Incidental Take Statement. Additionally, a report to New Jersey Department of Environmental Protection was also made at 1630 hours0.0189 days <br />0.453 hours <br />0.0027 weeks <br />6.20215e-4 months <br />. The sturgeon was deceased prior to collection."

The unit was at 95% Power both before and after the event.

Notified R1DO (Jackson) and the Endangered Species Group via email.